V0GTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR DECEMBER 1991 TABLE OF CONTENTS i
-OPERATING DATA REPORT
-Page VI-2 I
k' J
i 5
Y.
i t
1 i
4 1
+
0 9202190053 920213 PDR-ADOCK 05000424 R
.E E
.:.- s,
.~-
M OPERATING DATA REPORT DOCKET NO. 50-424 DATE:
FEBRUARY 5,1992 COMPLEWD BY: G. L HOOPER TELEPHONE:
(404) 826 -4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
DECEMBER 1991
- 3. UCENSED THERMAL POWER (MWt):
3411
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRCAL RATING (NET MWe):
1101
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1154
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1100 8,IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY:
N/A THIS MONTH YR,TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744 8760 40201
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 7180.4 33638.9
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-UNE:
744.0 7016.7 32771.0
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2466013 23393775 108587386
- 17. GROSS ELEC ENERGY GENERATED (MWH):
842152 7875583 36170033
- 18. NET ELEC. ENERGY GENERATED (MWH):
805602 7495523 34257433
- 19. REACTOR SERVICE FACTOR 100.0 %
- 82.0%
83.7%
- 20. REACTOR AVAILABluTY FACTOR 100.0 %
82.0%
83.7 %
- 21. UNIT SERVICE FACTOR:
100.0 % -
80,1 %
81.5 %
u l
- 22. UNIT AVAILABILITY FACTOR:
100.0 %.
80.1 % i 81.5 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
98.4% -
77.8% -
- 78.6%
- 24. UNIT CAPACITY FACTOR (USING DER NET):
98.3 %
77.7 %
77.4 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.0%
7.1%
- 26. SHUTDOWNS SCHEDULED OVERTHE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A s
I ly
~
V1-2 I