ML20092N639
| ML20092N639 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/21/1984 |
| From: | Lempges T NIAGARA MOHAWK POWER CORP. |
| To: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| (NMP21-0088), (NMP21-88), NUDOCS 8407030368 | |
| Download: ML20092N639 (1) | |
Text
i l
NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 June 21, 1984 (NMP2L 0088)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission
-Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
The final report in accordance with 10CFR50.55(e) concerning W. J. Woolley Company's Quality Assurance Documentation will be submitted to the Nuclear Regulatory Commission by October 31, 1984, rather than June 29, 1984, as previously committed.
This extension was granted via a telecon between Mr. T. Loomis (Nine Mile Point Unit 2 Licensing) and Mr. S. Collins of your staff on June 16, 1984.
Very truly yours, W
YS T.
. Lempfes Vice President Nuclear Generation TEL/TL:Ja xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gramm, Resident Inspector C I:. 3
- g J 7
8407030368 840621 PDR ADOCK 05000410 S
PDR 3
'O fgM