Proposed Tech Spec Changes Re Source Range Neutron Flux Monitors During Shutdown ConditionsML20094B200 |
Person / Time |
---|
Site: |
Callaway ![Ameren icon.png](/w/images/0/06/Ameren_icon.png) |
---|
Issue date: |
08/01/1984 |
---|
From: |
UNION ELECTRIC CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20094B197 |
List: |
---|
References |
---|
NUDOCS 8408060287 |
Download: ML20094B200 (6) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211Q5411999-09-0808 September 1999 Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ML20195C5191999-05-28028 May 1999 Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a ML20207F4801999-05-27027 May 1999 Proposed Improved TSs & ITS Bases ML20206G3621999-04-30030 April 1999 Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 ML20205S9141999-04-21021 April 1999 Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS ML20205L0901999-04-0707 April 1999 Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS ML20207L1061999-03-0909 March 1999 Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 ML20196G1731998-11-25025 November 1998 Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs ML20196D0011998-11-23023 November 1998 Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 ML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ML20154S2371998-10-21021 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively ML20154F8311998-09-29029 September 1998 Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump ML20154A2901998-09-24024 September 1998 Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 ML20151U1031998-08-27027 August 1998 Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs ML20236Y1721998-08-0404 August 1998 Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 ML20236W3721998-07-30030 July 1998 Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ML20236J0821998-06-29029 June 1998 Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines ML20236E9651998-06-26026 June 1998 Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 ML20216F3791998-03-0909 March 1998 Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points ML20217P8161998-02-23023 February 1998 Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown ML20198T3521998-01-16016 January 1998 Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis ML20197D6461997-12-16016 December 1997 Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves ML20199B4261997-11-10010 November 1997 Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes ML20198P3361997-10-31031 October 1997 Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4141997-10-31031 October 1997 Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits1997-10-17017 October 1997 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML20217H8031997-08-0808 August 1997 Proposed Tech Specs 3/4.3 Re Instrumentation ML20198F3411997-08-0808 August 1997 Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip ML20198F3911997-08-0808 August 1997 Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 ML20210H2151997-08-0808 August 1997 Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown ML20198J7301997-05-15015 May 1997 Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant ML20154Q1191997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20138B7421997-04-24024 April 1997 Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer ML20137N6111997-04-0101 April 1997 Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ML20117K6431996-09-0505 September 1996 Proposed Tech Specs,Revising TS 3/4.4 Re RCS ML20115J0181996-07-18018 July 1996 Proposed Tech Specs 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20107H3931996-04-17017 April 1996 Proposed Tech Specs 3/4.3 Re Adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2 & Revising Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3251996-04-12012 April 1996 Proposed Tech Specs 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases,Addressing Installation of Laser Welded Tube Sleeves in Plant SGs ML20107F0791996-04-12012 April 1996 Proposed Tech Specs 3/4.4 Re Changing TS, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant SGs ML20101R4211996-04-0909 April 1996 Revised TS Pages That Adhere to Testing Methods of ASTM Std D2276-78,Method a for Diesel Fuel Oil Particulate Concentration ML20101J0381996-03-22022 March 1996 Proposed Tech Specs,Implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4351996-02-28028 February 1996 Proposed TS 3/4.8.1,ac Sources ML20106G4131996-02-23023 February 1996 Proposed Tech Specs Paragraph 1.A. Re Operating License Change to Reflect Union Electric as wholly-owned Subsidiary of Ameren Corp ML20097D5801996-02-0909 February 1996 Proposed Tech Specs Allowing Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6151996-02-0909 February 1996 Proposed Tech Specs & Bases Re Containment Systems ML20097D6341996-02-0909 February 1996 Proposed Tech Specs Re AFW Sys ML20097F8991996-02-0404 February 1996 Proposed Tech Specs 4.6.1.2.a Re Containment Sys ML20097C2791996-02-0202 February 1996 Proposed Tech Spec 3/4.6.3, Containment Isolation Valves ML20096B1891996-01-0202 January 1996 Proposed Tech Specs 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ML20094A1721995-10-23023 October 1995 Proposed Tech Specs,Relocating Audit Frequencies in Former TS 6.5.2.9 to Operational QA Manual 1999-09-08
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q5411999-09-0808 September 1999 Proposed Tech Specs Reflecting USQ Associated with Increases in Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ML20195C5191999-05-28028 May 1999 Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a ML20207F4801999-05-27027 May 1999 Proposed Improved TSs & ITS Bases ML20206G3621999-04-30030 April 1999 Proposed Conversion Tech Specs Section 1.0/ITS Section 1.0 ML20205S9141999-04-21021 April 1999 Proposed Tech Specs Sections 1.0,3.3,3.4,3.6,3.7 & 3.9, Converting to ITS ML20205L0901999-04-0707 April 1999 Proposed Tech Specs Section 3.3,3.4,3.5,3.6,3.7,3.8 & 4.0, Converting to ITS ML20207L1061999-03-0909 March 1999 Proposed Tech Specs Re Conversion to ITSs Sections 3.3,3.4, 3.6,3.7.3 8,3.9 & 5.0 ML20196G1731998-11-25025 November 1998 Proposed Tech Specs Section 3.3, Intstrumentation, Converting to Improved Tech Specs ML20196D0011998-11-23023 November 1998 Proposed Tech Specs Pages Re follow-up Items Related to 970515 Request for Amend to License NPF-30 ML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis ML20154S2371998-10-21021 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Controls,Respectively ML20154F8311998-09-29029 September 1998 Proposed Tech Specs Revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start turbine-driven Pump ML20154A2901998-09-24024 September 1998 Proposed Tech Specs Converting to Improved TS Re Section 3.4, RCS, Consistent w/NUREG-1431 ML20151U1031998-08-27027 August 1998 Proposed Tech Specs Sections 1.0,2.0 & 3.0,converting to Improved Tech Specs ML20236Y1721998-08-0404 August 1998 Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 ML20198D3201998-07-31031 July 1998 Rev 20 to Inservice Testing Program at Callaway Nuclear Plant ML20236W3721998-07-30030 July 1998 Proposed Tech Specs Revising Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ML20236J0821998-06-29029 June 1998 Proposed Tech Specs 3.7.1.7,4.7.1.7.1,4.7.1.7.2 & Bases 3/4.7.1.7 Revising to Address All Four Atmospheric Steam Dump Lines ML20236E9651998-06-26026 June 1998 Proposed Tech Specs Pages Re Conversion to Improved STS, Section 3.6 ML20216F3791998-03-0909 March 1998 Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points ML20195B5651998-03-0202 March 1998 Rev 22 to QC Procedure QCP-ZZ-03003, Matl Receipt Insp ML20217P8161998-02-23023 February 1998 Proposed Tech Specs Replacement Page B 3.8-34 Re AC Sources Shutdown ML20198T3521998-01-16016 January 1998 Proposed Tech Specs 3/4.3,revising Ms & Feedwater Isolation Sys Slave Relay Surveillance from Quarterly Actuation Logic Test to Monthly Actuation Logic Test on Staggered Test Basis ML20197D6461997-12-16016 December 1997 Proposed Tech Specs Table Revising Lift Setting Tolerance for Main Steam Line Safety Valves ML20199B4261997-11-10010 November 1997 Proposed Tech Specs Re Page 5 of 8 for FW Isolation Changes ML20198P3361997-10-31031 October 1997 Proposed Tech Specs Reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4141997-10-31031 October 1997 Proposed Tech Specs,Revising ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump, in Tables 3.3-3,3.3-4 & 4.3-2 ML20217B3261997-10-22022 October 1997 Procedure MPE-ZZ-QY128, Operational Test Sequence of 4.16KV Diesel Generator NE02 Air Circuit Breaker 152NB0211 ULNRC-03664, Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits1997-10-17017 October 1997 Proposed Tech Specs 3/4.4.9 Re Pressure/Temp Limits ML20217B3001997-09-14014 September 1997 Procedure ETP-NF-00001, MDAFW Pump (DPAL01A) Start Inhibit Circuit Test,Lsels Relay K1102 ML20217B3081997-09-0404 September 1997 Procedure ETP-BF-00002, Mdaew Pump (DPAL01B) Start Inhibit Circuit Test,Lsels Relay K4102 ML20217H8031997-08-0808 August 1997 Proposed Tech Specs 3/4.3 Re Instrumentation ML20210H2151997-08-0808 August 1997 Proposed TS Revising SRs 3/4.7.4, Essential Svc Water Sys by Removing Requirement to Perform SRs 4.7.4.b.1, 4.7.4.b.2 & 4.7.4.c During Shutdown ML20198F3911997-08-0808 August 1997 Proposed Tech Specs Changes,Revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 ML20198F3411997-08-0808 August 1997 Proposed Tech Specs,Revising Table 3-7.2 to Specify That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer pressure-high Trip ML20195B5261997-05-20020 May 1997 Rev 6 to EDP-ZZ-03000, Containment Building Coatings ML20154Q1191997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20198J7301997-05-15015 May 1997 Proposed Conversion to ITS Sections 1.0,3.1,3.2,3.3,3.4,3.7, 3.9 & 5.0 for Plant ML20138B7421997-04-24024 April 1997 Proposed Tech Specs 6.0 Revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer ML20141C3401997-04-14014 April 1997 Rev 18 to CNP IST Program ML20141D9331997-04-14014 April 1997 Rev 18 to Inservice Testing Program for Callaway Nuclear Plant ML20137N6111997-04-0101 April 1997 Proposed Tech Specs Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ML20195B5581997-03-11011 March 1997 Rev 12 to Matls Engineering Procedure WEP-ZZ-00015, Preparation of Procurement Documents ML20195B5491997-01-31031 January 1997 Rev 22 to Administrative Procedure APA-ZZ-00400, Procurement of Parts,Supplies,Matls & Svcs ML20135E7351996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt One H Replacement Matl ML20135E7431996-12-11011 December 1996 Test to Determine Ampacity Derating Factor for Electrical Conductors Installed in 600mm X 101mm X 3650mm Long Cable Tray Encapsulated by KM1 Darmatt Three H Replacement Matl ML20135E7391996-12-11011 December 1996 Tests to Determine Ampacity Derating Factors for Electrical Conductors Installed in 1 & 4 Diameter Rigid Steel Conduits Encapsulated by KM1 Darmatt Three H Replacement Matl ML20140G2331996-10-31031 October 1996 Rev 6 to Callaway Plant Offsite Dose Calculation Manual ML20217B2951996-10-0303 October 1996 Procedure ISP-SA-2413A, Diesel Generator & Sequencer Testing (Train a) ML20117K6431996-09-0505 September 1996 Proposed Tech Specs,Revising TS 3/4.4 Re RCS 1999-09-08
[Table view] |
Text
.
11g EC
>$ TABLE 3.3-1 ge5O ">
- Km 5 REACTOR TRIP SYSTEM INSTRUMENTATION 8*8 s*4 MINIMUM
$$ e TOTAL NO. CHANNFLS CHANNELS APPLICABLE
@@ g FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION -
140 Eg" " "
- 1. Manual Reactor Trip 2 1 2 1, 2 1 2 1 2 3*,4*,5* 10
- 2. Power Ratige, Neutoori ilux
- d. High Setpoint 4 2 3 1, 2 2#
- b. Low Setpoint 4 2 3 l###, 2 2#
- 3. Power Range Neutron Flux 4 2 3 1, 2 2#
High Positive Rate
- 4. Power Range, Neutron Flux, 4 2 3 1, 2 2#
High Negative Rate
{ 5. Intermediate Range, Neutron Flux 2 1 2 l###, 2 3
- 6. Source Range, Neutron Flux a Startup 2 1 2 2## 4
- b. Shutdown 2 2 3,4,5 1 5,12 l
- 7. Overtemperature al
- a. Four Loop Operation 4 2 3 1, 2 6#
- b. Three Loop Operation ** ^^ ** ** ** -
- 8. Overpower al
- a. Four Loop Operaticn 4 2 3 1, 2 6#
- b. Three Loop Operation ** ^^ ** ^^ **
Rp p -
- 9. Pressurizer Pressure-Low 4 2 3 7:d O 1 6# ggo
- 10. Pressurizer Pressure-liigh 4 2 3 1, 2 6#
$N e to l
l
'i
- . 1
c --
TA8LE 3.3-1 (Centinuid) Enclosure 1 ULNRC-889 ACTION STATEMENTS (Centinuid} g/1/g4 ACTION 4 - With the nuacer of OPERABLE channels' one less than the Minimum Channels OPERA 8LE requirement, suspend all operations involving positive reactivity changes. The boron dilution flux doubling signals from the source range instrumentation may be blocked
'during reactor startup.
ACTION 5 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the Reactor trip breakers, suspend all operations involving positive reactivity changes and verify Valves BG-V178 and BG-V601 are closed and secured in position within the next hour.
ACTION 6 - With the number of OPERABLE channels one less than the Total
. Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
- a. The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, ard
- b. The Minimum Channels OPERABLE requirement is met; however, the inop7 table channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.
ACTION 7 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required ANALOG CHANNEL OPERATIONAL TEST provided the inoperable channel is placed'in the-tri ped?
condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
ACTION 8 - With less than the Minimum Number of Channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine by observation of the associated permissive annunciator window (s) that the interloc4 is in its required state for the existing plant condition, or apply Specification 3.0.3.
ACTION 9 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1, provided the other channel is OPERABLE.
ACTION 10 - With the number of OPERABLE channels one less tha'n the Minimum Channels OPERABLE requirement, restore the inoperable channel
! to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the Reactor trip breakers within the next hour.
ACTION 11 - With the number of OPERABLE channels less than the Total Number i
of Channels, operation may continue provided the inoperable channels are placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Action 12 - With the number of OPERABLE channels two less than the Minimum Channels requirement, verify the Reactor trip breakers are open, suspend all operations involving positive reactivity changes, verify compliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and verify valves BG-V178 and BG-V601 are closed and secured in position within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
CALLAWAY - UNIT 1 3/4 3-6
-_?_
J Enclosure 2 ULNRC-889 8/1/84 SAFETY EVALUATION Callaway Plant, Unit.1 Technical Specification-Table 3.3-1
, This amendment request is for revision of Technical Specification Table 3.3-1 to include an action statement if two channels of the source range neutron flux monitors are not operable in Modes 3, 4 and 5 and allows the block of both channels of flux doublir.g in Mode 2 in order to
. perform a reactor startup.
Mode 2 Below P-6 p (Table 3.3-1, Item 6.2 requires 2 source range channels to be OPERABLE in
-Mode'2 below P-6.
A statement has been added to Action 4 to allow the block of both source range flux doubling channels in order to'do a normal reactor startup.
Block switches are provided on the main control board to perform this H function. - ' By ~ design, this action disables only the automatic switchover of the charging pump. suction.from the VCT to the RWST. The Reactor Trip and all alarms generated from the source range channels are neither bypassed nor blocked._ Therefcre no reduction in safety margin is
. experienced, and the change is consistent with the safety. analysis as u 1 described,in: Chapter 15 of the FSAR.
Modes 3, 4, 5
! Table 3.3-1, Item 6.b requires 2 source range channels'to be operable
' including the Reactor trip feature'as well as the boron dilution flux
' doubling signal.
If 1' channel of source range becomes inoperable then Action 5, which
~
allows 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to repair, or within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> open the reactor trip breakers, suspend positive reactivity changes, and verify valves BG-V178 and BG-V601
,, are closed and secured in position, would apply. This' action, if carried
'past the 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> time limit, would place the plant in the same lineup as in-Mode 6 with only-1 source range OPERABLE and is consistent with Standard Technical Specifications.
(There is currently no action statement for loss of both channels.
The Standard Technical Specifications (STS) allow only 1 source range
,, channel operable in Modes 3, 4, 5 if the Reactor Trip breakers are
>open.- If that channel is lost, SHUTDOWN MARGIN must be verified within 1
- hour and then once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter. The Standard Technical Specifications do not.take into account the boron dilution accident.
i- . _ . . . . . - . - _ _ _ _ , _ _ _ _ _ _ . _ . -
e -
Enclosure 2 ULNRC-889 8/1/84
' The real concern for an accident in Mode 3, 4 or 5 with the Reactor Trip breakers open, is the boron dilution accident. In Mode 6, it is deemed appropriate to prevent this accident by iso'ating all sources of dilution. Since the Callaway Technical Specifications currently have no action for loss of both source range channels, the proposed technical specification would place the plant in the same configuration as is required in Mode 6 with loss of both source range channels. Based on tb3 following analysis, this is considered acceptable.
IF both source range channels are lost:
A. Verifying the reactor trip breakers are open prevents positive reactivity additien via the control rods. (i.e., provides
. appropriate compensation for Hi Flux Shutdown Trip)
B.. Suspension of all operations involving positive reactivity changes will ensure the plant is stabilized.
C. Verifying SHUTDOWN MARGIN will ensure the appropriate boron concentration.
D. Verifying the Makeup Water Valves BG-V178 and BG-V601 are closed isolates all sources of dilution (i.e., provides appropriate compensation for the Flux Doubling Valve realignment).
These actions place the plant in a safe-condition consistent with the assumptions for the boron dilution accident analysis contained in Chapter 15 of the FSAR for Modes 3, 4 and 5.
x L
s
---.y ,.p
i Enclosure 3 ULNRC-889 8/1/84 SIGNIFICANT HAZARDS CONSIDERATION Callaway Plant, Unit 1 Technical Specification-Table 3.3-1 This amendment request revises Technical Specification Table 3.3-1 to include an action statement if two channels of the source range neutron flux monitors are not operable in Modes 3, 4 and 5 and allows the block of.both channels of flux doubling in Mode 2 in order to perform a 1eactor startup.
' The Commission has provided guidance concerning the application of the standards in 10 CFR 50.92 by providing certain examples (48FR14870).
. This amendment request is similar to the exaeple of an administrative change to technical specifications for correction of an error. In this case the Technical Specifications are not consistent with the plant design and would not allow plant startup.
This amendment request does not involve a significant increase in the
~
probability or consequences of an accident or other adverse condition over previous evaluations; nor create the possibility of a new or different kind of accident or condition over previous evaluations; nor
. . involve a significant reduction in a margin of safety. Based on the foregoing,' the requested amendment does not present a significant hazard.
r t- . . .
Enclosure 4 ULNRC-889 8/1/84 ENVIRONMENTAL ASSESSMENT Callaway Plant Unit 1 Technical Specification - Table 3.3-1 This amendment request revises Technical Specification Table 3.3-1 to include an action statement if two channels of the source range neutron flux. monitors are not' operable in Modes 3, 4, and 5 and allows the block
- of both channels of flux doubling in Mode 2 in order to perform a
. reactor startup.
In accordance with 10 CFR 51.30, an environmental assessment has been performed. . This amendment request does not involve a significant
. increase in the probability or consequences of an accident or other adverse condition over previous evaluations; nor create the possibility of a new or different kind of accident or condition over previous evaluations; nor does_it pose any adverse environmental effects. This amendment has been discussed with Ron Kucera, Deputy Director, Missouri Department of Natural Resources. Based on the foregoing, the requested amendment poses no significant impact on the environment.
3, s
^
+