Text
.
,~
o.
l
=
OPERATING DATA REPORT DOCKET NO. 50-301 l
l DATE: January 6, 1992 COMPLETED BY:
D. C. Peterson 2"O G TELEPHONE 414/755-2321, Ext. 361 PJ OPERATING STATUS gg Og
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES
- 2. REPORTING PERIOD: DECEMBER 1991
- 3. LICENSED THERMAL POWER (MNT):
1518.5
- 4. NAMEPLATE RATING (GROSS MNE):
523.8 Q
- 5. DESIGN ELECTRICAL RATING (NET MNE):
497.
5 0.-
- 6. MAEIMUM DEPENDABLE CAPACITY (GROSS MNE):
509.
khO
- 7. MAEIMUM DEPENDABLE CAPACITY (NET MNE):
485.
S.'IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO NHICH RESTRICTED, IF ANT (NET MWE): NOT APPLICABLE
- 20. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8,760 170,209
- 12. NUMBER OF WOURS REACIOR NAS CRITICAL 733.0 7,645.2 148,729.8
- 13. REACTOR RESERVE SMUTDOWN HOURS 0.0 0.0 216.7
- 14. HOURS GENERATOR ON LINE 726.4 7,570.1 146,489.5
{
- 15. UNIT RESERVE SHUTDOWN NOURS 0.0 0.0 302.2
- 16. GROSS THERNAL ENERGY GENERATED (MNH) 1,064,971 11,302,748 209,467,157
- 17. GRDSS. ELECTRICAL ENERGY GENERATED (MNH) 362,530 3,862,120 71,159,380
- 18. NET ELBCTRICAL ENERGY GENERATED (NNH) 346,784 3,687,712 67,819,778
- 19. UNIT SERVICE FACTOR 97.6 86.4 86.1
- 20. UNIT AVAIIABILITY PACTOR 97.6 86.4 86.2
- 21. UNIT CAPACITY FACTOR (USING 3GC NET) 96.1 86.8 81.5
- 22. UNIT CAPACITY PACTOR (USING DER NET) 93.8 84.7 80.2
- 23. UNIT FORCED OUTAGE RATE O.O O.4 1.1
- 24. SEUTDONWS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, AND DURATIOtt OF EACE):
NONE l'
- 25. IF SHUTDOWN AT END OF REPORT PERICO, ESTIMATED DATE OF STARTUP: NOT SHUTDONE DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DA*tD SEPTEMBER 22, 1977 L
I
~-
~ ' ' ' ' ~
L __.
./ '
~
OPERATING DATA REPORT DOCKET NO. 50-266 DATE: February 5, 1992 COMPLETED BY:
D. C. Peterson TELEPHONE 414/755-2321, Ext. 361 OPERATING STATUS
- 1. UNIT MAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES
- 2. REPORTING PERIOD:
JANUARY 1992
- 3. LICENSED THERMAL POWER (MNT): 1518.5
- 4. NAMEPLATE RATING (CROSS MWE):
523.8 l
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.
- 6. MAEIMUM DEFENDABLE CAPACITY (GROSS MWE):
509.
- 7. MAEIMUM DEPENDABLE CAPACITY (NET MWE):
485.
- 8. IF CHANGES OCCUR IN CAPiEITT RATINGS (ITEMS NUMBER 3 THPOUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 11. HOURS IN REPORTING PERIOD 744 744 186,168
- 12. NUMBZR OF HOURS REACTOR WAS CRITICAL 744.0 744.0 154,134.5
- 13. REACTOR RESERVE SHUTDOWN HOURS O.0 0.0 652.7
- 14. HOURS GENERATOR ON LINE 744.0 744.0 151,172.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. CROSS THERMAL ENERGY GENERATED (MWH) 1,126,601 1,126,601 211,776,604
- 17. GROSS EIMICAL ENERGY GENERATED (MWH) 381,760 381,760 71,485,490
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 365,928 365,928 68,115,701
- 19. UNIT SERVICE FACTOR 100.0 100.0 81.2
- 20. UNIT AVAILABILITY FACIOR 100.0 100.0 81.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.4 101.4 75.1
- 22. UNIT C'.P.".CITT TA wn (USING DEM NET) 99.0 99.0 73.6
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 1.7
- 24. SHUTDOWNS SCHEDU'ED OVER NEET 6 MONTHS (TYPE, DATE, AND DUFJLTION OF EACH) 2 Unit l' refueling and maintenance shutdown scheduled for April 10, 1992 to May 22, 1992: 42 days.
SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN MRTED AND FACTORS CALCULATED AS REque.a Ar.u IN NRC LETTER DATED SEPTEMBER 22, 1977
POINT BEACH NUCLEAR rLAST DOCKET NO.
50-266 AVERAGE DATLY UNIT POWER LEVEL UNTT NAME Point Beadt Unit 1 MONTH JANUARY - 1902 DATE rd, w v5_1902 COMPLETED BY D.C.Pemson TELEPHONE 414 M S m i
AVERAGE AVERAGE A%TRAGE DAILY DAILY DAILY l
rowEn tuvEL rower LEVEL rowEntzvEL DAY MWe NET DAY MWe NET DAY MWe SET i
I 493 11 404 21 494 2
494 12 473 22 494 3
493 13 493 23 403 4
492 14 492 24 404 5
457 15 492 25 404
)
6 491 16 403 26 473 7
491 17 492 27 491 8
493 IS 492 28 403 9
495 19 402 29 425 10 491 20 491 30 495 31 405 rarar2sa (DW)
POINT BEACTI NUCLEAR PLANT Docitet No.
Sry_:tw Unit Name Peint Beadt Unit 1 UNIT SIIUTDOWNS AND IDER REDUCTIONS Date Februarv 5. F?2 -
~
Completed By D. C. Petersen REPORT MONTII JANUARY - IW2 Telephone No.
414/755-232L En. 361.
Mettwd of Sh="m8 Na Date Type' Duratum Reastm 1A=n tremee TW
.W Cause and Cemet ve Action 2
i l
l I
l
-I 2
' Method:
- Exhht G - Instructions
'F: Forced Reason.
L 5: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C-Refueling 3 - Automatic Scram LER file (NUREG4161)
D - Regulatory Restriction 4 - Continuation of l
E - Operator Training &
Previous Shut &mn Ucensing Exam -
5 - Reduced load F-Administrative 6 - Other (explain)
' Exhibit I - Same Source l
l G - Operational Error (explain)
II - Other (explain) l PfW402Rt>
103 W t_
?
r DOCKET NO.
50-266 UNIT HAME Point Beach Unit 1 DATE February 5, 1992 COMPLETED BY D.
C.
Peterson TELEPHoHE 414/755-2321, Ext. 361 Unit 1 operated at approximately 492 MWe net throughout this report period with no significant load reductions.
Unit i experienced two reportable events in accordance with 10 CFR 50.73:
LER 92-001, Unit 1 turbine runback caused by installing control fuse jumper in the wrong breaker cabinet and 92-002, reactor vessel visual inspection not performed.
Safety-related maintenance included the followings replaced broken fusible link lower air deflector on fire barrier; replaced valve stem, plug and cago on the excess letdown heat exchanger shell side outict; and inutalled new bearings and replaced seal on the "D" component cooling water pump.
g OPERATIIIG DATA REPORT DOCKET 300. 50-301 DATE: February 5, 1992 1
1 i
COMPLETED BY:
D. C. Peterson TELEP90M 414/755-2321, Ext. 361 OPERATING STATUS
- 1. UIIIT NAIE:. FOINT BEACE IIUCLEAR FIAllT UNIT 2
. ISOFES
- 2. REPOftTING PERIOD: i JAIBUMtf 1992
- 3. LICEIISED T MINIEL PO MR (MNT): 1518.5
- 4. mAIIEFLATE MATING. (enoSS nub):
"523.8
- 5. DESIGII ELECTRICRL' RhTIWS (MT 3W15):
497.
i 6.. EthEIHUBE DEFmarm MPACITY (GROSS 385):
509.
- 7. MhEIHUN DEPEImh3E2 CRFACITY (IIET 335):
485.
- 8. IF CEMIGES OCCUR IN ChrhCITY RATINGS (ITERIS IM 3 THROUGH 7) SINCE IAST ItEPORT, GIYg momensmeg IIOT AFFLICASE2
- 9. POIIER I2 VEL TO WIIIM DESTRICTED, IF. AIIT (IRT IEEE):.ISOT APPLICABLE
- 10. memenang yon ngSTRICTICIIS, ' (IF AIIY):..IIOT APPLIchELE
'THIS MOIITH TR TO DATE CUIIUEATIVE
- 11. NOURS IN BEFORTIIIG PERIOD-744 744 170,953 12.. IIGIMER OF MDURS REAC3OR IIES CRITICAL 744.0 744.0 149,473.8 13.- REACTUR RESEIETE sWUTDomi IBOUIIS 0.0 0.0 216.7
'744.0 147,233.5 l.
- 15. UBIIT RESEUITE SIIUTDOISI IIDURS 0.0..
0.0 302.2
- 16. GIIOSS TIBIWIhL EIIEEIGT eEIBIIATED (MINI) 1,127,958 1,127,958 210,595,115
- 17. enOSS ELECTRIchL ENERGY GENERATED (BWIH) -
357,730.
387,730 71,547,110
- 18. NET EEECTRICAL EIERGY GENEftATED (38085) 371,749 371,749 68,191,527
- 19. DIBIT.SEIIVICE FACTOR 100.0 100.0 86.1
' 20. UNIT AVAIIABILITY FACTOR 100.0 100.0 86.3 21..UIIIT ChrACITY FAC5OR (USIIIG Isc NET)
-103.0 103.0 81.6
~ 22. UIIIT CAPACITY FACTOR.(USIIIG DER NET) 100.5 100.5 80.3 23..UIIIT FORCED OUTAGE RATE O.0 0.0 1.1
- 24. SHUTDOINBS SCHEDUI2D OVER NEIT 6.MOIITHS (TYPE,JDATE, AND DURATION OF EACH):
IIOISE
- 25. IF'.SHUTDOINE AT'EIID OF REPORT PERIOO, ESTIMATED DATE OF STARTUP ISOY SHUTDOIIN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED: IN IIRC LETTER DATED SEPTEMBER 22,.1977
o
~,
POINT BEACII NUCLEAR FI_ ANT DOCKET NO.
50-301 AVERAGE DAILY UNIT PtDVER LEVEL UNTT NAME Point Beacit Unit 2 MONTII JANUARY - IW2 -_
DATE rd,sv5.tw2 COMPLETED BY D. C. Peterson TELEfHONE 414/NS-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET _
DAY MWe NET DAY MWe NET 1
501 11 MS 21 501 2
501 12 493 22 501 3
500 13 500 23 90 24 500 4
500 14 50rs 5
500 15 496 25 500 6
499 16 500 26 431 7
500 17 500 27 498 8'
501 18' 499 23 4W 9
505 19 500 29 MI 10 4%
20 499 30 500 31 M1 PDF-0028a (03-90)
,- ~,
POINT BEACli NUCLEAR PLANT Docket No.
50-301 4
Unit Name Point BerJt Unit 2 UNIT Sl!UTDOWNS AND POWER REDUCTIONS Date Februarv 5.1*C
- Completed By D. C Peterson REPORT MONT11 JANUARY-1972 Telephone No_
414/755-232L Ett. 36L Methed c(
Shutt +pg No.
Date "
Type' Duration Remsca gy,,
g,rensee Bent System Coreponent Cause end Cornetwe Action r
fhrs)
L m' +'
Ru- - No.
Cd' Crv3e' To Pm Recumace l
l
'F: Forced
' Reason:
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load F-Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain)
PDF4r8b (0190)
_