Osmmonwealth 12}ivin C.ompan)
Hraidwoud (,cnerating Statuen Route 01. Ilox H I tirates ille, II. m 407-%19 Trl HikiW2tu)1 September 8,1995 DW/95-0088 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen.
Encic:ed for your information is the Monthly Performance Report covering Braidwood Nuclear Generating Station for the period August 1,1995 through August 31,1995.
T. J. Tulon Station Manager Braidwood Nuclear Station TJT/CP/dia oAcorresp\\zesteno\\bwdletrs. doc Attachments cc:
J. B. Martin, U.S.N.R.C., Region til R. R. Assa, U.S.N.R.C.
l.D.N.S.
U.S.N.R.C. Resident inspector, Braidwood INPO Records Center D. L. Farrar, Nuclear Regional Service Mgr.
D. M. Saccomando, Nuclear Licensing Admin.
D. R. Eggett, Nuclear Engineering Dept.
K. Kaup, Site Vice President, Braidwood NFS, PWR Plant Support P. L. Habel, Unit 1 Operating Engineer J. P. Kuchenbecker, Unit 2 Operating Engineer I.D.N.S. Resident inspector, Braidwood J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.
I
.ra,
[
i 9509240003 950831 PDR ADOCK 05000456 L 'd A.
- -._. P D R _
A link om oimpany
BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 i
i 4
4 i
i I
r
}
A'.
OPERATING DATA REPORT Docket No: 50 - 456 Unit: Braidwood 1 Date: 09/05/1995 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: August 1995 Gross Hours: ZM
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (if Any):
None
- 4) Reasons for restrictions (If Any):
None This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
744.0 5,831.0 62,144.0
- 6) Hours Reactor Critical:
744.0 5,133.0 49,731.8
- 7) RX Reserve Shutdown Hours:
.0
.0
.0
- 8) Hou.~s Generator on Line:
744.0 5,090.5 49,056.3
- 9) Unit Reserve Shutdown Hours:
.0
.0
.0
- 10) Gross Thermal Energy (MWHt):
2,523,717.0 16,896,293.1 156,859,307.8
- 11) Gross Elect. Energy (MWH):
856,951.0 5,818,433.0 52,322,252.0
- 12) Net Elect. Energy (MWH):
825,520.0 5,596,196.0 50,129,016.0
- 13) Reactor Service Factor:
100.0 88.0 80.0
- 14) Reactor Availability Factor:
100.0 88.0 80.0
- 15) Unit Service Factor:
100.0 87.3 78.9
- 16) Unit Availability Factor:
100.0 87.3 78.9
- 17) Unit Capacity Factor (MDC NET):
99.1 85.7 72.0
- 18) Unit Capacity Factor (DER NET):
99.1 85.7 72.0
- 19) Unit Forced Outage Rate:
0.0 3.5 7.9
- 20) Unit Forced Outage Hours:
0.0 184.0 4214.5
- 21) Shutdown Schedule Over Next 6 Months:
Refuel Outage 9/30/1995
- 22) If Shutdown at End of Reporting Period, Estimated Date of Startup:
s
- 5. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 09/05/1995 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: August 1995 Ray MWe-net Q.a_y MWe-net a
a 1) 1107 16) 1111 2) 1111 17) 1111 3) 1115 18) 1110 4) 1104 19) 1107 5) 1030 20) 1109 6) 1108 21) 1111 7) 1112 22) 1111 8) 1117 23) 1114 9) 1119 24) 1113 10) 1118 25) 1113 11) 1115 26) 1112 12) 1113 27) 1109 13) 1111 28) 1110 14) 1112 29) 1111 15) 1112 30) 1111 31) 1115 i
- Due to condenser efficiency 1
i e
~.
C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit: Braidwood 1 -
Date: 09/05/95 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD:
August 1995 LER Cause & Corrective Action Nf; Date Type Hours Reason Method Number System Component to Prevent Recurrence N/A
- "2UMMARY"*
Unit 1 entered the month of August 1995 with 100% capability. The unit operated routinely for the entire month.
TYPE REASON METHOD SYSTEM & COMPONENT F.- Forced A -Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other
D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 09/05/95 Completed by: John Lewis Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event 8/22/95 PORV 1RY-455A 1 - Open signal Mode 1 While calibration testing was being calibration of the 'A' performed ott the 'A' temperature temperature loop loop, leads to pressurizer pressure channel 1PI-455A were reversed creating a false high pressure signal. PORV 1RY-455A operated as designed.
i
J i
A. OPERATING DATA REPORT Docket No: 50- 457 Unit: Braidwood 2 Date: 09/05/1995 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: August 1995 Gross Hours: 244 l
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
11.1 5 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (if Any):
None
- 4) Reasons for restrictions (if Any):
None This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
744.0 5,831.0 60,226.0
- 6) Hours Reactor Critical:
744.0 5,660.0 50,492.4
- 7) RX Reserve Shutdown Hours:
.0
.0
.0
- 8) Hours Generator ori Line:
744.0 5,654.8 50,097.1
- 9) Unit Reserve Shutdown Hours:
.0
.0
.0
- 10) Gross Thermal Energy (MWHt):
2,465,290.0 18,892,188.4 158,383,641.1
- 11) Gross Elect. Energy (MWH):
826,677.0 6,476,602.0 52,496,391.0
- 12) Net Elect. Energy (MWH):
795,885.0 6,243,464.0 50,346,194.0
- 13) Reactor Service Factor:
100.0 97.1 83.8
- 14) Reactor Availability Factor 100.0 97.1 83.8
- 15) Unit Service Factor 100.0 97.0 83.2
- 16) Unit Availability Factor:
100.0 97.0 83.2
- 17) Unit Capacity Factor (MDC NET):
95.5 95.6 74.6
- 18) Unit Capacity Factor (DER NET):
95.5 95.6 74.6
- 19) Unit Forced Outage Rate:
0.0 3.0 5.6
- 20) Unit Forced Outage Hours:
0.0 176.3 2947.6
- 21) Shutdown Schedule Over Next 6 Months: Refuel Outage 3/2/1996
- 22) If Shutdown at end of Reporting Period, Estimated Date of Startup.
I
l 4
II. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50- 457 Unit: Braidwood 2 Date: 09/05/1995 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: August 1995 j
4 Qay MWe-net Day MWe-net 1) 1094 16) 1098 2) 1098
- 17),
1098 3) 1100 18) 1098 4) 1102 19) 1055 5) 895 20) 1060 6) 496 21) 1099 7) 1098 22) 1101 I
8) 1101 23) 1092 l
9) 1105 24) 1106 10) 1104 25) 1105 l
11) 1101 26) 1084 12) 1099 27) 1015 13) 1097 28) 1101 14) 1098 29) 1102 15) 1098 30) 1102 31) 1105
- Due to condenser efficiency i
- m. _ _ _ -.. _ _ _ _ _ _ _. ___.__
C.
UN!T CHUTDOWNS/ REDUCTIONS Docket No.: 50 - 467 Unit: Braidwood 2 Date: 09/05/95 Completed by: Chris Pershey Telephone: 815-458-2801 REPOR1 PERIOD:
August 1995 LER Cause & Corrective Action
_N_o Date Type Hours Reason Method Number System Component to Prevent Recurrence 2
30 8-6-95 F
31.0 A
5 N/A SJ HCU Feedwater isolation Valve, 2FW-0098, valve actuator hydraulic pump failed. Load was reduced to replace then test the hydraulic pump and filter.
SUMMARY
Unit 2 entered the month of August 1995 at 100% capability. Load was reduced on 8-6-95 to replace a failed valve actuator hydraulic pump on the l
2FW-009B Feedwater Isolation Valve. The unit operated routinely the remainder of the month.
TYPE REASON METHOD SYSTEM & COMPONENT F.- Forced A -Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File
[
E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
I F - Administration G - Operator Error H. - Other
~ '~ ^
D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 - 467 Unit: Braidwood 2 Date: 09/05/95 Completed by: John Lewis Telephone: 815-458-2801 Date Ac ated A
a io Co d ion McMon of M None
- -