ML20092D837
Jump to navigation
Jump to search
| ML20092D837 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/31/1991 |
| From: | WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20092D829 | List: |
| References | |
| NUDOCS 9202140304 | |
| Download: ML20092D837 (1) | |
Text
_
.l'*
.i DOCKET HO.
50-301 UNIT HAME Point Beach Unit 2 DATE February 5, 1992 COMPLETED BY D. C. Peterson TELEPHONE 414/755-2321, Ext. 361 Unit 2 operated at approximately 500 MWo not throughout this report period with no significant load reductions.
Safoty-related maintenance included the followings replaced the firing logic in the supply breaker for the "c" charging pump and tightened fittings to repair leaks on two containment electrical penetrations.
fjj2140304920210 i
R ADOCK 05000266 PDR