Responds to NRC Re Violations Noted in IE Insp Rept 50-410/83-16.Corrective Actions:Rev 2 to Drawing NMP-023 Issued to Clarify Weld Symbol & Reactor Controls, Inc QA Instruction 82,83 & 10-1 Revised
ML20092J391
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/30/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20092J389 List:
References
(NMP2L-0071), (NMP2L-71), NUDOCS 8406260437
Download: ML20092J391 (2)


Text

-

If Y NIAGARA l

ItUMOHAWK l

NIAGARA MOHAWK POWER CORPORATl0N/300 ERIE BOULEVARD WEST SYRACUS, N Y.13202/ TELEPHONE (315) 474-1511 May 30,1984 (NMP2L 0071)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Comission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

The following is submitted in response to your letter dated April 16, 1984 concerning the violation identified in Inspection Report No. 50-410/83-16.

Niagara Mohawk Power Corporation agrees that the combination of weld symbols shown on Drawing No. NMP-023 and Engineering Change Notice (ECN) No.01-003 could be subject to interpretation. The intent of issuing ECN No.01-003 was to provide an alternate (and acceptable) welding configuration for hard to access areas by using a combination of the two welding methods, if needed.

In order to demonstrate that the identified welds were installed in accordance with design requirements, Stone & Webster Engineering Corporation and Reactor Controls, Inc. performed a reinspection of the subject field welds for Reactor Controls Inc. supports depicted in Drawing No. NMP-023, Sheets 1 and 2, Revision 1.

All welds were acceptable.

Revision 2 of drawing No. NMP-023 has since been issued to clarify the weld symbol. Action to prevent recurrence is provided in the Niagara Mohawk l

Power Corporation response to the Construction. Appraisal Team (CAT) Audit, dated May 4, 1984, alleged violation B, page B-14.

Specifically, Reactor Controls Incorporated Quality Assurance Instructions (QAI) 8-2, 8-3, and 10-1

'have been revised to provide detailed instructions for installation activitics l

and inspection requirements. Seven Quality Control personnel and installation supervisors have been trained to these revised procedures to help assure that inspections are adequately performed and training has been provided to supervisory personnel to help assure a thorough understanding of acceptance requirements.

i

$ M[o$b o g

PDR

Mr. R. W. Starostecki Page 2 The following is submitted in response to your letter dated April 16, 1984 concerning the deviation identified in Inspection Report No. 50-410/83-16.

In accordance with the resolution reached in a telephone conversation among Mr. R; Gramm (NRC Resident Inspector) and Mr. T. Loomis (Niagara Mohawk Nuclear Licensing), this item will be discussed during a June 5-7, 1984 meeting in the Stone & Webster Cherry Hill Operations Center between Niagara Mohawk, General Electric and the Nuclear Regulatory Commission Mechanical Engineering Branch personnel.

Very truly yours, C. V. Man Vice President Nuclear Engineering & Licensing xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R._A. Gramm, Resident Inspector 1