ML20092N603

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Undersized Structural Steel Shop Welds.Extension Granted Via 840621 Telcon W/T Loomis & Collins.Final Rept Will Be Submitted by 840921
ML20092N603
Person / Time
Site: Nine Mile Point 
Issue date: 06/25/1984
From: Lempges T
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(NMP2L-0093), (NMP2L-93), NUDOCS 8407030331
Download: ML20092N603 (1)


Text

M V NIAGARA R UMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVAPD WEST SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 June 25, 1984 (NMP2L 0093)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I g

Division of Project and Resident Programs e

631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

The final report in accordance with 10CFR50.55(e) concerning undersized structural steel shop welds (55(e)-84-01) will be submitted to the Nuclear Regulatory Commission by September 21, 1984, rather than June 29, 1984, as previously committed.

This extension was granted via telecon between Mr. T. Loomis (Nine Mile Point Unit 2 Licensing) and Mr. S. Collins of your staff on June 21, 1984.

Very truly yours, T. E. Lempges Vice President Nuclear Generation TEL/TL:ja xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Grann, Resident Inspector

,. a j y^

8407030331 840625 gDRADOCK05000

'O

,,2,,