Forwards Revised Page VI-2 of Dec 1991 Monthly Operating Rept for Vogtle Electric Generating Plant Unit 1
ML20092F021
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/31/1991
From: Hooper G
GEORGIA POWER CO.
To:
Shared Package
ML20092E975 List:
References
NUDOCS 9202190053
Download: ML20092F021 (2)


Text

-..

1 d

4 4

ENCLOSURE 5 I

V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR DECEMBER 1991 TABLE OF CONTENTS i

-OPERATING DATA REPORT

-Page VI-2 I

k' J

i 5

Y.

i t

1 i

4 1

+

0 9202190053 920213 PDR-ADOCK 05000424 R

PDR

.E E

.:.- s,

.~-

M OPERATING DATA REPORT DOCKET NO. 50-424 DATE:

FEBRUARY 5,1992 COMPLEWD BY: G. L HOOPER TELEPHONE:

(404) 826 -4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 1

2. REPORT PERIOD:

DECEMBER 1991

3. UCENSED THERMAL POWER (MWt):

3411

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRCAL RATING (NET MWe):

1101

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1154

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):

1100 8,IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION,IF ANY:

N/A THIS MONTH YR,TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744 8760 40201

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

744.0 7180.4 33638.9

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-UNE:

744.0 7016.7 32771.0

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

2466013 23393775 108587386

17. GROSS ELEC ENERGY GENERATED (MWH):

842152 7875583 36170033

18. NET ELEC. ENERGY GENERATED (MWH):

805602 7495523 34257433

19. REACTOR SERVICE FACTOR 100.0 %

- 82.0%

83.7%

20. REACTOR AVAILABluTY FACTOR 100.0 %

82.0%

83.7 %

21. UNIT SERVICE FACTOR:

100.0 % -

80,1 %

81.5 %

u l

22. UNIT AVAILABILITY FACTOR:

100.0 %.

80.1 % i 81.5 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

98.4% -

77.8% -

- 78.6%

24. UNIT CAPACITY FACTOR (USING DER NET):

98.3 %

77.7 %

77.4 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

7.1%

26. SHUTDOWNS SCHEDULED OVERTHE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A s

I ly

~

V1-2 I