._. - _. _ _

1 5

i.

.i.

e ENCLOSURE 4-V0GTLE-ELECTRIC GENERATING PLANT - UNIT 1 4-MONTHLY OPERATING REPORT FOR NOVEMBER 1991 t.

i TABLE OF CONTENTS OPERATING DATA REPORT Page VI-2 i

k~

4 4

I i

+ -

1.

j 1

o I

i i

a e

S 9202190048 920213 i-'

PDR ADOCK,05000424-

.R.

PDR

OPERATING DATA REPORT DOCKET NO. 50-424 DATE:

FEBRUARY 5,1992 COMPLETED BY: G. L. HOOPER TELEPHONE:

(404) 826-4104 OPERATING STATUS

1. UNIT NAME:

VEGP UNIT 1

2. REPORT PERIOD; NOVEMBER 1991
3. UCENSED THERMAL POWER (MWI):

3411

4. NAMEPLATE RATING (GROSS MWe):

1215

5. DESIGN ELECTRICAL RATING (NET MWe):

1101

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

1154

7. MAXIMUM DEPENDABE CAPACITY (NET MWe):

1100

8. IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER WVEL TO WHICH RESTRICTED,IF ANY (NET MWe):

NO RESTRICTIONS

10. REASONS FOR RESTRICTION, IF ANY:

N/A THIS MONTH YR.TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720 8016 39457

12. NUMBER OF HOURS REACTOR WAS CRITICAL:

268.8 6436.4 32894.9

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR ON-UNE:

105.1 6272.7 32027.0

15. UNIT RESER\\E SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MWH):

215953 20927762 106121373

17. GROSS ELEC ENERGY GENERATED (MWH):

54541 7033431 35327881

18. NET EEC. ENERGY GENERATED (MWH):

32061 6689921 33451831

19. REACTOR SERVICE FACTOR 37.3 %

80.3 %

83.4 %

20. REACTOR AVAILABILITY FACTOR 37.3 %

B0.3%

83.4 %

21. UNIT SERVICE FACTOR:

14.6 %

78.3%

81.2 %

22. UNIT AVAILABluTY FACTOR:

14.6 %

78.3%

81.2 %

23. UNIT CAPACITY FACTOR (USING MDC NET):

4.0%

75.9 %

78.2%

24. UNIT CAPACITY FACTOR (USING DER NET):

4.0%

75.8%

77.0 %

25. UNIT FORCED OUTAGE RATE:

0.0%

0.0%

7.3%

26. SHUTDOWNS SCHEDUED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

27. lF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A V1-2