OPERATING DATA REPORT DOCKET NO 50-413 DATE 0ctober 13. 1995 OPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346
- 1. Unit Nase: Catasha 1
- 2. Reperting Period: Septester 1, 1995-Septesbar 30,1995
- 3. Licensed Thereal Power (MWt):
3411
- 4. Naseplate Rating (Gross MWeli 13055 Notes eNaseplate Rating
- 5. Besign Electrical Rating (Net MWe):
!!45 (Gross MWe) calculated as
- 0. Maxisus Dependable Capacity (Gross MWe):
1192 1450.000 MVA :.90 power
- 7. Garisus Dependable Capacity (Net MWe):
1129 factor per Page 111,
- 9. If Changes Occur in Capacity Ratirigs (Iteas Number 3 Through 7) Since Last NURE6-0020.
Deport. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cuaulative
- 11. Hours In Reporting Period 720.0 6551.0 89904.0
- 12. Number Of Hours Reactor Was Critical 720.0 5599.3 70110.9
- 13. Reactor Reserve Shutdown Hours
--0-- -
--0--
- 10. Hours Generator On-Line 720.0 5504.2 68879.7
- 15. Unit Reserve Shutdown Hours
--0-- -
--0--
- 16. Gross Thersal Energy Generated (MWH) 2446422 18358586 224502017
- 17. Gross Electrical Energy Generated (MWH) 870010 6527356 79211106
- 10. Not Electrical Energy Generated (MWH) 825150 6170475 74493937
- 19. Unit Service Factor 100.0 84.0 76.6
- 20. Unit Availability factor 100.0 84.0 76.6
- 21. Unit Capacity fa. tor (Usir.g MDC Net) 101.5 83.4 73.1
- 22. Unit Capacity factor (Using DER Net) 100.1 82.3 72.4
- 23. Unit Forced Outage Rate 0.0 0.8 8.4
- 24. Shutdoun Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estisated Date of Startup:
- 26. Units In Test Status (Prior to Ccesercial Operation):
Forecast Achieved INITIAL CRITICALITY IN!!!AL ELECTRICITY COMMERCIAL CPERATION 9510190104 951013 PDR ADOCK 05000413 R
OPERATINGDATAREPORT DOCKET NO 50-413 UNIT Calauta 1 OATE 0ttober 13. 1995 COMPLETED BY R.A. Williaes TELEPHONE 704-302-5346 MONTH Sootenber,1995 QAl AVERAGE DAILY POWR LEVEL pel AVERA6E DAILY POWER LEVEL (MWe-Net)
(MWe-Meti i
l141 17 1143 2
1146 1B
!!46 3
1150 19 1149 4
1150 20 1149 5
1149 21 1145 6
!!45 22
!!40 7
1145 23 1116 8
!!44 24 1158 9
1145 25 1154 10 1142 26 1150 1146 27 1150 12 1140 29 1153 13 1144 29 1153 14 1141 30 1152 15 1142 16 1145
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME caran256 1 DATE lu /13 / n REPORT MONTH September 1995 COMPLETED BY x.
A.
williams TELEPHONE
( / us ) -s tse-dsee (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
-(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulato n Restriction 4-Other (Explain)
File ( N G-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)~
?
I 1
i f
~.
i
\\
4 4
I DOCKET: 50-413 UNIT: Catawba 1 1
l Date: 10/13/95 i
NARRATIVE
SUMMARY
s 4
MONTil: September 1995 -
j Catawba Unit i began the month of September operating at 100% full power. The unit operated at or near 100% full power for the entire month.
i d
i 4
4 i
i i-i 1
f i
)
l l
l l
f i
Prepared by: R. A. Williams j
Telephone: (704)- 382-5346 l
4
(
4 1'
I i
- _ -. ~ _ - -. _ - -. -
l I
MONTilLY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 1
~
2.
Scheduled next refueling shutdown: J.uncJ99fi 3.
Scheduled restart following refueling: Scotember 1996 l
Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i
ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
j If yes, what will these be?
1 i
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
4 l
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
j 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
2 l
7.
Number of Fuel assemblies (a) in the core: 12.1 1
(b) in the spent fuel pool: itiQ i
4 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
1 9.
Projected date oflast refueling which can be accommodated by present license capacity:
l Scotember 2002 J
DUKE POWER COMPANY DATE: October 13.1995
)
Name of
Contact:
R. A. Williams Phone: (704b 382-5346 4
I a
j 4
j 1
i i-.
OPERATIW6 DATA REPORT DOCKET N0 50-414 DATE 0ctober 13. 1995 OPERATING STATUS COMPLETED BY R.A,Willians TELEPHONE 704-302-5346
- 1. Unit Mane Catawba 2
- 2. Reporting Period: September 1,1995-September 30,1995 a
3.LicensedTherealPower(Mt):
3411
- 4. Waseplate Rating (Bross MWe):
1305a Notes *Naseplate Rating
- 5. Design Electrical Rating (Net MWe):
1145 (6 toss MWel calculated as
- 6. Maxieus Dependable Capacity (Gross MWeh
!!92 1450.000 MVA
.90 power
- 7. Maxisus Dependable Capacity (Net MWe):
1129 factor per Page til,
- 8. If Changes Occur in Capacity Ratings (! tens Nusber 3 Through 7) Since Last NUREG-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If any:
This Month Yr.-to-Data Cuaulative
- 11. Hours In Reparting Period 720.0 6551.0 79920.0
- 12. Nusber Of Hours Reactor Was Critical 720.0 6214.6 63223.9
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line 720.0 6173.4 62234.9
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. 6ross Thersal Energy Generated (MWH) 2436559 20859712 200558595
- 17. Gross Electrical Energy Generated (MWH) 862895 7383930 71083310
- 18. Net Electrical Energy 6ererated (MWH) 819568 6996998 66962551
- 19. Unit Service factor 100.0 94.2 77.9
- 20. Unit Availability Factor 100.0 94.2 77.9
- 21. Unit Capacity Factor (Using MDC Net) 100.8 94.6 74.1
- 22. Unit Capacity Factor (Using DER Net) 99.4 93.3 73.2
- 23. Unit Forced Outage Rate 0.0 5.8 8.6
- 24. Shutdoun Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling - October 06, 1995 - 42 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERAil0N
l 1
OPERATING DATA REPORT DOCKET NO 50-414 UNIT Catamba 2 DATE October 13. 1995 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH Seelenber. 1995 QB1 AVERAGE 04!LY POWER LEVEL QM, AVERAGE DA!LY POWER LEVEL (MWe-Net)
(MWe-Net) 1
!!36 17 1138 2
1109 18 1141 3
till 19 1142 4
!!40 20
!!42 9
1143 21 1837 6
1143 22 1134 7
1141 23 1148 P
8
!!40 24 1848 e
9 1121 25 1146 10 1136 26 1141
!!41 27 1143 12 1143 28 1145 13 1138 29 1146 14 1134 30 1146 15 1138 16
!!40 4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME CArantsa 2 DATE lu/13/93 REPORT MONTH September 1995~
COMPLETED BY x.
A.
williams TELEPHONE
(/v41-352-d34.6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S I (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other.(Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error-(Explain)
Exhibit I - Same Source H-Other (Explain)
-o
)
6
l DOCKET: 50-414 UNIT: Catawba 2 Date: 10/13/95 NARRATIVE
SUMMARY
MONTH: September 1995 Catawba Unit 2 began the month of September operating at 100% full power. The unit operated at or near 100% full power for the entire month.
i 1
l i
Prepared by: R. A. Williams Telephone: (704)-382 5346 1
1 i
i-I
(
4 i
~
MONTilLY REFUELING INFORMATION REOUEST l
I.
Facility name:
Catawba _ Unit 2 2.
. Scheduled next refueling shutdown: October 1995 3.
Scheduled restart following refueling: November 1995 Tile PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGil 6 WlLL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafler require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
i 6.
Important licensing considerations (new or different design or supplier, unreviewed design or j
performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a).
in the core: 123.
(b) in the spent fuel pool: 414 8.
Present licensed fuel pool capacity: 1411 l
Size of requested or planned increase:.::
9.
Projected date oflast refueling which can be accommodated by present license capacity:
Seotember 2011 i
DUKE POWER COMPANY DATE: October 13.1995 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 I.
4 i
i i '
., +.