ML20093C962
| ML20093C962 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/24/1983 |
| From: | Schuyler J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20093C965 | List: |
| References | |
| NUDOCS 8407160029 | |
| Download: ML20093C962 (3) | |
Text
_ _
C PV PACIFIC O A S.A.N D E LE C T RIC C O M PANY
. gg n acnc sincer. saw rnancisco, cauro==ia 34:es vei.ce=onc (4:s> rei.4 ::
August 24, 1983 Mr. John B. Martin, Regional Mministrator U. S. Nuclear Regulatory Comission, Region V 1450 Mar's Inne, Suite 210 Walnut Creek, CA 945 % -5368 Re: Ibcket No. 50-275, OL-DPR-76 Docket No. 50-323 Diablo Canyon Units 1 and 2 Fmergency Plan Implementing Procedures Updates
Dear Mr. Martin:
In accordance with Section V, "Iglementing Procedures," of 10 cm 50, Appendix E, we are submitting one copy of the updates to the detailed Implementing Procedures for the Diablo Canyon Pbwer Plant Units 1 and 2 Fmergency Plan an'd one copy of the updates to the Implementing Procedares for the Corporate Faergency Response Plan. Updates for both plans are as listed in Atrach=nt 1.
Concurrently, two copies of each update are being submitted to the h = t Control Desk.
Some of the updates contain privacy / proprietary information. 'Ihis privacy / proprietary information has been brackated in accordance with NRC Generic letter 81-27 and is identified in Attachnent 2.
Kindly acknowledge receipt of the above material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Sincerely, J. O. Schuyler Attachments cc w/att:
1 Service List i
}
cc w/o att:
G. W. Itnigher-1 8407160029 830824' PDR ADOCK 05000275 F
PDR L
AITAONENT 1 Updates Included In This Submittal DIAB 1D CANKN DfERGENCY PIAN Implenenting Procedures Voltane 3A Updated Table of Contents EP OP-11, On-The-Spot G ange EP R-6, On-The-Spot G ange EP R-7, On-h-spot Qvulge EP M-4, on-The-Spot mange EP M-9, Revision O Voltane 3B UpdarM Table of Contents EP EF-6 S1, Revision 1 EP RB-8, On-The-Spot Change OCRPORATE DfERGDEY RESKNSE PIAN I:nplementing Procedures Updated Table of Organization and Appendices Listing 1.1, Revision 2 1.2, Revision 3 4.2, Revision 2 4.7, Revision 3 e
ATINHfENr 2 location of Proprietary / Privacy Information Diablo Canyon Energency Plan Procedure:
i M-9, Revision 0 Page 2 of 8 Attachnent " Hazardous Waste Spill Ibtification Requirenents",
one page; Attachnent "Infomation Rc Hazardous Waste Releau" (Geck List) quired for Initial Reporting of
, one page.
EF-6 S1, Revision 1 Table 1, transfer of EARAUT Control, one page Corporate Energency Response Plan Procedure:
1.1, Revision 2 Attachnent 2, pages 1, 2 and 3 of 3; Attachment 3, page i of 1; Attachnent 4, pages 1, 2 and 3 of 3; Attachnent 5, pages 1, 2 and 3 of 3; Attachment 6, pages 1 and 3 of 4; Attachnent 7, pages 1, 2 and 3 of 4.
1.2, Revision 2
" Activation of the Corporate Incident Response Center", page 5 of 11; Attachnent 2, page 1 of 2 4.2, Revision 2 "Telee-mications" Ateach=nc 2, pages 1 and 2 of 2; Attachment 3, pages 1 and 2 of 2; Attachnent 4, pages 1 and 3 of 4 -
4.7, Revision 3
" Nuclear Plant Operations" Attachnent 2, pages 1, 2, 3 and 4 of 4; Attachment 3, pages 1 and 3 of 4 d
6
----