Category:CONTRACTED REPORT - RTA
MONTHYEARML20195K1351988-01-27027 January 1988 Technical Evaluation Rept of Dcrdr Pacific Gas & Electric Co,Diablo Canyon Power Plant Units 1 & 2 ML20195G5511987-09-30030 September 1987 Demonstration of Containment Vacuum/Overpressure Relief Valve Operability for Diablo Canyon Power Plant Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20205A3001985-02-11011 February 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Jan 1985 ML20205A2861985-01-14014 January 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Dec 1984 ML20205A2511984-12-12012 December 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Nov 1984 ML20112A7081984-11-14014 November 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Oct 1984 ML20112A6971984-10-10010 October 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Sept 1984 ML20112A6931984-09-19019 September 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Aug 1984 ML20098E8541984-08-0909 August 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for Jul 1984 ML20098E8511984-07-19019 July 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for June 1984 ML20098E8491984-06-13013 June 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for May 1984 ML20094D7771984-05-14014 May 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984 ML20091G0931984-04-30030 April 1984 Digman:A Computer Program to Illustrate the Complexities in Sampling Commercial LOW-LEVEL Waste Sites for Radionuclide Spills or Migration ML20094D7661984-04-11011 April 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Mar 1984 ML20094D7611984-03-14014 March 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984 ML20080F2001983-12-31031 December 1983 Equipment Qualification Insp Program - Annual Rept ML20210E6201983-11-22022 November 1983 Rev 0 to Project Quality Plan for Providing Assistance & Svcs to Support Nrc/Ie Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2. Supporting Documentation Encl ML20081C8211983-08-31031 August 1983 Insp Repts, Aug 1983 ML20081C7821983-07-31031 July 1983 Insp Repts, Jul 1983 ML20209C1501983-05-17017 May 1983 Summarizes Results of Plant Annulus Structure Horizontal Response to Hosgri Seismic Input Analysis Discussed W/Nrc in Mar 1983.Drawing List,Drawings & Envelope Spectra for Each of Four Floors Encl ML20072R6351983-03-11011 March 1983 Independent Design Verification Program Semimonthly Rept,830311 ML20071C6681982-11-30030 November 1982 Draft Identification & Ranking of Nuclear Plant Structures,Sys & Components & Graded QA Guidelines ML20070Q6801982-10-0808 October 1982 Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ ML20070Q6881982-10-0808 October 1982 Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ ML20065A6251982-08-31031 August 1982 Independent Seismic Evaluation of the Diablo Canyon Unit 1 Containment Annulus Structure and Selected Piping Systems ML20062K0861982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20039H1351981-11-30030 November 1981 Audit of PG&E Documentation Concerning Environ Qualification of Safety-Related Electrical Equipment Per NUREG-0588 for Diablo Canyon Nuclear Plants, Technical Evaluation Rept ML20203H3351981-10-22022 October 1981 Audit & Review Summary 811014-16. Supporting Documentation Encl ML20009F0611981-07-31031 July 1981 Diablo Canyon Nuclear Power Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation ML20117M9861977-06-30030 June 1977 Draft Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant 1988-01-27
[Table view] Category:QUICK LOOK
MONTHYEARML20195K1351988-01-27027 January 1988 Technical Evaluation Rept of Dcrdr Pacific Gas & Electric Co,Diablo Canyon Power Plant Units 1 & 2 ML20195G5511987-09-30030 September 1987 Demonstration of Containment Vacuum/Overpressure Relief Valve Operability for Diablo Canyon Power Plant Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20205A3001985-02-11011 February 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Jan 1985 ML20205A2861985-01-14014 January 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Dec 1984 ML20205A2511984-12-12012 December 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Nov 1984 ML20112A7081984-11-14014 November 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Oct 1984 ML20112A6971984-10-10010 October 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Sept 1984 ML20112A6931984-09-19019 September 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Aug 1984 ML20098E8541984-08-0909 August 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for Jul 1984 ML20098E8511984-07-19019 July 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for June 1984 ML20098E8491984-06-13013 June 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for May 1984 ML20094D7771984-05-14014 May 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984 ML20091G0931984-04-30030 April 1984 Digman:A Computer Program to Illustrate the Complexities in Sampling Commercial LOW-LEVEL Waste Sites for Radionuclide Spills or Migration ML20094D7661984-04-11011 April 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Mar 1984 ML20094D7611984-03-14014 March 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984 ML20080F2001983-12-31031 December 1983 Equipment Qualification Insp Program - Annual Rept ML20210E6201983-11-22022 November 1983 Rev 0 to Project Quality Plan for Providing Assistance & Svcs to Support Nrc/Ie Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2. Supporting Documentation Encl ML20081C8211983-08-31031 August 1983 Insp Repts, Aug 1983 ML20081C7821983-07-31031 July 1983 Insp Repts, Jul 1983 ML20209C1501983-05-17017 May 1983 Summarizes Results of Plant Annulus Structure Horizontal Response to Hosgri Seismic Input Analysis Discussed W/Nrc in Mar 1983.Drawing List,Drawings & Envelope Spectra for Each of Four Floors Encl ML20072R6351983-03-11011 March 1983 Independent Design Verification Program Semimonthly Rept,830311 ML20071C6681982-11-30030 November 1982 Draft Identification & Ranking of Nuclear Plant Structures,Sys & Components & Graded QA Guidelines ML20070Q6801982-10-0808 October 1982 Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ ML20070Q6881982-10-0808 October 1982 Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ ML20065A6251982-08-31031 August 1982 Independent Seismic Evaluation of the Diablo Canyon Unit 1 Containment Annulus Structure and Selected Piping Systems ML20062K0861982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20039H1351981-11-30030 November 1981 Audit of PG&E Documentation Concerning Environ Qualification of Safety-Related Electrical Equipment Per NUREG-0588 for Diablo Canyon Nuclear Plants, Technical Evaluation Rept ML20203H3351981-10-22022 October 1981 Audit & Review Summary 811014-16. Supporting Documentation Encl ML20009F0611981-07-31031 July 1981 Diablo Canyon Nuclear Power Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation ML20117M9861977-06-30030 June 1977 Draft Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant 1988-01-27
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20195K1351988-01-27027 January 1988 Technical Evaluation Rept of Dcrdr Pacific Gas & Electric Co,Diablo Canyon Power Plant Units 1 & 2 ML20195G5511987-09-30030 September 1987 Demonstration of Containment Vacuum/Overpressure Relief Valve Operability for Diablo Canyon Power Plant Units 1 & 2, Technical Evaluation Rept ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20205A3001985-02-11011 February 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Jan 1985 ML20205A2861985-01-14014 January 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Dec 1984 ML20205A2511984-12-12012 December 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Nov 1984 ML20112A7081984-11-14014 November 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Oct 1984 ML20112A6971984-10-10010 October 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Sept 1984 ML20112A6931984-09-19019 September 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Aug 1984 ML20098E8541984-08-0909 August 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for Jul 1984 ML20098E8511984-07-19019 July 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for June 1984 ML20098E8491984-06-13013 June 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for May 1984 ML20094D7771984-05-14014 May 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984 ML20091G0931984-04-30030 April 1984 Digman:A Computer Program to Illustrate the Complexities in Sampling Commercial LOW-LEVEL Waste Sites for Radionuclide Spills or Migration ML20094D7661984-04-11011 April 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Mar 1984 ML20094D7611984-03-14014 March 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984 ML20080F2001983-12-31031 December 1983 Equipment Qualification Insp Program - Annual Rept ML20210E6201983-11-22022 November 1983 Rev 0 to Project Quality Plan for Providing Assistance & Svcs to Support Nrc/Ie Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2. Supporting Documentation Encl ML20081C8211983-08-31031 August 1983 Insp Repts, Aug 1983 ML20081C7821983-07-31031 July 1983 Insp Repts, Jul 1983 ML20209C1501983-05-17017 May 1983 Summarizes Results of Plant Annulus Structure Horizontal Response to Hosgri Seismic Input Analysis Discussed W/Nrc in Mar 1983.Drawing List,Drawings & Envelope Spectra for Each of Four Floors Encl ML20072R6351983-03-11011 March 1983 Independent Design Verification Program Semimonthly Rept,830311 ML20071C6681982-11-30030 November 1982 Draft Identification & Ranking of Nuclear Plant Structures,Sys & Components & Graded QA Guidelines ML20070Q6801982-10-0808 October 1982 Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ ML20070Q6881982-10-0808 October 1982 Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ ML20065A6251982-08-31031 August 1982 Independent Seismic Evaluation of the Diablo Canyon Unit 1 Containment Annulus Structure and Selected Piping Systems ML20062K0861982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20039H1351981-11-30030 November 1981 Audit of PG&E Documentation Concerning Environ Qualification of Safety-Related Electrical Equipment Per NUREG-0588 for Diablo Canyon Nuclear Plants, Technical Evaluation Rept ML20203H3351981-10-22022 October 1981 Audit & Review Summary 811014-16. Supporting Documentation Encl ML20009F0611981-07-31031 July 1981 Diablo Canyon Nuclear Power Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation ML20117M9861977-06-30030 June 1977 Draft Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant 1988-01-27
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20154B1301988-08-29029 August 1988 Notification of Contract Execution,Mod 8,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada-Reno,Mackay School of Mines ML20195K1351988-01-27027 January 1988 Technical Evaluation Rept of Dcrdr Pacific Gas & Electric Co,Diablo Canyon Power Plant Units 1 & 2 ML20236T2601987-11-19019 November 1987 Notification of Contract Execution Mod 5,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada - Reno ML20236T2731987-11-19019 November 1987 Mod 5,revising Paragraph C.3, Meeting & Travel as Stated, to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML20195G5511987-09-30030 September 1987 Demonstration of Containment Vacuum/Overpressure Relief Valve Operability for Diablo Canyon Power Plant Units 1 & 2, Technical Evaluation Rept ML20235M9311987-09-29029 September 1987 Notification of Contract Execution,Mod 6,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada,Reno ML20206J1191987-04-0808 April 1987 Notification of Contract Execution,Mod 4,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada - Reno,Mackay School of Mines ML20206J1371987-04-0808 April 1987 Mod 4,recognizing Administrative Changes Due to NRC Reorganization & Changing Billing Address,To Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML20207B7811986-12-17017 December 1986 Notification of Contract Execution,Mod 3,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada-Reno ML20207B8081986-12-17017 December 1986 Mod 3,providing Incremental Funding,To Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML17334B0331986-11-30030 November 1986 Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. ML20197B6501986-10-20020 October 1986 Notification of Contract Execution,Mod 2,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada-Reno,MacKay School of Mines ML20197B6601986-10-20020 October 1986 Mod 2,providing Incremental Funding,To Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML20203N2241986-04-24024 April 1986 Notification of Contract Execution,Mod 1,to Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant. Contractor:Univ of Nevada-Reno ML20203N2331986-04-24024 April 1986 Mod 1,providing Funding Action,Changing B&R Number & Changing Project Officer,To Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant ML20129H2041985-07-0808 July 1985 Notification of Contract Execution, Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant, Awarded to Univ of Nevada ML20129H2351985-07-0808 July 1985 Contract: Earthquake Potential & Max Credible Earthquake for Diablo Canyon Power Plant, Awarded to Univ of Nevada ML20205A3001985-02-11011 February 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Jan 1985 ML20205A2861985-01-14014 January 1985 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Dec 1984 ML20205A2511984-12-12012 December 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Nov 1984 ML20112A7081984-11-14014 November 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Oct 1984 ML20112A6971984-10-10010 October 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Sept 1984 ML20112A6931984-09-19019 September 1984 Technical Assistance for Insp of Reactors Under Const, Progress Rept for Aug 1984 ML20098E8541984-08-0909 August 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for Jul 1984 ML20098E8511984-07-19019 July 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for June 1984 ML20098E8491984-06-13013 June 1984 Technical Assistance for Insp of Diablo Canyon Design Verification Program, Progress Rept for May 1984 ML20094D7771984-05-14014 May 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Apr 1984 ML20091G0931984-04-30030 April 1984 Digman:A Computer Program to Illustrate the Complexities in Sampling Commercial LOW-LEVEL Waste Sites for Radionuclide Spills or Migration ML20094D7661984-04-11011 April 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Mar 1984 ML20094D7611984-03-14014 March 1984 Technical Assistance for Insp of Diablo Canyon Idvp, Progress Rept for Feb 1984 ML20080F2001983-12-31031 December 1983 Equipment Qualification Insp Program - Annual Rept ML20210E6201983-11-22022 November 1983 Rev 0 to Project Quality Plan for Providing Assistance & Svcs to Support Nrc/Ie Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2. Supporting Documentation Encl ML20081C8211983-08-31031 August 1983 Insp Repts, Aug 1983 ML20081C7821983-07-31031 July 1983 Insp Repts, Jul 1983 ML20209C1501983-05-17017 May 1983 Summarizes Results of Plant Annulus Structure Horizontal Response to Hosgri Seismic Input Analysis Discussed W/Nrc in Mar 1983.Drawing List,Drawings & Envelope Spectra for Each of Four Floors Encl ML20072R6351983-03-11011 March 1983 Independent Design Verification Program Semimonthly Rept,830311 ML20071C6681982-11-30030 November 1982 Draft Identification & Ranking of Nuclear Plant Structures,Sys & Components & Graded QA Guidelines ML20070Q6801982-10-0808 October 1982 Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ ML20070Q6881982-10-0808 October 1982 Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ ML20065A6251982-08-31031 August 1982 Independent Seismic Evaluation of the Diablo Canyon Unit 1 Containment Annulus Structure and Selected Piping Systems ML20062K0861982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20039H1351981-11-30030 November 1981 Audit of PG&E Documentation Concerning Environ Qualification of Safety-Related Electrical Equipment Per NUREG-0588 for Diablo Canyon Nuclear Plants, Technical Evaluation Rept ML20203H3351981-10-22022 October 1981 Audit & Review Summary 811014-16. Supporting Documentation Encl ML20009F0611981-07-31031 July 1981 Diablo Canyon Nuclear Power Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation ML20117M9861977-06-30030 June 1977 Draft Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant 1988-08-29
[Table view] |
Text
-
7.. - .- - - . . -
Lawrence Livermore National Laboratory A
March 14, 1984 WOW: 84-12 Mr. Phillip J. Morrill, Project Manager.
U. S. Nuclear Regulatory Agency, Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 PROGRESS REPORT, FEBRUARY 1984 TECHNICAL ASSISTANCE FOR INSPECTION OF DIABLO CANYON DESIGN VERIFICATION PROGRAM, FIN B8552 (UNIT 1) AND FIN A0753 (UNIT 2).
i
- 1. Project Description As a consequence of an Independent Design Verification Program, many modifications and additions to the piping and electr cal raceway support systems and building structural steel are being implemented at the Diablo Canyon Nuclear Power Plant. The LLNL is assisting the NRC Region V office in assessing the adequacy of this work.
- 2. Progress - February 1984 Inspection work for this report period was focused on the spray hangers
- in Unit 2 containment while the scaffolding in this area remains in place. Some structural connections in the containment annulus area were also inspected and citations have been issued by the regional inspectors for two discrepancies found there. One NCR described excessive undercut over an 8" length of a 25"x5/16" fillet weld. The other NCR was for missing washers and torque seal for a high strength bolted connection. All items inspected and the results for both units are listed in Attachment 1.
- 3. Funding
- A ' detailed report- of expenditures for this period is provided in Attachments 2 & 3. A new proposal for Unit 2 work is in preparation.
- 4. Personnel, Subcontracts, and Consultants This work is being conducted with assistance from the Energy Measure-ments Group of EG&G, San Ramon Operations.
8400080515 840727 PDR ADOCK 05000275 G PDR An EOAaf Choortwwy Enydopr +77G2/of CaMyrne a RO Bar aos /lerimn N6c5so . rovastAm&&JUrdrdtnJ7merdLFWnaeECw- ow------ -----
f :;
Mr. Phil Morrill March 14, 1984
-Page 2 5.. Meetings / Travel L
None-
- 6. Concerns t
.None
- 7. Plans Inspection work is to continue in Unit 2 containment.
~
-WALLACE 0. WADE PROJECT MANAGER EGAG MECHANICAL ENGINEERING DEPARTMENT Approved:
I i
~ GARTH 'E. . CumlNGS DEPUTY PROGRAM LEADER NUCLEAR' SYSTEM SAFETY PROGRAM WOW: cog
. Attachment Distribution:
LLNL- NRC EG8G/SRO Gumings R. Gilbert , A. Debeling J. Johnson D. Ki rstA ~ R. Pong R. Langland H. Canter C. Morton M. Eli T. Bishop R.-Bogdanowicz E. Frigillana C.- Meier
Page 1 of 2 l .
ATTACHMENT 1 0
N
' LOG - 1 PART START COMPLETE STATUS MAN NUM LOC i ITEM NUMBER DATE DATE CRIT CONTACTS AFF STATUS DATE INSP HRS E1083 TURBINE BLD6 i RACEWAY SUPPORT 44/D-140-6-77 1/19/84 2/28/84 QCP 3 MORRIS 0N PG PHYSifAL 1/19/84 RMB 1.0 QCP 5A BRUNKE F0 MR 2777 1/19/84 QCP 9 ACC-W/0-QA 2/28/84 RMB 1.0 QCP E9 M0056 CONTA! MENT 2 SPRAY HANGER 20-93R 7/12/83 2/09/04 ESD 223 THOMAS P6 PHYSICAL 9/02/83 M E 3.0 M0YER BE DR-5105 9/02/83 NRNIS BE ACCEPTED 2/09/84 M E 5.0 2/09/84 RMB 1.0 M0081 C041TAINMENT 2 SPRAY HANSER 20-94R 7/19/83 2/09/84 ESD 223 THOMAS P6 CITAT!DN 8/20/93 ME 5.0 M0YER BE DR-5090 8/20/83 HERNANDEZ NR ACCEPTED 2/09/94 ME 4.0 2/09/84 RMB 1.0 M0091 CONTA!NMENT 2 SPRAY HANGER 20-95R 7/22/83 2/09/84 ESD 223 THOMAS PG ACCEPTED 2/09/84 ME 7.0 M0YER BE 2/09/84 RMB 1.0 M1015 AUI BLD6 - 1 PIPE HAN6ER 73-63R 12/15/03 2/28/84 ESD 223 NASADOWSKI P6 RECORDS 12/15/83 RMB 2.0 PHYSICAL 12/15/83 RMB 1.0 ACC-W/0-QA M1016 AUI BLD6 1 PIPE HANGER 230-1R 1/05/84 2/29/84 ESD 223 NASADOWSKI PG RECORDS 1/05/84 RMB 2.0 PHYSICAL 1/05/84 RMB 1.0 ACC-W/0-QA
.M1017 AUI BLD6 1 PIPE HAM 6ER 322-4R 1/05/84 2/29/84 ESD 223 NASADOWSKI P6 RECORDS 1/05/84 RMB 2.0 PHYSICAL 1/05/84 RMB 1.0 ACC-W/0-QA M1019 CONTAINMENT '2 SPRAY HAN6ER 20-41R 1/31/84 2!02/84 ESD 223 MICHAELS P6 ACCEPTED 2/02/84 ME 7.0 M1020 CONTAIMENT 2 SPRAY HANGER 414-32R 1/31/84 2/07/84 ESD 223 MICHAELS PS PHYSICAL 2/03/84 ME 8.0 ACCEPTED 2/08/84 M E 3.0
- M1021 CONTA!NMENT 2 SPRAY HAN6ER 20-35R 2/06/84 2/08/84 ESD 223 C CHAELS P6 ACCEPTFD 1/26/84 RP 3.0
, 022 CONTA! MENT 2 SPRAY HANGER 20-42R 2/06/84 2/08/84 ESD 223 MICHAELS P6 ACCEPTED 1/26/84 RP 2.0
.'M1023 CONTA!NMENT - 2 SPRAY HAN6ER 414-133R 2/06/84 2/08/84 ESD 223 MICHAELS P6 ACCEPTED 1/26/84 RP 2.0 MI 4 CONTAINMENT 2 SPRAY HAN6ER 20-2R 2/06/84 2/08/84 ESD 223 MICHAELS PS ACCEPTED 2/08/84 ME 3.0
--M1025 COWTAINMENT ~2 SPRAY HAN6ER 20-3R 2/06/84 2/08/84 ESD 223 MICHAELS PS ACCEPTED 2/08/84 ME 3.0 m ~ M1026 CONTAIMENT '
2 SPRAY HANSFR '20-4R 2/06/84 2/08/84 ESD 223 MICHAELS PS ACCEPTED 2/08/84 ME 3.0 2/08/84 M E 3.0 027 C3NTA! MENT' - 2 SPRAY HAN6ER 20-43R 2/06/84 2/08/84 ESD 223 MICHAELS P6 ACCEPTED 028 CONTAIMENT 2 SPRAY HAN6ER 20-44R 2/06/84 2/08/84 ESD 223 MICHAELS PS ACCEPTED 2/08/84 M E 3.0
~M1029 CONTA! MENT 2 SPRAY HANGER 414-83R 2/09/84 ESD 223 MICHAELS P6 ORIENT *N 2/09/84 ME 3.0 M1033 CONTA! WENT 2 SPRAY HAN6ER 20-50R 2/15/84 2/16/84 ESD 223 BERNASCONI PS ACCEPTED 2/16/84 RP 2.0
. M1034 CGNTAIMENT 2 SPRAY HAN6ER 20-52R 2/15/64 2/16/84 ESD 223 BERNASCONI P6 ACCEPTED 2/16/84 RP 2.0 m035 CONTAl WENT 2 SPRAY HAN6ER 414-83R 2/15/84 2/16/84 ESD 223 BERNASCONI F6 REC 0FDS 2/16/84 RMB 8,0 MICHAELS P6 ACC-W/0-GA 2/29/84 RMB !.0 i
M1036 CONTAIMENT 2 SPRAY HANGER 20-91R 2/15/84 2/79/84 ESD 223 BERNASCONI P6 RECORDS 2/16/84 RMB 8.0 MICHAELS PS PHYSICAL 2/16/84 RMB 1.0 DR 8115 2/16/84 DP-2-786-M 2/29/84 ACCEPTED 2/29/84 M1037 CONTAINMENT 2 SPRAY HANGER 20-58R 2/15/84 2/29/94 ESD 223 BERNASCONI P6 RECORDS 2/16/84 RMB B.0 ACC-W/0-QA 2/29/84 RMB 1.0 ir
~
'M1038 CONTA! MENT
' 2 SPRAY HAN6ER 20-96R 2/22/84 ESD 223 BERNASCON! P6 WELD 2/22/84 ME 15.0 MICHAELS P6 2/22/84 M E T039 C0hfA! MENT 2 SPRAY HANGER 414-46R 2/22/84 2/24/84 ESD 223 BERNASCONI P6 ACCEPTED 2/24/84 ME 3.0 MICHAELS P6 M1040 CONTA!NMENT 2 SPRAY HAN6ER 20-33R 2/23/84 ESD 223 MICHAELS P6 DR 2/23/84 ME 3.0
- M1041 TONTAI MENT 2 SPRAY HANGER 20-75R 2/2?/84 3/02/84 ESO 223 BERNASCONI P6 ACCEPTED 3/02/84 RMB 5.0
-51020 CONTAIMENT -2 ANNULUS 10003-C2-13-069 2/01/84 2/09/84 QCP 3 KOHLER BE RECORDS 2/03/84 M E 5.0 QCP 5A MUNR0 BE QCP C7 BECK 0RT F0
- S1021 CONTAIMENT ' 2 ANNULUS 10033-C2-13-242 2/01/84 2/09/84 QCP 3 K0HLER BE RECORDS 2/03/84 ME 5.0 QCP 5A MUNR0 BE ACC-W/0-QA 2/09/84 M E 3.0 QCP C7 PECK 0RT F0 S1022 CONTAI MENT: 2 AMULUS 10003-C2-13-071 2/01/84 2/09/84 QCP 3 KOHLER BE RECORDS 2/03/84 ME 5.0 QCP 5A MUNR0 6E ACC-W/0-QA 2/09/84 M E 3.0 QCP C7 BECK 0RT F0 S1023 CONTAINMENT 2 ANNULUS '10003-C2-13-080 2/01/84 2/09/84 QCP 3 K0HLER BE RECORDS 2/03/84 ME 5.0 QCP 5A MUNR0 BE ACC-W/0-GA 2/09/84 ME 3.0 i QCP C7 BECK 0RT F0
' S1024 r0NTAINMENT -2 ANNULUS 10033-C2-13-249 2/01/84 QCP 3 KOHLER BE WELD 2/01/84 W E QCP 5A MUNR0 BE WLDR QF 2/02/84 ME 14.0 QCP E7 BECK 0RT F0 NCR 2/02/94 ME QCP 5 AMARILLAS FO 5422-455 CITATION 2/10/84
< S1025 CONTAIMENT - 2 A MULUS 10043-C2-13-423 2/07/84 QCP 3 KOHLER BE FHYSICAL 2/07/84 M E QCP 5A MUNR0 BE NCR 2/08/84 ME 3.0 Rf~ M Mfll-A-JR-92 WE .
I l ME
p ,
- d. >
Page 2 of 2 ATTACHMENT 1
(- .
b QCP C7 BECK 0RT F0 5422-462 2/09/84
$1027 CONTA! WENT . 2 ANNULUS 10042-C2-13-450 2/07/84 GCP 3 MUNR0 P6 RECORDS 2/10/84 RMB 3.0 QCP 5A MCCLASKEY F0 PHYSICAL 2/10/84 RMB QCP C7 BURD0!N NR NCR 2/10/84 MWE 4.0 J 5422-467 2/10/84 CITATION 2/13/84
!E S1028 CONT'A! MENT 2 MNULUS 10054-C2-13-497 2/07/84 QCP 3 MUNR0 P6 RECORDS 2/10/84 RMB 2.0 QCP 5A MCCLASKEY F0 QCP C7 S1029 CONTAINENT 2 MNU'.US 10043-C2-13-428 2/07/84 QCP 3 MUNRO P6 RECORDS 2/08/84 RMB 2.0 GCP 5A MCCLASKEY F0 QCP C7 S1030 CONTA! MENT 2 MNULUS 10054-C2-13-496 2/07/84 QCP 3 MUNR0 P6 RECORDS 2/07/84 RMB 2.0 QCP SA MCCLASKEY F0
,- QCP C7
- S1031 CONTAI MENT 2 AMULUS 10049-C2-13-502 2/07/84 QCP 3 MUNR0 P6 RECORD 5 2/10/84 RMB 4.0 QCP 5A MCCLASKEY F0 PHYSICAL 2/10/84 RMB QCP C7 NCR 2/10/84 RMB S1032 CONTAI MENT' 2 AMULUS' 10059-C2-13-611 2/08/84 QCP 3 MUNR0 P6 RECORDS 2/08/84 RMB 2.0 QCP 5A MCCLASKEY F0
. - QCP C7
. S1033 CONTAIMENT 2 AMULUS 10043-C2-13-424 2/08/84 QCP 3 MUNR0 P6 RECORDS 2M6/84 RMB 3.0 QCP 5A MCCLASKEY F0 PHYSICAL 2/16!84 RMB QCP C7 -
NCR 2/16/84 RMB S1034 CONTAIMENT' 2 AMULUS 10070-C2-13-681 2/08/84 ' QCP 3 MUNR0 P6 REC 3RDS 2/08/84 RME 2.0 2/08/84 KMB
-n QCP 5A MCCLASKEY F0 PHYSICAL QCP C7 NCR 2/03/84 RMB 51035 CONTAI MENT 2 ANkULUS 10004-C2-13-704 2/08/84 QCP 3 MUNRO P6 RECORDS 2/08/84 RMB 2.0 QCP 5A MCCLASKEY F0 PHYSICAL 2/08/84 kMB QCP C7 NCR 2/08/84 RM S1036 CONTA! MENT 2 PLATFORMS 10034-C2-13-287 2/08/04 QCP 3 MUNR0 P6 RECORDS 2/08/84 RnB 2.0 QCP 5A MCCLASKEY F0 QCP C7 S1037 CONTAIMENT 2 PLATFORMS 10034-C2-13-289 2/08/84 QCP 3 MUNR0 P6 RECORDS 2/08/84RMB 2.0 QCP SA MCCLASKEY F0 GCP C7
' S1038 CONTAIMENT . 2 PLATFORMS 10034-C2-13-301 2/08/84 QCP 3 MUNR0 P6 RECCRDS 2/08/84 RMB 2.0
- s- QCP 5A MCCLASKEY F0
. QCP C7
' S1039 CONTAIMENT 2 PLATFORMS 10034-C2-13-309 2/08/84' QCP 3 MUNR0 P6 RECORDS 2/08/84 RMB 2.0 QCP 5A MCCLASKEY F0 QCP C7 D
2 k
_ * :e 4
F
.. ATTACHMENT 2
.K
-/ ,
, UNIT #1 PROJECT FINANCIAL STATUS (THROUGH 29 FEBRUARY 1984)*
i A.1 . STATUS (Dollars in thousands)-
~
. Total Projected Funds Obligated Balance of Funds Due Project Cost To Date FY 1983
- $345.0K $345.0K - 0_-
. B .' ANALYSIS Period Cumulative
. : Direct Laboratory Staff Effort (FTE). 0.4 1.2 DirectiSalaries - $ 0.3 $ 36.0 jy ! Material and: Services (Excluding ADP) $ -
' f .e ADP' Support- $ -
E_ f,} - ISubcontracts (EG8G,TI nc.). $ 1.6 $ 82.7 iTravel' Expenses- -
$ 1.0 $ 16.7 cIddirect Labor Costs- , $ 0.4 $ 34.8
-Other;(TID); $ .0 $ 0.2 w ' General and Administrative; -$ 2.9 $ 26.8
~
? TOTAL $ 3.0 $197.2 p ,
g liens: -- ,. $ 11.4
?}
1 Total. Including Liens
$208.6 e.0..
- D - g (PercentLof Available Funding) 60%
1
.-?c, - .
^
s J
- NOTE: Figures-may differ slightly from final billing.
f' k
.J
'f :
g
_ ..g:
i[ 71. ,
(
[ ATTACHMENT 3 c :
UNIT #2 PROJECT FINANCIAL STATUS (THROUGH 29 FEBRUARY 1984)*
A.-.
STATUS ;(Dollars in thouywds)
- Total Projected - Funds Obligated Balance of FLnds Due Project Cost- _
To Date FY 1983
.$125.0K $125.0K - 0_-
.B. . ANALYSIS t s-p Period Cumulative r
Direct Laboratory Staff Effort (FTE). 1.0 1.6 Direct' Salaries $ 6.9 $ 6.9
- -Material and Services (Excluding ADP) $ -
ADP Support $ -
Subcontracts-(EG8G,-Inc.) $ 0 $ 0 Travel Expenses - $ 1.6 $ 1.6 Indirect Labor Costs ,
$ 6.5 $ 6.5
-Other(TID)l $ 0 $ 0
. General and ' Administrative $ 0 $ 0
' 7TAL $15.0 $ 15.0 r
Liens- $ 20.0
- Total ~ Including Liens $ 35.0
, (Percent of Available Funding) 28%
- NOTE:- ' Figures may differ slightly from' final billing.
"- - _-