ML20092F011

From kanterella
Jump to navigation Jump to search
Forwards Revised Page VI-2 of Nov 1991 Monthly Operating Rept for Vogtle Electric Generating Plant Unit 1
ML20092F011
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/30/1991
From: Hooper G
GEORGIA POWER CO.
To:
Shared Package
ML20092E975 List:
References
NUDOCS 9202190048
Download: ML20092F011 (2)


Text

._. - _. _ _ _ _ . . _ _ . . _ _

1 5

i.

.i .

e ENCLOSURE 4-V0GTLE-ELECTRIC GENERATING PLANT - UNIT 1 4- MONTHLY OPERATING REPORT FOR NOVEMBER 1991 t.

i TABLE OF CONTENTS OPERATING DATA REPORT Page VI-2 i

k~

4 4

I i

+ -

1.

j 1

o I

i i

a e

S 9202190048 920213 i-' PDR ADOCK,05000424-

.R. ,

PDR

OPERATING DATA REPORT DOCKET NO. 50-424 DATE: FEBRUARY 5,1992 COMPLETED BY: G. L. HOOPER TELEPHONE: (404) 826-4104 OPERATING STATUS

1. UNIT NAME: VEGP UNIT 1
2. REPORT PERIOD; NOVEMBER 1991
3. UCENSED THERMAL POWER (MWI): 3411
4. NAMEPLATE RATING (GROSS MWe): 1215
5. DESIGN ELECTRICAL RATING (NET MWe): 1101
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1154
7. MAXIMUM DEPENDABE CAPACITY (NET MWe): 1100
8. IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER WVEL TO WHICH RESTRICTED,IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR.TO DATE CUMULATIVE '
11. HOURS IN REPORTING PERIOD: 720 8016 39457
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 268.8 6436.4 32894.9
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON-UNE: 105.1 6272.7 32027.0
15. UNIT RESER\E SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH): 215953 20927762 106121373
17. GROSS ELEC ENERGY GENERATED (MWH): 54541 7033431 35327881
18. NET EEC. ENERGY GENERATED (MWH): 32061 6689921 33451831
19. REACTOR SERVICE FACTOR 37.3 % 80.3  % 83.4 %
20. REACTOR AVAILABILITY FACTOR 37.3 % B0.3% 83.4 %
21. UNIT SERVICE FACTOR: 14.6 % 78.3% 81.2 %
22. UNIT AVAILABluTY FACTOR: 14.6 % 78.3% 81.2 %
23. UNIT CAPACITY FACTOR (USING MDC NET): 4.0% 75.9 % 78.2%
24. UNIT CAPACITY FACTOR (USING DER NET): 4.0% 75.8% 77.0 %
25. UNIT FORCED OUTAGE RATE: 0.0% 0.0% 7.3%
26. SHUTDOWNS SCHEDUED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. lF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A V1-2