ML20093C977
| ML20093C977 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 09/17/1984 |
| From: | Carpenter F GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER |
| To: | Boyer V PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20093C980 | List: |
| References | |
| CON-#484-993 OL, NUDOCS 8410110028 | |
| Download: ML20093C977 (1) | |
Text
-,
w 4 RELEiD CCF H;TO. CFJiCE q
TORREY PINES TECHNOLOGY 0
Ro. Bom 85608
'/
San D.cgo. Ca.*foma 92138 Teicp5cnc. (619) 455-2054 A bv.s.on a GA Technologies Inc.
84 SEP 24 NO:37 0FFf;E OF S M O..
00CKETit4G A SEFW BRANCH TPr:053:FDC:84 Septator 17, 1984 d '~~
p -35 2P Philadel;hia Electric Cmpany c.. S.7d M ;"'
-2301 Market Street S25-1
- t Philadelphia, PA 19101 Attention
V. S. Boyer, Sr. Vice President fluclear Power Gentlmen:
The enclosed status report is_ the~ ci hth issced for the Independent E
Design Review of the Limerick Generating Static,n Unit 1 Core Spray Systm.
This report covers the period Septaber 1,1984 to Septmber 15,'1984.
A copy of this report is being sent directly to the representative of
- the U. S. Nuclear Regulatory Commission.
Please. call me if you have any. questions re6arding the contents of this report.
Sincerely, F. D. Car nter Project Manager cc: PECo:
R. A. Mulford N2-1 E. C. Kistner J. Poskowitz L. B. Pyrih G..J. Beck
. Limerick Service List Bechtel:
S. J. Playhar USNRC:
J. M. Milhoan, Chief Licensing Section Quality Assurance Branch, Office of Inspection and Enforcement U. S. Nuclear hegulatory Cccaission EWS.-305A Washington, DC 20555 8410110028 840917 PDR ADOCK 05000352 A
PDR i
s
-