ML20093P191
| ML20093P191 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 10/26/1984 |
| From: | Moriarty J COLT INDUSTRIES, INC. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| REF-PT21-84-528-000 PT21-84-528, PT21-84-528-000, NUDOCS 8411060175 | |
| Download: ML20093P191 (1) | |
Text
Fairbank3 Mors2 Colt Industries Engine Division 701 Lawton Avenue Beloit. Wisconsin 53511 608/364-4411 October 26, 1984 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Attention: Mr. James G. Keppler, Director, Region III
Subject:
Colt Industries-Fairbanks Morse Engine Division Emergency Diesel Generators Part 21 Report Dated May 5,1983 Jacket Water Check Valve Disassembly Supplemental Report Number 1 Gentlemen:
The GPE Controls jacket water check valves used on the four D.G. sets at Public Service Electric & Gas Company's Hope Creek Station have been upgraded to eliminate the potential defect described in our May 5,1983 Part 21 report.
A copy of this report is being sent to the utility involved and to GPE Controls.
Very truly yours,
//f$i
. M. Moriarty MANAGER UTILITY JMM:jc cc: Bechtel Power Corp.
P. O. Box 3965 San Francisco, CA 94119 Attention: Hope Creek Project Engineer U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 GPE Controls 6511 Oakton Street Morton Grove, IL 60053 Attention: Mr. Daniel P. Schleiter DCT 291984 Quality Assurance Manager kDR h54 D
00 BI9$g Po"