Docket No.: 50-410 APR 18 bogey t
APPLICANT:
Niagara Mohawk Power Corporation (NMPC)
FACILITY:
Nine Mile Point, Unit 2
SUBJECT:
SUMMARY
OF MEETING LIITH NMPC ON EQUALITY ASSURANCE On January 20, 1984, the NRC staff met with representatives from Niagara Mohawk Power Corporation in Bethesda, Maryland, to discuss Quality Assur-ance issues for Nine Mile Point 2.
During this meeting the requests for additional information in the area of guality Assurance (transmitted in a letter to Gerald K. Rhode from A. Schwencer, August 12, 1983) were discussed.
Attachment 1 describes the actions to be taken as a result of the discussion.
During the meeting the NRC staff noted that NMPC gA management responsive-ness to recent NRC inspections in the construction area would be considered by the staff when reviewing the operational gA program.
NMPC responded that gA organizational changes were already being considered as a result of the recent inspections.
Attachment 2 contains a list of meeting attendees.
original signed by Mary F. Haughey, Project Manager Licensing Branch No.
2 Division of Licensing Attachments:
As stated LB¹2:D~L LB¹
- DL MHaughey:kab ASchwencer 04//g /84 04/
/84 DISTRIBUTION:
Document Control~
NRC PDR L
MHaughey BBordenick, OELD JMilhoan Jtl Gi 1 ray
- GNapuda, RI EHylton I
il, 840 QCK 05000g10 5020350 840416 PDR A
C q Jl f ~ I
't 0
'I 3
Attachment 1
Re vest for Additional informatii:on Action 260'43 260.4 260.5 "Stop Work" Policy, FSAR Section 17.1.10.2.1, NHPC to clarify section to show extent of stop work authority vested in gA (revise to include "also" ).
Incorporate response into Chapter 17 Item b was not included in response and needs to be addressed 260.7 260.8 260.10 and 260.11 260.13 260.20 260.26 Remained open Additional review to be performed by NRC staff FSAR Section 17.1.5.2 guality Activities is to be revised to delete "of plant modifications to ensure continui ng conformance to 10 CFR 50.55(a) and gA procedures to assure performance"
'in the 3rd paragraph
Response
should includ "inspectors" Administrative Procedures should provide for the necessary training of plant personnel to assure they are made aware of the procedural changes resulting from design changes Should be revised to delete reference to codes and standards 260.27, 28, 29, 30, 35, 37, 40, 41, 46, and 47 260.43 Respose should be incorporated into Chapter 17 of the FSAR FSAR Section 17.1.12.1 appears contradictory as written 260.44 NHPC to include information on shelf life
P
\\
Attachment' NHP -
2 HEETING January 20,.1984 NAHE Hary F.
Haughey Norm L. Rademacher David R.
Palmer Hichael D. Jones Jim Hilhoan John W. Gilray G.
Napuda ORGANIZATION NRC NHPC NHPC NHPC NRC NRC RI; NRC
Hine Hile Point 2 Hr. Gerald K. Rhode Senior Yice President Niagara Hohawk Po~er Corporation 300 Erie Boulevard West
- Syracuse, Hew York 13202 CC:
Hr. Troy B. Conner, Jr.,
Esq.
'Conner 5 Retterhahn Suite 1050 1747 Pennsylvania
- Avenue, H.M.
l'ashington, D. C.
20006 Mr. Richard Goldsmith Syracuse Uni versi ty College of Law E. I.
4'hi te Hall.Campus
- Syracuse, Hew York 13210 Nr. Jay Dunkleberger, Director Technological Developm nt Programs, Hew York State Energy Office Agency Building 2 Empire State Plaza
- Albany, Hew York 12223 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau Hew York State Departm nt of Law 2 Mori'd Trade Center Hew York, Hew York 10047 Resident Inspector Nine Nile Point Nuclear Po~er Station P. 0.
Box 99
- Lycoming, Hew York 13093 Hr. John M. Keib, Esq.
Niagara Hohawk Power Corporation 300 Erie Boulevard Rest
- Syracuse, Hew York 13202 Jay H. Gutierrez, Esq.
U. S. Nuclear'egulatory Cormission Region I
631 Park Avenue King of Prussia, Pennsylvania 19406
4