MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp ML20137B9371997-03-18018 March 1997 Proposed Tech Specs,Revising TS Section 5.3.1,fuel Assemblies to Allow Use of Alternate Zr-based Fuel Cladding Matl ZIRLO ML20137B9141997-03-18018 March 1997 Proposed Tech Specs,Revising TS SR 4.5.2.c to Clarify When Containment Entry Visual Insp Is Required ML20134Q0811997-02-17017 February 1997 Proposed Tech Specs,Revising TS 1.7, Containment Integrity, TS 3/4.6.1, Containment Integrity & TS 3/4.6.3, Containment Isolation Valves 1999-09-02
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20207J9621998-12-18018 December 1998 Rev 1 to TRM for Wolf Creek Generating Station,Unit 1 ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20195E7671998-11-10010 November 1998 Rev 0 to EPP 01-2.4, Core Damage Assessment Guidance ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20138F3371997-04-30030 April 1997 Rev 0 to Offsite Dose Calculation Manual ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp 1999-09-02
[Table view] |
Text
- . ., . .. .
Atytchment IV.to ET 95-0080 ,
l Page 2,of 6 .
- .114.B RLRcTRICAL POWER SYSTEMS 3/4.s.1' A. c. souncun
-l OPERATING l LIMITING CONDITION FOR' OPERATION 3.8.1.1 As a minimum, the'following A.C. electrical power sources shall be OPERABLE:
- a. Two physically independent ~ circuits between the offsite transmission network and the Onsite Class 1E Distribution System, and
- b. Two separate and independent diesel generators, each with:
- 1) A separate day tank : nteining : mini =ur tclu== cf 510 g:110n Of fuel with a minimum fuel oil free surface elevation of 86 inches from the bottom (outside diameter) of the tank, ,
~A separate fuel Oil Storage System containing a minimum volume
~
, 2) of 85,300 gallons of fuel, and l
' 3) A separate fuel transfer pump.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
- a. With an offsite circuit of the above required A.C. electrical power l sources inoperable, demonstrate the OPERABILITY of the remaining off-site A.C. source by performing Specification 4.8.1.1.1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If either diesel generator of the above required A.C. electrical power sources has not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate OPERABILITY by performing specification 4.8.1.1.2a.4* separately for that diesel 1 generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the'next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in. COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />,
- b. With one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the offsite A.C.
sources by performing Specification 4.8.1.1.1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaf ter. Demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Specifica-tion 4.8.1.1.2a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> **; restore the inoperable diesel generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the fol-lowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- The automatic start and sequence loading of a diesel generator satisfies the testing requirements of Specification'4.8.1.1.2a.4 for this Action Statement.
- This test is required.to be completed regardless of when the inoperable diesel. generator is' restored to OPERABLE status unless the diesel was Edeclared inoperable to do preplanned preventative maintenance, testing, or maintenance to correct a condition which, if left uncorrected, would not
' affect the operability of the diesel generator.
WOLF' CREEK - UNIT 1 ^3/4 8-1 Amendment No e, 82 e
. 9510240302 951018-
.- PDR -ADOCK 05000482
.Rg .. a x PDR - .
- __ i e__ _ _ _ _ _ _ -
_ . _ + _ P-
, Attachment IV to ET 95-0000 Page 3 ,of 6 RLECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:
- a. In accordance with the frequency specified in Table 4.8-1 on a STAGGERED TEST BASIS by:
- 1) Verifying the fuel level in the day tank fuel oil transfer pump starts on low level in the day tank standpipe,
- 2) Verifying the fuel level in the fuel storage tank,
- 3) Verifying the fuel transfer pump starts and transfers fuel from the storage system to the day tank,
- 4) Verifying the diesel starts and accelerates to at least 514 rpm in less than or equal to 12 seconds.** The generator voltage and frequency shall be 4160 + 160 - 420 volts and 60 1 1.2 Hz within 12 seconds ** after the start signal. The diesel genera-tor shall be started for this test by using one of the following signals:
a) Manual, or b) Simulated loss-of-offsite power by itself, or c) Safety Injection test signal.
- 5) Verifying the generator is synchronized, gradually loaded to an indicated 6000 to 6201 kW*** for at least 60 minutes, and
- 6) Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.
- b. At least once per 31 days and after each operation of the diesel where the period of operation was greater than or equal to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> by checking for and removing accumulated water from the day tanks;
- c. At least once per 31 days by checking for and removing accumulated water from the fuel oil storage tanks;
- This test shall be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that the mechanical stress and wear on the diesel engine is minimized.
- This band is meant as guidance to avoid routine overloading of the engine.
Loads in excess of this band for special testing under direct monitoring or momentary variations due to changing bus loads shall not invalidate this test.
' WOLF CREEK.- UNIT 1 3/4 8-3 Amendment No.-8 l
Atptchment IV to ET 95-0080 3
Page 4,of 6 PTWCTRICAL POWER SYSTEMS A.C. SOURCES SHUTDOWN 4 LIMITING CONDITION FOR OPERATION 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
- a. One circuit between the offsite transmission network and the Onsite Class 1E Distribution System, and
- b. One diesel generator with:
- 1) . A day tank cent ining : =ini=ur relu= ef 510 5:11:n: Of fuel ,
with a minimum fuel oil free surface elevation of 86 inches 4 from the bottom (outside diameter) of the tank,
- 2) A fuel storage system containing a minimum volume of l 85,300. gallons of fuel, and I 1
l
- 3) A fuel transfer pump. !
l APPLICABILITY: MODES 5 and 6.
ACTION: I With less than the above minimum required A.C. electrical power sources OPERABLE, immediately suspend all operations !.nvolving CORE ALTERATIONS, positive reactivity changes, movement of irradiated fuel, or crane operation with loads over the spent fuel pool. In af.dition, when in MODE 5 with the reactor coolant loops not filled, or in MOSE 6 with the water level less than 23 feet above the reactor vessel flange, immediately initiate corrective
. action to restore the required sources to OPERABLE status as soon as possible.
SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be
' demonstrated OPERABLE by the performance of each of the requirements of Specifications 4.8.1.1.1, 4.8.1.1.2 (except for Specification 4.8.1.1.2a.5)),
and 4.8.1.1.3.
~ WOLF CREEK - UNIT 1 3/4 8-8 Amendment No. 8, 82
,, At.tCchment IV to ET 95-0080 l ,
Page 5,of 6 ,
3/4.8 FMOTRICAL POWER SYSTEMS i -
I BASES i
. . _ - _ _ _ - _ . . . . - _ - - _ _ . - 1 l .
1 3/4.8.1. 3 /4. 8. 2. and'3/4.8.3 A.C. SOURCES. D.C. SOURERS AND ONSITE POWER DISTRIRUTION I
> The OPERABILITY of the A.C. and D.C power sources and associated distribution systems during operation ensures that suf ficient power will be h available to supply the safety-related equipment required for: (1) the safe shutdown of the facility, and (2) the mitigation and control of accident conditions within.the facility. The minimum specified independent and redundant A.C.'and D.C. power sources and distribution systems satisfy the requirements of l General Design Criterion 17 of Appendix A to 10 CFR Part 50.
The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility. operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the safety analyses and are based upon j maintaining at least one redundant set of onsite A.C. and D.C. power sources and -
- associated distribution systems OPERABLE during accident conditions coincident with an assumed loss-of-offsite power and single failure of the other onsite A.C. l source. The A.C. source and D.C. source allowable out-of-service times are based on Regulatory Guide 1.93, " Availability of Electrical Power Sources", December ,
1974. When one diesel generator is inoperable, there is an additional ACTION l requirement to verify that all required systems, subsystems, trains, components and devices, that depend on the remaining OPERABLE diesel generator as a source of 1 emergency power, are also OPERABLE, and that the steam-driven auxiliary feedwater pump is OPERABLE. This requirement is intended to provide assurance that a loss-of-offsite power event will not result in a complete loss of safety function of critical systems during the period one of the diesel generators is inoperable.
The term verify as used in this context means to administratively check by examining logs or other information to determine if certain components are out-of-service for maintenance or other reasons. It does not mean to perform the Surveillance Requirements needed to demonstrate the OPERABILITY of the component.
The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that: (1) the facility can be maintained in the shutdown or refueling condition fcr extended ,
time periods, and (2) sufficient instrumentation and control capability are I available for monitoring and maintaining the unit status. When determining i compliance with action statement requirements, addition to the RCS of borated !
water with a concentration greater than or equal to the minimum required RWST l I
concentration shall not be considered a3 be a positive reactivity change.
The Surveillance Requirements .ior demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory Guides 1.9, " Selection of Diesel Generator Set Capacity for Standby Power Supplies,"
Revision 1, November 1978, 1.108, " Periodic Testing of Diesel Generator-Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1, August 1977 i as modified by Amendment No. 8 issued on May 29, 1987, and 1.137, "Puel-Oil l Systems for Standby Diesel Generators," Revision 1, October 1979. l
=> INSERT A c:
WOLF CREEK - UNIT 1 B 3/4 8-1 Amendment No. 59 November 22, 1993
+
Agtechment IV to ET 95-0080 Page 6;of 6 s
DNSERT A l 4
i The design of the diesel generator fuel oil system is unique in that the day tanks include a standpipe mounted on the top of each tank. The day tanks are sized to supply a adnimum of one hour's worth of fuel for the diesel j generators while running at their continuous rating plus a 10 percent margin j (per ANSI N195-1976, " Fuel Oil Systems for Standby Diesel-Generators"). l However, early in the design phase it was discovered that the diesel J generators injection headers were located at an elevation above that of the
! day tanks. This would have caused the headers to drain back to the day tank, .,
i instead of remaining full, while in the standby mode. The diesel generators I are required to start and load within 12 seconds of receiving the start i signal. The diesel generators can be depended upon to meet this operability requirement as long as the supply piping to the injector pumps remains full at all times. Maintaining the day tank fuel oil level above the highest component in the engine fuel oil system will result in a positive pressure
- being applied throughout the system. This will assure the entire fuel oil system will be maintained full at all times. Thus, the standpipes were added to the day tanks, allowing the day tank level to be raised above the elevation of the injection headers. Since this required level of fuel oil is elevation- )
i dependent, instead of volume-dependent, LCos 3.8.1.1b.1) and 3.8.1.2b.1) l reflect the required elevation of fuel oil (i.e., oil level) from the bottom l of the tank, instead of specifying a volume amount (i.e., gallons) of fuel l
! oil. Performing Surveillance Requirement 4.8.1.1.2a.1) causes the transfer l pump to start on low tank level and refill the day tank to the pump shutoff l setpoint. Pump start and stop setpoints are set to ensure the oil level remains in the standpipe, thus verifying that the oil level has been maintained above the minimum required oil level since the last surveillance or diesel generator run.