ML20093G874

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to PSA-B-95-17, Calculation of Byron 1/ Braidwood 1 D4 SG Tube Support Plate Loads w/RELAP5M3, Addressing Addl Info Discussed During Meeting
ML20093G874
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 10/12/1995
From: Saccomando D
COMMONWEALTH EDISON CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093G877 List:
References
NUDOCS 9510190271
Download: ML20093G874 (1)


Text

. _ .

Commonwealth lilimn Company i 100 Opm Place Downers Grine,11.60515 October 12, 1995 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk

Subject:

RELAP5/ MOD 3 Hydrodynamic Load Model Pertaining to Commonwealth Edison's Request to Increase in the Interim Plugging Criteria for Byron Unit I and Braidwood Unit 1 Steam Generators NBC Docket Numbers:50454 and 50-456

References:

1 October 5,1995, Meeting between the Commonwealth Edison Company and the Nuclear Regulatory Commission Regarding Hydrodynamic Load Model for the Application of 3 Volt Interim Plugging Criteria

2. D. Saccomando letter to the Nuclear Regulatory Commission dated October 3, 1995, transmitting Additional Information Regarding the Increase in the Interim Plugging Criteria for Byron Unit I and Braidwood Unit 1 In the reference letter the Commonwealth Edison Company (Comed) discussed the use of the RELAP5/ MOD 3 as the hydrodynamic load model used to calculate the amount of tube support plate movement during a main steam line break event. The contents of this letter was further discussed during the reference meeting, at which Comed committed to providing the Staff with additional information on the code. Attached is " Calculation of Byronl/Braidwood 1 D4 Steam Generator Tube Support Plate Loads with RELAP5M3," which addresses the additional information discussed during the meeting, if you have any questions concerning this correspondence, please contact this office.

Sincerely, Denise M. Sac m do Senior Nuclear L censing Administrator Attachment ec: R. Assa, Braidwood Project Manager-NRR G. Dick, Byron Project Manager-NRR S. Ray, Senior Resident Inspector-Braidwood H. Peterson, Senior Resident Inspector-Byron H. Miller, Regional Administrator-RIII Office of Nuclear Safety-IDNS

'I C 0 0 R Q 9510190271 951012 00 PDR ADOCK 05000454 P PDR g\

A Unicom Company