ML20092F550

From kanterella
Jump to navigation Jump to search
Suppls Response to NRC Re Violations Noted in IE Insp Repts 50-321/84-05 & 50-366/84-05.Corrective Actions: Further Review of QC Insp Records Will Be Performed to Determine Adequacy of Insp
ML20092F550
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/14/1984
From: Gucwa L
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20092F529 List:
References
NUDOCS 8406230498
Download: ML20092F550 (1)


Text

_ _ - - _ _ _ _ _ _ _ ________ _ _ _ _ _ _ _ _ -

. Ceorgia Power Cornpany 333 Piedrnont Avenue Atlanta. Georg>a 30308 Telephore 404 5266526

. Ma:kng Address:-

Post Office Box 4545 Atlanta, Georgia 30302 h IS Af0 : 0 5 Georgia Power L T. Gucwa the southem electrc system Manager Nuclear Engneenng and Ch!ef Nuclear Eng neer NED-84-260 May 14, 1984 U. S. Nuclear Regulatory Canunission REFEREICE:

Office of Inspection and Enforcenent RII: HCD Region II - Suite 2900 50-321/50-366 101 Marietta Street, W Inspection Report Atlanta, Georgia 30303 84-05 ATfENTION: Mr. James P. O'Reilly GENTLDEN:

Georgia Power Conpany's April 16, 1984 letter provided a response to Inspection Report 84-05, which identified Violation Item 321/84-05-01 and 366/84-05-01, Inadequate Inspection of Masonry Wall Modifications.

Mr. J. T. Ienahan of your staff has informed us that additional corrective action is necessary to resolve the -Violation Item. Confirming the discussion with Mr. Ienahan on April 30, 1984, further review of QC inspection records will be performed to determine the adequacy of the j inspections. 'Ibe re sults of the investigation will be transmitted by July 29, 1984.

Please contact this office if there are any questions.

Very truly yours, hI w L. T. Gucwa JH/mb xc: J. T. Beckham, Jr.

H. C. Nix, Jr. i

. Senior Resident Inspector 8406230498 840604 PDR ADOCK 05000321 0 PDR