Safety Evaluation Supporting Amends 208 & 186 to Licenses DPR-53 & DPR-69,respectively
ML20093L207
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/19/1995
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20093L199 List:
References
NUDOCS 9510250242
Download: ML20093L207 (13)


Text

-

l.

    • o j

V UNITED STATES -

j

. NUCLEAR REGULATORY COMMISSION b

\\s...j WASHINGTON, o.C. asseH001 4

v SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT N0. 208 TO FACILITY OPERATING LICENSE NO. DPR-53

' AND AMENDMENT N0.186 TO FACILITY OPERATING LICENSE N0. DPR-69.

[

BALTIMORE GAS AND ELECTRIC COMPANY CALVERT CLIFFS NUCLEAR POWER PLANT. UNIT NOS. 1 AND 2 i

DOCKET NOS. 50-317 AND 50-318 1

I

.l.0 INTRODUCTION I

By letter dsted June 6,1995, the Baltimore Gas and Electric Company (the I

[

licensee)Lsubmitted a request for changes to the Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2 (CCNPPl/2), Technical Specifications (TSs). The i

requested changes would extend the nominal. surveillance interval for certain safety system instruments from existing 18 months to 24 months.

4 i

i The instruments which will be affected by the proposed amendments are included in-the reactor protective system (RPS), engineered safety features actuation system (ESFAS), power-operated relief valve (PORV) actuation, low temperature overpressure protection (LTOP), ' remote shutdown panel, post-accident monitoring (PAM), containment sump level and radiation monitoring. The surveillance-activities which will-be affected are instrument channel calibrations, RPS and ESFAS total bypass function operability verification,

'RPS and ESFAS time response tests, ESFAS manual trip button channel functional tests and ESFAS automatic actuation logic channel functional tests.

i

\\

CCNPP1/2 has been operating on a 24-month fuel cycle since July 1988 and July l

1 1987, respectively, and have been performing the 18 months surveillance activities, described above, during mid-cycle outages. Extending the surveillance interval from 18 months to 24 months will eliminate the need for

' scheduling mid-cycle outages. The request for the proposed changes is based on guidance provided by the NRC staff in Generic letter (GL) 91-04, i-

" Changes in Technical Specification Surveillance Intervals to Accommodate a-i.

' 24-month Fuel Cycle," dated April 2,1991.

l Specifically,.the proposed amendments will revise TS 4.3.1.1.2, TS 4.3.1.1.3, L

TS' Tables 4.3-1, 4.3.2.1.2, 4.3.2.1.3, 4.3-2, 4.3-3, 4.3-6, 4.3-10, 4.4.3.1.b, i

~ 4.4.6.1.b, and 4.4.9.3.1.b by extending the surveillance intervals from a

- nominal 18 months to 's refueling interval which is nominally 24 months, not to

. extend 30 months.

p i

j 951'0250242'951019 PDR ADOOK 05000317 P

PDR l

F l

'* 1 h

t 2.0 EVALUATION GL 91-04 provides guidance on how licensees should evaluate effects of i

~

L 24 month extension on safety of the plant and perform an evaluation to support l

a conclusion that the.effect.of such an extension on safety is insignificant.

I The licenses has performed a detailed engineering review of all instrument h

j:

loops affected to establish.the basis for-a 30 month (24 months + 25%)

calibration frequency.: Using Calvert Cliffs procedures, the analyses were performed to verify that the surveillance interval extensions have a small n

'effect'on plant safety and would not invalidate any assumption in the plant licensing basis.- The analysis was based on the guidance provided in the

~

following documents: GL 91-04, EPRI document TR-103335, March 1994, i-

" Guidelines for. Instrument Calibration Extension / Reduction Programs," ISA-L DRP67.04, Part II, Draft Recommended Practice," Methodologies for the P

Determination of Setpoints for Nuclear Safety-related Instrumentation," Draft 1

10, and ISA-S-67.04-1987, " Standard for Nuclear Safety-Related Instrumentation."

[

'In its submittal,' the licensee has provided summary of results of'the analyses

[

for each of the affected instrument loops. The evaluation results fndicated that the proposed extension does not require any setpoint changes and that the plant parameter indications are still acceptable, taking into cons,deration r

the ' effects of drift over a 30-month period, for safe plant operation and having the necessary information to effect a safe shutdown of an operating j;

unit.

The NRC staff reviewed the information provided by the licensees and determined that it supported the requested extension in the surveillance f.

interval.

J i

In GL 91-04, the NRC staff discussed seven issues pertaining to increasing the

. interval for instrument surveillances and identified specific actions that licensees should take to address each of these issues. The NRC staff i

evaluated the licensee's submittal to verify that it adequately addressed all of the issues identified in the GL necessary to provide an acceptable basis for increasing the calibration interval for instruments that are used to

[

perform safety-related functions.

)

L In its submittal, the licensee stated that the as-found and as-left data was i

not used to make a determination of drift for WEED brand RTDs and for

.Rosemount Model Numbers 1152, 1153 or 1154 transmitters. The WEED brand RTDs, L

which are used as temperature sensors, were installed a few years ago. There is limited as-found-and as-left data available for statistical analysis.

Therefore, industry test results were.used in analysis in lieu of as-found and I

as-leftl data. : The industry testing (NUREG/CR-5560, EPRI/RP-2409-15) has demonstrated that nuclear grade RTDs are bounded by a 30-month drift E

. specification of i 0.36*F. At CCNPPl/2, many pressure transmitters, which are c

affected by this proposed TS revision, have either been replaced or will be

[-

replaced;in the near future with new Rosemount Model Numbers 1152, 1153 or

'1154 transmitters. Because there is limited or no plant-data available for s<

._-,-_____.L___;_~

~. _, +

. ~. -. - -. -

t.

l-p statistical' analysis, the manufacturer's test results were used in the f,

analysis in lieu of-as-left and as-found data. The manufacturer's testing has i

demonstrated.that sensor parameters of the Rosemount transmitters were' bounded by a 30-month. stability specification of i 0.2% of the upper range limit.

In addition to the Rosemount transmitters and WEED RTDs, the design of the CCNPPl/2. employs few other kinds of devices used as primary sensors for. which.

L.

.the licensee believed that drift data is not applicable for surveillance extension analyses. These devices include Neutron detectors, acoustic valve 1

monitors (AVMs), refueling water tank (RWT) level switches and radiation e'

detectors.

Evaluation of each such device was performed on a case-by-case basis.

i Neutron detectors were excluded from channel calibration because they are

. passive devices with minimal drift and present difficulty of simulating a meaningful signal. The historical data for AVMs. indicated that these passive 4

r, sensors have operated satisfactorily over their installed lifetime and no adverse trends have been observed. Therefore, the licensee determined that AVM i-components were not subject to drift mechanisms. The RWT level switches are mechanical devices and their quarterly Channel Functional tests are equivalent to Channel Calibrations. Therefore, 30 month drift was not considered for h

calibration extension for these switches. Radiation detectors are cD ibrated i

by placing a gamma source next to detector.

For the " Containment Purge Valve Isolation," the current 18 month surveillance for the loop is performed prior L

to entering Mode 6, the only Mode for which this loop.is required.

By i

continuing to perform the surveillance prior to entering Mode 6, which would be 24 months instead 18 months, will not invalidate any assumption in the plant licensing basis.

For " Containment Area High Radiation" loop, the licensee found that during calibrations from 1983 through 1992, except for two post modification calibrations which were not relevent due to the modifications that were implemented, radiation monitors have always been within calibration tolerances and did not require any adjustments. Therefore, j

the licensee determined that these radiation detectors were not subject to L

drift mechanisms.

i In its submittal, the licensee indicated that total loop uncertainties for 30-month surveillance intervals have been used to evaluate actuation setpoints and-their relation to analytical limits for the RPS, ESFAS, PORV, LTOP, containment sump level.snd radiation monitoring Instruments. No case was found where the setpoints needed to be revised. The remote shutdown and PAM instruments have no setpoints for automatic equipment response, therefore, were not included in the above evaluation.

In its submittal, the licensee indicated that the response of automatic-equipment and operator indications were considered in evaluating the ability i

.to achieve a safe shutdown with the associated instrumentation. The 30-month uncertainties calculated for instrument functions that automatically actuate l

equipment were found to be bounded by the uncertainties assumed in the safety

-analyses.

Plant operators normally rely on guidance provided mainly by the emergency operating procedures (EOPs) to' perform a plant shutdown in response I

L i.

J '.,_~ _. _

i

[.

a 4

l to an accident or. transient..The Safety Function Status checklists contained in E0Ps are used to maintain the plant parameters within.their required.

limits. Calculated uncertainties for instruments were determined to be i

acceptable for the control of plant parameters necessary to effect a safe j

shutdown.

i i

In its submittal, the licensee indicated that.the routine monitoring program at CCNPPl/2 consists channel calibrations, channel checks, and/or channel i

functional checks' to provide reliable indication of instrument operation. The licensee further indicates that the routine monitoring program has identified i

improperly operating instruments. The as-found calibration data collected i

during refueling outages are evaluated as part of the surveillance program.

The licensee initiates corrective action (s) when instrument parameter are i

found to be out of the specified acceptance criteria.

In addition, an I

evaluation was performed to verify that instrument parameter bands used in the surveillances would identify degrading instrument performance. The licensee stated that its existing monitoring program will identify improper operation and that appropriate action will be initiated to address problems associated L

with drift that could potentially cause plant parameters to exceed accident analyses assumptions.

l The NRC staff has determined that, based on the above, the licensee has j

adequately addressed GL 91-04.

3.0

SUMMARY

Based upon the above review, the NRC staff finds that the licensee has followed the applicable provisions of GL 91-04 and where deviations were identified, provided an adequate justification for each deviation. Therefore, the staff has concluded that the proposed revisions to the TSs are acceptable.

I Specifically, TS 4.3.1.1.2, TS 4.3.1.1.3, and TS Tables 4.3-1, 4.3.2.1.2, l

4.3.2.1.3, 4.3-2, 4.3-3, 4.3-6, 4.3-10, 4.4.3.1.b, 4.4.6.1.b, and 4.4.9.3.1.b i

will be revised by extending the surveillance intervals from a nominal i.

18 months to a refueling interval which is nominally 24 months, not to extend l

30 months.

4.0 STATE CONSULTATION

t t

In accordance with the Commission's regulations, the Maryland State official was notified of the proposed issuance of the amendments. The State official j

had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no i

significant change in the types, of any effluents that may be released i

offsite, and that there is no significant increase in individual or cumulative occupational. radiation exposure. The Commission has previously issued a e

e I

r_.-

~

proposed finding _that the amendments involve no significant hazards consideration,.and there has been no public comment on such finding (60'FR 35061). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above.

-- that:

(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner,-(2).such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common

- defense and security or to the. health and safety of the public.

- Principal Contributor:

S.- Athavale Date: October 19, 1995 i

f

)

s s

L L

4 v

e e

v

_________._._.._m.

?

L g

TABLE 4.3-2 (Continued)

R-G g

EMINEERED SAFETY FEATURE ACTUATI0ll SYSTEM INSTRUMENTATIM SMVEILUDICE REWIREMENTS w

m n

=

R CIUWlEL MODES Ill MICll C

q CIUUlllEL CIUNIEL FUNCTI0llAL SMVEILLAllCE g

FUllCTIONAL UllIT CNfCK CALIBRATI0ll IDI REWIRED g

7.

LOSS OF POWER d

E a.

4.16 kv Emergency Bus Undervoltage NA REFUELIM Q

1, 2. 3 (Loss of Voltage)

INTERVAL b.

4.16 kv Emergency Bus Undervoltage NA REFUELIM Q

1, 2. 3

)

(Degraded Voltage)

INTERVAL 8.-

CVCS ISOLATION

.M West Penetration Room / Letdown NA REFUELIM Q

1,2,3,4 Y

Heat Exchanger Room Pressure - High INTERVAL 9.

AUXILIARY FEEDWATER a.

Manual (Trip Buttons)

NA NA REFUELIM NA l

INTERVAL l

b.

Steam Generator Level - Low S

REFUELIM Q

1,2,3 INTERVAL c.

Steam Generator AP - High S

REFUELIM Q

1,2,3 INTERVAL k

d.

Automatic Actuation Logic NA NA MW

1. - 2, 3 i

N8

i~

l 3/4.3 INSTRUMENTATION TABLE 4.3-2 (Continued)

]

TABLE NOTATION Containment isolation of non-essential penetrations is also initiated

[

by SIAS (functional units 1.a and 1.c).

Must be OPERABLE only in M0DE 6 when the valves are required OPERABLE f

and they are open.

i III The logic circuits shall be tested manually at least once per

]

31 days.

l (2)

SIAS logic circuits A-10 and B-10 shall be tested monthly with the l.

exception of the Safety Injection Tank isolation valves. The SIAS logic circuits for these valves are exempted from testing during l

operation; however, these logic circuits shall be tested at least j.

once per REFUELING INTERVAL during shutdown.

l 2

I3)

SIAS logic circuits A-5, and B-5 are exempted from testing during operation; however, these logic circuits shall be tested at least

]-

once per REFUELING INTERVAL during shutdown.

l I4)

CIS logic circuits A-5 and B-5 are exempted from testing during i

operation; however, these logic circuits shall be tested at least once per REFUELING INTERVAL during shutdown.

l 5

(5)

SGIS logic circuits A-1 and B-1 are exempted from testing during 1

operation; however, these logic circuits shall be tested at least once per REFUELING INTERVAL during shutdown.

l (6)

. CSAS logic circuits A-3 and B-3 are exempted from testing during operation; however, these logic circuits shall be tested at least once per REFUELING INTERVAL during shutdown.

l i

t 1

i I

s CALVERT CLIFFS - UNIT 1 3/4 3-22 Amendment No. 208 i

_.m

. ~

a

~'

g TABLE 4.3-3' R-Q g'

RADIATION MONITORIIIG INSTRUMENTATIM SURVEILLANCE REWIREMEllT)

--s
b CllAINIEL -

MODES IN WICII

j CilAIBIEL CilAINlEL FUllCTIONAL SURVEILLAIICE l

" 'INSTRUNENT CIIECK

' CALIBRATI0ll TEST

' REQUIRED-m e

1.

AREA MONITORS 5

1

n E

d-a.

Containment E

w

i. Purge & Exhaust Isolation S

REFUELIllG ~

M 6-i INTERVAL b.

Containment Area High Range S

REFUELIINi M

1, 2, 3, & 4 INTERVAL i

R 2.

PROCESS MONITORS 1

Y a.

Containment I

M 1.

Gaseous Activity a) RCS Leakage Detection S

R~

M 1, 2, 3, & 4 -

i

11. Particulate Activity i

a) RCS Leakage Detection S

R M

1, 2, 3, & 4 g

E b.

Noble Gas Effluent Monitors 5

5 1.

Main Vent Wide Range S

R M

1, 2, 3 & 4

=

1 ii. Main Steam Header S

R M

1, 2, 3, & 4

.g a

s:

q

~

f 3/4.3 INSTRUNENTATION 1

TABLE 4.3-6 REMOTE SNUTD0WN MONITORING INSTRUNENTATION SURVEILLANCE REQUIREMENTS i

CNANNEL CNANNEL INSTRUN(NT CHECK CALIBRATION 1.

Wide Range Neutron Flux M

NA 2.

Reactor Trip Breaker Indication M

NA I

3.

Reactor Coolant Cold Leg Temperature M

REFUELING INTERVAL i

4.

Pressurizer Pressure M

REFUELING INTERVAL i

4 5.

Pressurizer Level M

REFUELING INTERVAL 6.

Steam Generator Level (Wide Range)

M REFUELING INTERVAL 7.

Steam Generator Pressure M

REFUELING INTERVAL l

l 4

4 i

i 4

1 CALVERT CLIFFS - UNIT 1 3/4 3-32 Amendment No. 208

l l

g TABLE 4.3-10 R

r-j h

POST-ACCIDENT MONITORIM INSTRUMENTATION SURVEILLANCE REQUIREMENTS 6*

i l

b CHANNEL CHAMEL 7

INSTRUMENT CHECK CALIBRATION g'

1.

Containment Pressure M

REFUELIM INTERVAL l

Q i

E 2.

Wide Range Logarithmic Neutron Flux Monitor M

NA

[

3.

Reactor Coolant Outlet Temperature M

REFUELIM INTERVAL

~l E

4.

Pressurizer Pressure M-REFUELIM INTERVAL l

5.

Pressurizer Level M

REFUELIM INTERVAL l

6.

Steam Generator Pressure M

REFUELI M INTERVAL l

g 7.

Steam Generator Level (Wide Range)

M REFUELIM INTERVAL l

y 8..

Auxiliary Feedwater Flow Rate M

REFUELIM INTERVAL l

i M

9.

RCS Subcooled Margin Monitor N

REFUELIM INTERVAL l

10. PORV/ Safety Valve Acoustic Monitor NA REFUELIM -INTERVAL l
11. PORY Solenoid Power Indication NA NA
12. Feedwater Flow M

REFUELIN INTERVAL l

13. Containment Water Level (Wide Range)

M REFUELIM INTERVAL l

3 g

14. Reactor Vessel Water level M

NA O.

2

15. Core Exit Thermocouple System M

R*

i A

i E

b The performance of a CHA M EL CALIBRATION operation exempts the Core Exit Thermocouple but.

8 includes all electronic components. The Core Exit Thennocouple shall be calibrated prior to installation in the reactor core.

3/4.4 REACTOR COOLANT SYSTEN SURVEILLANCE REQUIRENENTS

]

4.4.3.1 Each PORV shall be demonstrate.d OPERABLE:

a.

At least once per 31 days by performance of a CNANNEL FUNCTIONAL TEST, in accordance with Table 4.3-1 Item 4.

b.

At least once per REFUELING INTERVAL by perfomance of a CHANNEL l

CALIBRATION.

4.4.3.2 Each block valve shall be demonstrated OPERABLE at least once per d

92 days by operating the valve through one complete cycle of full travel

.unless the block valve is closed to meet the requirements of Action a, b, j

or c in Specification 3.4.3.

4 3

i i

f 1

i a

4 j.

CALVERT CLIFFS - UNIT 1 3/4 4-8 Amendment No. 208

I' 3/4.4 REACTOR C0OLANT SYSTEM SURVEILLANCE REQUIRENENTS i

4.4.6.1 The Leakage Detection Systems shall be demonstrated OPERABLE by:

a.

Containment Atmosphere Gaseous and Particulate Monitoring Systems-perfonnance of CNANNEL CHECK, CNANNEL CALIBRATION and CNANNEL FUNCTIONAL TEST at the frequencies specified in Table 4.3-3, and

.b.

Containment Sump Level Alann System-perfonnance of CNANNEL i

CALIBRATION at least once per REFUELING INTERVAL.

l J

l i

\\

l t

i i

1 1

l CALVERT CLIFFS - UNIT 1 3/4 4-18 Amendment No. 208

)

3/4.4 REACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION (Continued) i 2.

Verify the excessive flow condition did not raise pressure i

i above the maximum allowable pressure for the given RCS l

temperature on Figure 3.4.9-1 or Figure 3.4.9-2.

3.

If a pressure limit was exceeded, take action in accordance with Specification 3.4.9.1.

h.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS i

4.4.9.3.1 Each PORV shall be demonstrated OPERABLE by:

a.

Perfomance of a CHANNEL FUNCTIONAL TEST on the PORV actuation channel, but excluding valve operation, within 31 days prior to entering a condition in which the PORV is required OPERABLE and at least once per 31 days thereafter when the PORV is required OPERABLE.

b.

Performance of a CNANNEL CALIBRATION on the PORV actuation channel at least once per REFUELING INTERVAL.

I c.

Verifying the PORV block valve is open at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> when the PORV is being used for overpressure protection.

d.

Testing in accordance with the inservice test requirements pursuant to Specification 4.0.5.

4.4.9.3.j! The RCS vent (s) shall be verified to be open at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the vent (s) is being used for overpressure protection.

4.4.9.3.3 All high pressure safety injection pumps, except the above OPERABLE pump, shall be demonstrated inoperable at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> i,

by verifying that the motor circuit breakers have been removed from their electrical power supply circuits or by verifying their discharge valves are locked shut. The automatic opening feature of the high pressure safety 4

injection loop MOVs shall be verified disabled at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The above OPERABLE pump shall be verified to have its handswitch in pull-to-lock at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4 i

Except when the vent pathway is locked, sealed, or otherwise secured in the open position, then verify these vent pathways open at least i

}

once per 31 days.

~

CALVERT CLIFFS - UNIT 1 3/4 4-35 Amendment No. 208