Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984
ML20094D761
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/14/1984
From: Cummings G, Wade W
LAWRENCE LIVERMORE NATIONAL LABORATORY
To: Morrill P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20094D695 List:
References
CON-FIN-A-0753, CON-FIN-A-753, CON-FIN-B-8552 WOW:84-12, NUDOCS 8408080515
Download: ML20094D761 (6)


Text

-

7.. - .- - - . . -

Lawrence Livermore National Laboratory A

March 14, 1984 WOW: 84-12 Mr. Phillip J. Morrill, Project Manager.

U. S. Nuclear Regulatory Agency, Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 PROGRESS REPORT, FEBRUARY 1984 TECHNICAL ASSISTANCE FOR INSPECTION OF DIABLO CANYON DESIGN VERIFICATION PROGRAM, FIN B8552 (UNIT 1) AND FIN A0753 (UNIT 2).

i

1. Project Description As a consequence of an Independent Design Verification Program, many modifications and additions to the piping and electr cal raceway support systems and building structural steel are being implemented at the Diablo Canyon Nuclear Power Plant. The LLNL is assisting the NRC Region V office in assessing the adequacy of this work.
2. Progress - February 1984 Inspection work for this report period was focused on the spray hangers
in Unit 2 containment while the scaffolding in this area remains in place. Some structural connections in the containment annulus area were also inspected and citations have been issued by the regional inspectors for two discrepancies found there. One NCR described excessive undercut over an 8" length of a 25"x5/16" fillet weld. The other NCR was for missing washers and torque seal for a high strength bolted connection. All items inspected and the results for both units are listed in Attachment 1.
3. Funding

- A ' detailed report- of expenditures for this period is provided in Attachments 2 & 3. A new proposal for Unit 2 work is in preparation.

4. Personnel, Subcontracts, and Consultants This work is being conducted with assistance from the Energy Measure-ments Group of EG&G, San Ramon Operations.

8400080515 840727 PDR ADOCK 05000275 G PDR An EOAaf Choortwwy Enydopr +77G2/of CaMyrne a RO Bar aos /lerimn N6c5so . rovastAm&&JUrdrdtnJ7merdLFWnaeECw- ow------ -----

f  :;

Mr. Phil Morrill March 14, 1984

-Page 2 5.. Meetings / Travel L

None-

- 6. Concerns t

.None

7. Plans Inspection work is to continue in Unit 2 containment.

~

-WALLACE 0. WADE PROJECT MANAGER EGAG MECHANICAL ENGINEERING DEPARTMENT Approved:

I i

~ GARTH 'E. . CumlNGS DEPUTY PROGRAM LEADER NUCLEAR' SYSTEM SAFETY PROGRAM WOW: cog

. Attachment Distribution:

LLNL- NRC EG8G/SRO Gumings R. Gilbert , A. Debeling J. Johnson D. Ki rstA ~ R. Pong R. Langland H. Canter C. Morton M. Eli T. Bishop R.-Bogdanowicz E. Frigillana C.- Meier

Page 1 of 2 l .

ATTACHMENT 1 0

N

' LOG - 1 PART START COMPLETE STATUS MAN NUM LOC i ITEM NUMBER DATE DATE CRIT CONTACTS AFF STATUS DATE INSP HRS E1083 TURBINE BLD6 i RACEWAY SUPPORT 44/D-140-6-77 1/19/84 2/28/84 QCP 3 MORRIS 0N PG PHYSifAL 1/19/84 RMB 1.0 QCP 5A BRUNKE F0 MR 2777 1/19/84 QCP 9 ACC-W/0-QA 2/28/84 RMB 1.0 QCP E9 M0056 CONTA! MENT 2 SPRAY HANGER 20-93R 7/12/83 2/09/04 ESD 223 THOMAS P6 PHYSICAL 9/02/83 M E 3.0 M0YER BE DR-5105 9/02/83 NRNIS BE ACCEPTED 2/09/84 M E 5.0 2/09/84 RMB 1.0 M0081 C041TAINMENT 2 SPRAY HANSER 20-94R 7/19/83 2/09/84 ESD 223 THOMAS P6 CITAT!DN 8/20/93 ME 5.0 M0YER BE DR-5090 8/20/83 HERNANDEZ NR ACCEPTED 2/09/94 ME 4.0 2/09/84 RMB 1.0 M0091 CONTA!NMENT 2 SPRAY HANGER 20-95R 7/22/83 2/09/84 ESD 223 THOMAS PG ACCEPTED 2/09/84 ME 7.0 M0YER BE 2/09/84 RMB 1.0 M1015 AUI BLD6 - 1 PIPE HAN6ER 73-63R 12/15/03 2/28/84 ESD 223 NASADOWSKI P6 RECORDS 12/15/83 RMB 2.0 PHYSICAL 12/15/83 RMB 1.0 ACC-W/0-QA M1016 AUI BLD6 1 PIPE HANGER 230-1R 1/05/84 2/29/84 ESD 223 NASADOWSKI PG RECORDS 1/05/84 RMB 2.0 PHYSICAL 1/05/84 RMB 1.0 ACC-W/0-QA

.M1017 AUI BLD6 1 PIPE HAM 6ER 322-4R 1/05/84 2/29/84 ESD 223 NASADOWSKI P6 RECORDS 1/05/84 RMB 2.0 PHYSICAL 1/05/84 RMB 1.0 ACC-W/0-QA M1019 CONTAINMENT '2 SPRAY HAN6ER 20-41R 1/31/84 2!02/84 ESD 223 MICHAELS P6 ACCEPTED 2/02/84 ME 7.0 M1020 CONTAIMENT 2 SPRAY HANGER 414-32R 1/31/84 2/07/84 ESD 223 MICHAELS PS PHYSICAL 2/03/84 ME 8.0 ACCEPTED 2/08/84 M E 3.0

- M1021 CONTA!NMENT 2 SPRAY HAN6ER 20-35R 2/06/84 2/08/84 ESD 223 C CHAELS P6 ACCEPTFD 1/26/84 RP 3.0

, 022 CONTA! MENT 2 SPRAY HANGER 20-42R 2/06/84 2/08/84 ESD 223 MICHAELS P6 ACCEPTED 1/26/84 RP 2.0

.'M1023 CONTA!NMENT - 2 SPRAY HAN6ER 414-133R 2/06/84 2/08/84 ESD 223 MICHAELS P6 ACCEPTED 1/26/84 RP 2.0 MI 4 CONTAINMENT 2 SPRAY HAN6ER 20-2R 2/06/84 2/08/84 ESD 223 MICHAELS PS ACCEPTED 2/08/84 ME 3.0

--M1025 COWTAINMENT ~2 SPRAY HAN6ER 20-3R 2/06/84 2/08/84 ESD 223 MICHAELS PS ACCEPTED 2/08/84 ME 3.0 m ~ M1026 CONTAIMENT '

2 SPRAY HANSFR '20-4R 2/06/84 2/08/84 ESD 223 MICHAELS PS ACCEPTED 2/08/84 ME 3.0 2/08/84 M E 3.0 027 C3NTA! MENT' - 2 SPRAY HAN6ER 20-43R 2/06/84 2/08/84 ESD 223 MICHAELS P6 ACCEPTED 028 CONTAIMENT 2 SPRAY HAN6ER 20-44R 2/06/84 2/08/84 ESD 223 MICHAELS PS ACCEPTED 2/08/84 M E 3.0

~M1029 CONTA! MENT 2 SPRAY HANGER 414-83R 2/09/84 ESD 223 MICHAELS P6 ORIENT *N 2/09/84 ME 3.0 M1033 CONTA! WENT 2 SPRAY HAN6ER 20-50R 2/15/84 2/16/84 ESD 223 BERNASCONI PS ACCEPTED 2/16/84 RP 2.0

. M1034 CGNTAIMENT 2 SPRAY HAN6ER 20-52R 2/15/64 2/16/84 ESD 223 BERNASCONI P6 ACCEPTED 2/16/84 RP 2.0 m035 CONTAl WENT 2 SPRAY HAN6ER 414-83R 2/15/84 2/16/84 ESD 223 BERNASCONI F6 REC 0FDS 2/16/84 RMB 8,0 MICHAELS P6 ACC-W/0-GA 2/29/84 RMB  !.0 i

M1036 CONTAIMENT 2 SPRAY HANGER 20-91R 2/15/84 2/79/84 ESD 223 BERNASCONI P6 RECORDS 2/16/84 RMB 8.0 MICHAELS PS PHYSICAL 2/16/84 RMB 1.0 DR 8115 2/16/84 DP-2-786-M 2/29/84 ACCEPTED 2/29/84 M1037 CONTAINMENT 2 SPRAY HANGER 20-58R 2/15/84 2/29/94 ESD 223 BERNASCONI P6 RECORDS 2/16/84 RMB B.0 ACC-W/0-QA 2/29/84 RMB 1.0 ir

~

'M1038 CONTA! MENT

' 2 SPRAY HAN6ER 20-96R 2/22/84 ESD 223 BERNASCON! P6 WELD 2/22/84 ME 15.0 MICHAELS P6 2/22/84 M E T039 C0hfA! MENT 2 SPRAY HANGER 414-46R 2/22/84 2/24/84 ESD 223 BERNASCONI P6 ACCEPTED 2/24/84 ME 3.0 MICHAELS P6 M1040 CONTA!NMENT 2 SPRAY HAN6ER 20-33R 2/23/84 ESD 223 MICHAELS P6 DR 2/23/84 ME 3.0

- M1041 TONTAI MENT 2 SPRAY HANGER 20-75R 2/2?/84 3/02/84 ESO 223 BERNASCONI P6 ACCEPTED 3/02/84 RMB 5.0

-51020 CONTAIMENT -2 ANNULUS 10003-C2-13-069 2/01/84 2/09/84 QCP 3 KOHLER BE RECORDS 2/03/84 M E 5.0 QCP 5A MUNR0 BE QCP C7 BECK 0RT F0

S1021 CONTAIMENT ' 2 ANNULUS 10033-C2-13-242 2/01/84 2/09/84 QCP 3 K0HLER BE RECORDS 2/03/84 ME 5.0 QCP 5A MUNR0 BE ACC-W/0-QA 2/09/84 M E 3.0 QCP C7 PECK 0RT F0 S1022 CONTAI MENT: 2 AMULUS 10003-C2-13-071 2/01/84 2/09/84 QCP 3 KOHLER BE RECORDS 2/03/84 ME 5.0 QCP 5A MUNR0 6E ACC-W/0-QA 2/09/84 M E 3.0 QCP C7 BECK 0RT F0 S1023 CONTAINMENT 2 ANNULUS '10003-C2-13-080 2/01/84 2/09/84 QCP 3 K0HLER BE RECORDS 2/03/84 ME 5.0 QCP 5A MUNR0 BE ACC-W/0-GA 2/09/84 ME 3.0 i QCP C7 BECK 0RT F0

' S1024 r0NTAINMENT -2 ANNULUS 10033-C2-13-249 2/01/84 QCP 3 KOHLER BE WELD 2/01/84 W E QCP 5A MUNR0 BE WLDR QF 2/02/84 ME 14.0 QCP E7 BECK 0RT F0 NCR 2/02/94 ME QCP 5 AMARILLAS FO 5422-455 CITATION 2/10/84

< S1025 CONTAIMENT - 2 A MULUS 10043-C2-13-423 2/07/84 QCP 3 KOHLER BE FHYSICAL 2/07/84 M E QCP 5A MUNR0 BE NCR 2/08/84 ME 3.0 Rf~ M Mfll-A-JR-92 WE .

I l ME

p ,

d. >

Page 2 of 2 ATTACHMENT 1

(- .

b QCP C7 BECK 0RT F0 5422-462 2/09/84

$1027 CONTA! WENT . 2 ANNULUS 10042-C2-13-450 2/07/84 GCP 3 MUNR0 P6 RECORDS 2/10/84 RMB 3.0 QCP 5A MCCLASKEY F0 PHYSICAL 2/10/84 RMB QCP C7 BURD0!N NR NCR 2/10/84 MWE 4.0 J 5422-467 2/10/84 CITATION 2/13/84

!E S1028 CONT'A! MENT 2 MNULUS 10054-C2-13-497 2/07/84 QCP 3 MUNR0 P6 RECORDS 2/10/84 RMB 2.0 QCP 5A MCCLASKEY F0 QCP C7 S1029 CONTAINENT 2 MNU'.US 10043-C2-13-428 2/07/84 QCP 3 MUNRO P6 RECORDS 2/08/84 RMB 2.0 GCP 5A MCCLASKEY F0 QCP C7 S1030 CONTA! MENT 2 MNULUS 10054-C2-13-496 2/07/84 QCP 3 MUNR0 P6 RECORDS 2/07/84 RMB 2.0 QCP SA MCCLASKEY F0

,- QCP C7

- S1031 CONTAI MENT 2 AMULUS 10049-C2-13-502 2/07/84 QCP 3 MUNR0 P6 RECORD 5 2/10/84 RMB 4.0 QCP 5A MCCLASKEY F0 PHYSICAL 2/10/84 RMB QCP C7 NCR 2/10/84 RMB S1032 CONTAI MENT' 2 AMULUS' 10059-C2-13-611 2/08/84 QCP 3 MUNR0 P6 RECORDS 2/08/84 RMB 2.0 QCP 5A MCCLASKEY F0

. - QCP C7

. S1033 CONTAIMENT 2 AMULUS 10043-C2-13-424 2/08/84 QCP 3 MUNR0 P6 RECORDS 2M6/84 RMB 3.0 QCP 5A MCCLASKEY F0 PHYSICAL 2/16!84 RMB QCP C7 -

NCR 2/16/84 RMB S1034 CONTAIMENT' 2 AMULUS 10070-C2-13-681 2/08/84 ' QCP 3 MUNR0 P6 REC 3RDS 2/08/84 RME 2.0 2/08/84 KMB

-n QCP 5A MCCLASKEY F0 PHYSICAL QCP C7 NCR 2/03/84 RMB 51035 CONTAI MENT 2 ANkULUS 10004-C2-13-704 2/08/84 QCP 3 MUNRO P6 RECORDS 2/08/84 RMB 2.0 QCP 5A MCCLASKEY F0 PHYSICAL 2/08/84 kMB QCP C7 NCR 2/08/84 RM S1036 CONTA! MENT 2 PLATFORMS 10034-C2-13-287 2/08/04 QCP 3 MUNR0 P6 RECORDS 2/08/84 RnB 2.0 QCP 5A MCCLASKEY F0 QCP C7 S1037 CONTAIMENT 2 PLATFORMS 10034-C2-13-289 2/08/84 QCP 3 MUNR0 P6 RECORDS 2/08/84RMB 2.0 QCP SA MCCLASKEY F0 GCP C7

' S1038 CONTAIMENT . 2 PLATFORMS 10034-C2-13-301 2/08/84 QCP 3 MUNR0 P6 RECCRDS 2/08/84 RMB 2.0

s- QCP 5A MCCLASKEY F0

. QCP C7

' S1039 CONTAIMENT 2 PLATFORMS 10034-C2-13-309 2/08/84' QCP 3 MUNR0 P6 RECORDS 2/08/84 RMB 2.0 QCP 5A MCCLASKEY F0 QCP C7 D

2 k

_ * :e 4

F

.. ATTACHMENT 2

.K

-/ ,

, UNIT #1 PROJECT FINANCIAL STATUS (THROUGH 29 FEBRUARY 1984)*

i A.1 . STATUS (Dollars in thousands)-

~

. Total Projected Funds Obligated Balance of Funds Due Project Cost To Date FY 1983

- $345.0K $345.0K - 0_-

. B .' ANALYSIS Period Cumulative

. : Direct Laboratory Staff Effort (FTE). 0.4 1.2 DirectiSalaries - $ 0.3 $ 36.0 jy  ! Material and: Services (Excluding ADP) $ -

' f .e ADP' Support- $ -

E_ f,} - ISubcontracts (EG8G,TI nc.). $ 1.6 $ 82.7 iTravel' Expenses- -

$ 1.0 $ 16.7 cIddirect Labor Costs- , $ 0.4 $ 34.8

-Other;(TID); $ .0 $ 0.2 w ' General and Administrative; -$ 2.9 $ 26.8

~

? TOTAL $ 3.0 $197.2 p ,

g liens: -- ,. $ 11.4

?}

1 Total. Including Liens

$208.6 e.0..

D - g (PercentLof Available Funding) 60%

1

.-?c, - .

^

s J

  • NOTE: Figures-may differ slightly from final billing.

f' k

.J

'f :

g

_ ..g:

i[ 71. ,

(

[ ATTACHMENT 3 c  :

UNIT #2 PROJECT FINANCIAL STATUS (THROUGH 29 FEBRUARY 1984)*

A.-.

STATUS ;(Dollars in thouywds)

Total Projected - Funds Obligated Balance of FLnds Due Project Cost- _

To Date FY 1983

.$125.0K $125.0K - 0_-

.B. . ANALYSIS t s-p Period Cumulative r

Direct Laboratory Staff Effort (FTE). 1.0 1.6 Direct' Salaries $ 6.9 $ 6.9

- -Material and Services (Excluding ADP) $ -

ADP Support $ -

Subcontracts-(EG8G,-Inc.) $ 0 $ 0 Travel Expenses - $ 1.6 $ 1.6 Indirect Labor Costs ,

$ 6.5 $ 6.5

-Other(TID)l $ 0 $ 0

. General and ' Administrative $ 0 $ 0

' 7TAL $15.0 $ 15.0 r

Liens- $ 20.0

Total ~ Including Liens $ 35.0

, (Percent of Available Funding) 28%

  • NOTE:- ' Figures may differ slightly from' final billing.