ML20093C977

From kanterella
Jump to navigation Jump to search
Forwards Independent Design Review of Limerick Generating Station 1,Core Spray Sys, Bimonthly Status Rept 8 for Period Ending 840915.Related Correspondence
ML20093C977
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/17/1984
From: Carpenter F
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
To: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20093C980 List:
References
CON-#484-993 OL, NUDOCS 8410110028
Download: ML20093C977 (1)


Text

-,

w 4 RELEiD CCF H;TO. CFJiCE q

TORREY PINES TECHNOLOGY 0

Ro. Bom 85608

'/

San D.cgo. Ca.*foma 92138 Teicp5cnc. (619) 455-2054 A bv.s.on a GA Technologies Inc.

84 SEP 24 NO:37 0FFf;E OF S M O..

00CKETit4G A SEFW BRANCH TPr:053:FDC:84 Septator 17, 1984 d '~~

p -35 2P Philadel;hia Electric Cmpany c.. S.7d M ;"'

-2301 Market Street S25-1

t Philadelphia, PA 19101 Attention

V. S. Boyer, Sr. Vice President fluclear Power Gentlmen:

The enclosed status report is_ the~ ci hth issced for the Independent E

Design Review of the Limerick Generating Static,n Unit 1 Core Spray Systm.

This report covers the period Septaber 1,1984 to Septmber 15,'1984.

A copy of this report is being sent directly to the representative of

- the U. S. Nuclear Regulatory Commission.

Please. call me if you have any. questions re6arding the contents of this report.

Sincerely, F. D. Car nter Project Manager cc: PECo:

R. A. Mulford N2-1 E. C. Kistner J. Poskowitz L. B. Pyrih G..J. Beck

. Limerick Service List Bechtel:

S. J. Playhar USNRC:

J. M. Milhoan, Chief Licensing Section Quality Assurance Branch, Office of Inspection and Enforcement U. S. Nuclear hegulatory Cccaission EWS.-305A Washington, DC 20555 8410110028 840917 PDR ADOCK 05000352 A

PDR i

s

-