ML20092K356
| ML20092K356 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/19/1995 |
| From: | NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20092K352 | List: |
| References | |
| NUDOCS 9509250357 | |
| Download: ML20092K356 (5) | |
Text
__
ky 16,1
- 2. 9s 1
3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 5AFETYINJECTIONTANXS(SITS)
~
LIMITING CONDITION FOR OPERAT!0N 3.5.1 Each reactor coolant system safety injection tank shall be.
T OPERABLE with:
a.
The isolation valve open and the power to the valve operator
- removed, b.
Between 1080 and 1190 cubic feet of borated water, c.
A minimum boron concentration of 1720 PPM, and d.
A n'itrogen cover-pressure of between 200 and 250 psig.
APPLICABILITY: N) DES 1, 2 and (b
- Nsotr@
ACTION:
T ith one safety injection tank inoperable, a result o
sed isolation valve, restore noperable tank to OPERABLE s ithin one h e in HOT SHUTDOWN within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
b.
With one s injection tank n due to the isolation valv g closed, either intnediately ope solation valve e in NOT STANDBY within one hour and be in H0 WN within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
l SURVEILLANCE REQUIREMENTS 4.5.1 Each safety injection tank shall be demonstrated OPERABLE:
"a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
]
l 1.
Verifying the water level and nitrogen cover-pressure in the tanks, and 2.
Verifying that each safety injection tank isolation valve is open.
J
- With pressurizer pressure 3,1750 psia.
MILLSTONE - UNIT 2 3/4 5-1 AmendmentNo.II)
EBg,2gggg; gggg g P.
Dec=har 8, EMERGENCY CORE COOLING SYSTEMS Z '-95,
SAFETY INJECT!0N TANKS (Continued)
'5URVEILLANCE REQUIREMENTS (Continued) 7_
b.
At Iean one pr il days and at each se1ut<a- ;;;.,,,. increase I of 2,15 of tank w h,...:4ysne the boron concentration of 1
L
- t: ;;.".6y injection tank solution.
_l w
g g. h(t:1 east once~per 11 dah)$/erify@ that the closing coil in the valve breaker cubicle fs remove
{/.
erifytngigt least once ner la mAnthDthat thel 'a' s
s #ety t'hi.svu tank isolation valves open automatically before the Reactor Coolant.5ystem pressure exceeds 1750 psia and on a safety in-j jection signal n
MILLSTONE - UNIT 2 3/4 5-2 AmendmentNo./p'j n.
, _ _...... _... _.. _....._ m
.a c a.
a 2.-16 -1 3 (USE RT k Verify esch SIT isolation valve is fully open at least once per a.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />."8 Verif borated water volume in each SIT is k 1080 cubic feet {l3 7,;...;-
b.
=So;{u,rs."d s 1190 cubic fest iS*" :.e.....:..;:) At least once pe an 12 Verify nitrogen cover-pressgre in each SIT is t 2G0 psig and s 150 psig c.
at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> d.
Verify boron tion in each 5!T is t 1720 ppa ier.d i 2000 pp4 at least once pe 0; 4.
and once within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume increa
% of tank volume" that is not the result of addition fro he refueling water storage tank.
\\
6 months l
e
- -..... -.. ~.. - -. -.
(
.4
- i-Docket'No. 50-336 B15354 l'
4
-)
Millstone Nuclear Power Station, Unit No. 2 Proposed Technical Specifications Revision Surveillance of Safety Injection Tanks Retyped Pages j
i f:
4 September 1995 1
c j
r
~
EMERGENCY CORE COOLING SYSTEMS SAFETY INJECTION TANKS (Continued)
SURVEILLANCE REQUIREMENTS 1
4.5.1 Each SIT shall be demonstrated OPERABLE:
a.
Verify each SIT isolation valve is fully open at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />."'
b.
Verify borated water volume in each SIT is 31080 cubic feat and s 1190 cubic feet at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.'
l c.
Verify nitrogen cover-pressure in each SIT is 2 200 psig and i
s 250 psig at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
I d.
Verify boron concentration in each SIT is 21720 ppm at least once per 6 months, and once within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after each solution volume l increase of 2 1% of tank vol ume"' that is not the result of addition from the refueling water storage tank.
e.
Verify that the closing coil in the valve breaker cubicle is removed at least once per 31 days, f.
Verify that the SIT isolation valves open automatically before the Reactor Coolant System pressure exceeds 1750 psia and on a safety injection signal at least once per 18 months.
l i
l (1)
If one SIT is inoperable, exceot as a result of baron concentration not within limits
.qt inoperable level or pressure instrumentation, surveillance is not applicable to the affected SIT.
(2)
If one SIT is inoperable due solely to inoperable water level instrumentation, surveillance is not applicable to the affected SIT.
(3)
If one SIT is inoperable due solely to inoperable pressure instrumentation, surveillance is not applicable to affected SIT.
(4) Only required to be performed for affected SIT.
MILLSTONE - UNIT 2 3/4 5-2 Amendment No. JJ.
0216