ML20093M583

From kanterella
Jump to navigation Jump to search
Revised Proposed Tech Spec 4.1.3.3 Re Reactivity Control Sys
ML20093M583
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/19/1984
From:
DUKE POWER CO.
To:
Shared Package
ML20093M579 List:
References
NUDOCS 8410230019
Download: ML20093M583 (1)


Text

_ - ._. - _ ___ _ _ ______

.s ,

REACTIVITY CONTROL SYSTEMS ,

POSITION INDICATION SYSTEM - SHUTCOWN

. LIMITING CONDITION FOR OPERATION 3.1.3.3 One digital rod position indicator (excluding demani:Iposition indication) shall be OPERA 8LE and capable of determining the control rod position within 212. steps for each shutdown or control rod not fully inserted.

APPLICA8ILITY: MODES 3*#, 4*#, and 58#.

(

ACTION:

With less than the above required position indicator (s) OPERABLE, immediately open the Reactor Trip System breakers.

~

l SURVEILLANCE REQUIREMENTS

. ; - 4.1.3.3 Each of the above required digital rod position indicator (s) shall be detarmined to be OPERA 8LE by verifying that the digital rod position indicator

' agrees with the demand position indicator within 12 steps when exercised over the full-range of rod travel at least once per 18 months. %e%gfoe 3;9

? ~

$ s{em br<bers can be closed in enlet- lcfe&nn f;3 Susveillanc e.

i I

  • With the Reactor Trip System breakers in the closed position.
  1. See Special Test Exceptions Specification 3.10.5 l

G410230019 841019 PDR ADOCK 05000413 P PDR -

t CATAWBA - UNIT 1 3/4 1-18

___..___- ., ._. _ . _ _ _ _ _ . _ - - . _ . . . _ . ~ . , _ -----_--- _ ._ _