ML20093C716
| ML20093C716 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/24/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-30635-TDS, DER-84-50, NUDOCS 8410100667 | |
| Download: ML20093C716 (2) | |
Text
.
gN MCEIVED mc Arizona Public Service Company im SEP 27 N1 D E8
-September 24, 1984
[EGlG. '/ip N
ANPP-30635-TDS/1RB U;.S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park.
1450 Maria Lane - Suite 210 Walnut Creek, Calif ornia 94596-5368 Attention: Mr.. T. W.~ Bishop, Director Division of Resident Reactor-Projects and Engineering Programs
Subject:
Time Extension For Report - DER 84-50
~
A 50.55(e) Potentially Reportable Deficiency Relating To Main Steam Isolation Valves Do Not Close Within Five Seconds As Required.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between D. Hollenbach and T. Bradish on July 24, 1984 (B) ANPP-30316,' dated August 23,1984 (Interim Report)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).
At that time, it was estimated that a Final Report would -be available by September 25, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 25, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly,ours,
(
CLL(
ALL
(
E. E. Van Brunt, Jr.
t-APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj' 1
cc: See Page Two i
8410100667 840924 DR ADOCK 05000
'lO ZE-27
._1
- 7. -
Mr. - T. W. - Bishop
'Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nucleat Regulatory Commission Washington, D. C.
20555 T. G. - Woods, 'Jr.
D. B. Karner W. E. Ide D.
B.' Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J.- A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 i
c _. -
2