ML20093D106
| ML20093D106 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 06/20/1984 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20093D109 | List: |
| References | |
| RTR-NUREG-0800, RTR-NUREG-800 GO3-84-399, NUDOCS 8407160120 | |
| Download: ML20093D106 (7) | |
Text
_
i Washington Public Power Supply System l
3000 George Weehington Way P.O. Box 964 Richland, Washington 99362 0968 (509)372 5000 i
i Docket No. 50-508 l
June 20.1984 003-84-399 Director of Nuclear Reactor Regulation l
Attention: Mr. G. W. Knighton, Chief Licensing Branch No. 3
't Division of Licensing US Nuclear Regulatory Commission f
Washingles, D. c.
20555 l
Subject:
NUCLEAR PROJECT 3 AMEN 0 MENT 5 TO THE FSAR l
i t
References:
a) Letter #G03-83-893, G. C. Sorensen to G. W. Knighton, dated Nom.Ser 22, 1983 l
b) Letter #G03-84 030, G. C. Sorensen to G. W. Knighton, l
dated January 17, 1984 l
c) Letter #G03-84-142, G. C. Sorensen to G. W. Knighton, I
dated March 7,19M i
dated Apell 6,1984
. C. Sorensen to G. W. Knighton, d)
Letter #G03 84-213 G e) Letter #G03 84 265 G. C. Sorensen to G. W. Knighton, dated Apell 27, 1984 Pursuant to 10CFR2.101(a) and in accordance with the guidance contained in Generic Letter 8214, the Washington Public Power Supply System (Supply Sys-tem) is f t1tng herewith sixty (60) copies of Amendment $ to the FSAR for Nuclear Project 3 (WNP-3),
i This amendment contains supplemental infomation pertainin to the WNP-3 Review for Conformance with the Standard Review Plan (SRP)g NUREG OiOO, as required by 10CFR50.34( ).
Also included is the material presented earlier i
in References a) throu e) which transmittod marked up FSAR pages in re-sponse to NRC Requests r Additional Information.
[
Yi sg72 oWS
.,P ;
t t
l G. W. Knighton Page 2 l
NUCLEAR PROJECT 3 AMEN 0 MENT 5 TO THE FSAR i
l i
i Finally, this amenhent includes material intended to update the design I
description and correct typographical errors.
Should you require further infomation or clarification, the Supply System point of contact for this
[
matter is Mr. D. W. Coleman, Licensing Project Manager (206-482-4428 Ext.
t j
5436),
j i
Very truly yours, j
A= T ::J G. C. Sorensen, Manager Regulatory Programs l
l AJM/tn
[
cc JA Adams NESCO w/o
[
V Norses NRC w/o J Porrovecchio Ebasco(NYO)w/o NS Reynolds DM.
w/o 3 Smithpeter SPA w/o l
j WNP-3 Files w/o e
l k
b i
l i
4 l
(
{
t
[
[
I I
i STATE OF WASil!NGTON)
Subject:
WNP-3 FSAR Amendment f5
)
ss C0tMTV 0F BENTON
)
i
! G. C. Sorensen, being duly sworn, subscribe to and say that I am the Man-ager, Regulatory Programs for the the WASHINGTON PUBt.!C POWER SUPPt.Y SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my <nowledge, infor-mation and belief the statements made in it are true, f
f DATED elO M&Ns'
.,1994 i
i
^-
J
- 4. c sor
, anager s
i Regulatory Programs l
l 1
On this day personally appeared before me G. C. SORENSEN, to me known to be i
the individual who executed the foregoing instrument and acknowledged that i
ho signed the same as his free act and deed for the uses and purposes there-i in mentioned.
t GIVEN under g hand and seal this [kdey of D
1984 v
W ul}lfcInaridTo7tWe oTa'ry
~i State of Washington Residing at k
YHae l m I
i i
[
f l
Washington Public Power Supply System l
so ??23 Elma. Washington 98541 1223 (2061482-4428 i
Docket No. 50-508 June 20,1984 i
G03-84-399 f
l Director of Nuclear Reactor Regulation Attention: Mr. G. W. Knighton, Chief Licensing Branch No. 3 Dividon of Licensing i
US Nuclear Regulatory Comission Washington, D. C.
20555
Subject:
NUCLEAR PROJECT 3 AMENDMENT 5 TO THE FSAR
References:
a) Letter #G03-83-893, G. C. Sorensen to G. W. Knighton, dated November 22, 1983 (N
b) Letter #G03-84-030, G. C. Sorensen to G. W. Knighton,
)
dated January 17, 1984
,\\~/
c)
Letter #G03-84-142, G. C. Sorensen to G. W. Knighton,
~
dated March 7,1984 d) Letter #G03-84-213, G. C. Sorensen to G. W. Knighton, i
dated April 6, 1984 e)
Letter #G03-84-265, G. C. Sorensen to G. W. Knighton, dated April 27, 1984 Pursuant to 10CFR2.101(a) and in accordance with the guidance contained in Generic Letter 82-14, the Washington Public Power Supply Syste"i (Supply Sys-tem) is filing herewith sixty (60) copies of Amendment 5 to the FSAR for Nuclear Project 3 (WNP-3).
xThis namendment contains supplemental -infomation pertaining to the WNP-3 Review for Confomance with the Standard Review Plan (SRP) NUREG-0800, as required by 10CFR50.34(g).
Also included is the material presented earlier in References a) through e) which transmitted marked up FSAR pages in re-sponse to NRC Requests for Additional Infonnation.
l (D
G. W. Knighton Pag; 2 I
NUCLEAR PROJECT 3, AMENDMENT 5 TO THE FSAR i
Finally,~ this amendment includes material intended to update the design description and correct typographical errors.
Should you require further j
infonnation or clarification, the supply System point of contact for this matter is Mr. D. W. Coleman, Licensing Project Manager (206-482-4428 Ext:
i 5436).
l i
Very truly yours, i
l G. C. Sorensen, Manager Regulatory Programs AJM/tn e
cc: JA Adams NESCO w/o V Nerses NRC w/o l
J Porrovecchio Ebasco (NYO) w/o l
NS Reynolds D&L w/o D Smithpeter BPA w/o l
(
WNP-3 Files w/o i
i I
~
~
l l
O t
I
~,
p) iU STATE OF WASHINGTON)
Subject:
WNP-3 FSAR Amendment #5 l
)
ss COUNTY OF BENTON
)
1 G. C. Sorensen, being duly sworn, subscribe to and say that I am the Man-ager, Regulatory Programs for the the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, infor-mation and belief the statements made in it are true.
2 b JWA/f DATED
, ]g84
- G. C. Sor(nsen, Manager Regulatory Programs On this day personally appeared before me G. C. S0RENSEN, to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes there-in mentioned.
i GIVEN under my hand and seal this M M day of 1984.
V t
hoffy Puty7ic in and fot the State of Washington Residing at
, /l)6 7%clu h999 i
i oO 4
i l
/%
STATE OF WASHINGTON)
Subject:
WNP-3 FSAR Amendment #5
)
ss COUNTY OF BENTON
)
1 G. C. Sorensen, being duly sworn, subscribe to and say that I am the Man-f ager, Regulatory Programs for the the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, infor-mation and belief the statements made in it are true.
r 2 0
/ud/E DATED
, 1984
- G. C. Sor(nsen, Manager l
Regulatory Programs L
D)
On this day personally appeared before me G. C. SORENSEN, to me known to be
/
the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes there-in mentioned, i
GIVEN under my hand and seal this M M day of 1984.
V Noffy Puty7ic in and fo/ the State of Washington Residing at
, /l)N M h999
\\d E
,,.-.,n.,
....... -.. - - -... - - - - - -.