ML20092F550
| ML20092F550 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/14/1984 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20092F529 | List: |
| References | |
| NUDOCS 8406230498 | |
| Download: ML20092F550 (1) | |
Text
_ _ - - _ _ _ _ _ _
Ceorgia Power Cornpany 333 Piedrnont Avenue Atlanta. Georg>a 30308 Telephore 404 5266526
. Ma:kng Address:-
Post Office Box 4545 Atlanta, Georgia 30302 h
IS Af0 : 0 5 Georgia Power L T. Gucwa the southem electrc system Manager Nuclear Engneenng and Ch!ef Nuclear Eng neer NED-84-260 May 14, 1984 U. S. Nuclear Regulatory Canunission REFEREICE:
Office of Inspection and Enforcenent RII: HCD Region II - Suite 2900 50-321/50-366 101 Marietta Street, W Inspection Report Atlanta, Georgia 30303 84-05 ATfENTION: Mr. James P. O'Reilly GENTLDEN:
Georgia Power Conpany's April 16, 1984 letter provided a response to Inspection Report 84-05, which identified Violation Item 321/84-05-01 and 366/84-05-01, Inadequate Inspection of Masonry Wall Modifications.
Mr.
J.
T.
Ienahan of your staff has informed us that additional corrective action is necessary to resolve the -Violation Item.
Confirming the discussion with Mr. Ienahan on April 30, 1984, further review of QC inspection records will be performed to determine the adequacy of the j
inspections.
'Ibe re sults of the investigation will be transmitted by July 29, 1984.
Please contact this office if there are any questions.
Very truly yours, hI w
L. T. Gucwa JH/mb xc:
J. T. Beckham, Jr.
H. C. Nix, Jr.
i
. Senior Resident Inspector 8406230498 840604 PDR ADOCK 05000321 0