h

  • i *

) PRINCIPAL STAFI' 1 "4 Vag - ,f(f-DPRP STONE & WEBSTER MICHIGAN, INC. 3fu x A/Rt ORMSF P.O. Box 2325. BOSTON. M ASSACHUSETTS O2107 RC QRMA CS $3

?,^U aun . ., L NF FIleM#

United States Nuclear Regulatory Commission April 18, 1984 Midland Site Resident Office Route 7, J.O. No. 14358 Midland, Michigan Ref. MPF 82 Attention: Mr. Cook DOCKET No. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDENT ASSESSMENT OF UNDERPINNING REPORT NO. 82 A copy of the Independent Assessment of Underpinning Weekly Report No. 82 for the period of April 8,1984 through April 14, 1984 is enclosed with this letter. Included as attachments are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction, and Quality Assurance personnel.

If you have any questions with respect to this report please contact me at (617) 589-2067.

- - J e kS. '

cks A. Stanley eks Project Manager Enclosures -

ASL/pd 8406190312 840614 7'3 W %O PDR ADOCK 05000329 r , c?

O PDR ^

E L ,,

.'.' J.O. No. 14358

, Midland Plant 3 -Units 1 & 2 Independent Assessment of Underpinning Weekly Report No. 82 April 8, 1984 through April 14, 1984 Personnel on Site Stone & Webster Michigan, Inc.

P. Majeski 4/10 - 4/14 D. Benvie 4/9 - 4/14

. D. _Zito 4/9 - 4/13 L. Rouen ~4/8 - 4/10 W .' Kilker 4/8 - 4/10 S. Lucks 4/10 - 4/13 e Parsons Brinckerhoff Michigan, L7c.

J. Oliveira 4/10 - 4/14 B. Metros 4/8 - 4/10 Meetings Attended Date Represented Purpose 4/9 - 4/11 Stone & Webster Daily Assessment

-4/13 Bechtel Team Meeting Consumers Power -

Parsons 4/9 Consumers Power Project Soils Bechtel Meeting MPQAD Stone & Webster 4/12 NRC Monthly Meeting Consumers Power With NRC Stone & Webster 4/13 Stone & Webster Interorganizational Consumers Power Meeting Bechtel MPQAD

-Underpinning and Remedial Soils -' Construction Pier E17: Drifting to the pier has begdn. The drift heading is entirely in fill concrete.

Pier W17: Excavation, lagging installation, and backpacking have been completed for the drift.

Kc4 to Kc5 and Kc8 to Kc9 Drifts: Excavation of these drifts has begun.

Installation of drift sets is in progress.

. Piers E/W5: Drifting to these piers has begun.

Piers CT 1/12: Load transfer for both piers has begun. Routine rejacking is in progress.

b_

  • ~

t

.J.

. . _ 2 -

1 =e; D J.O. No. 14358 j 17 .1, l Midland Plant i o c.n 4

, ' Units 1 &.2;  !

q.- Independent Assessment of. Underpinning l

! .i g , Piers CT 3/10: j Excavation.of the drifts to these piers has been initiated.

+

& 'E/W8 Grillages: Jacking.to increase the reserve capacity load at each  !

grillage has been completed. The _ amount of loading at both grillages is.  ;

at 3160% of the specified load. Upward building movement measured for the-  !

east and west. grillages was 58 mils and 49 mils respectively at-the time

of load lock off.  !

1; .

t b  : Access Shaft' Level 1C Wales: ; Alignment and fitup of the level C wales  ;

continued for :the ' east and west access -shaft.

2SWPS: .! Installation of the; upper level wale is. in progress. Installation l p l of the struts for support of the soldier- pile wall has been completed  !

Jalong the. east side of the SWPS. j j- _

Assessment Team Observations - Construction .

L '

, load transfer for the.CT .1/12 piers was o'oserved by the Assessment Team. I j.- The_ successful and, timely completion of this activity is of primary - t

, importance in allowing work to progress into other areas of the Auxiliary _  !

4

-Building underpinning. In order to achieve.this goal, a concerted planning

_and coordination effort was exhibited by the Contractor. Key activities {

t requiring completion prior to the start of load. transfer were tracked on a j

. # ' chart board in the work area. Prior to the start of. Jacking, the underpinning i

subcontractor. reviewed the methodology of the jacking operations with the 4

? -  ! craftsmen, MPQAD and the field and resident engineers. h is review served *

.the purpose of ensuring a thorough understanding of the ' jacking operations k by alli. organizations involved. Increments and rate of loading conformed . l

.with procedural requirements. fJacking-loads were maintained at the required

~

F values until 3he acceptance criteria was met. Instrumentation data was. j read and. reduced expediently and accurately allowing constant evalual, ion' of  ;

building and, pier movement throughout the! jacking operations. Although.the  ;

1 amount of instrumentation data produced during the. jacking operation was ,

extensive and complex, the. data that the engineering personnel chose to - i concentrate on was in the opinion of the Assessment Team,. the most pertinent. -  ;

Absolute base movement for pier CT.1/12 was on the order of .1/8 inch at the- j time of lock offt This value of initial soil compression corresponds with j

' - that observed at most of the previous ~ pier installations. Ec Assessment Team  !

cencludes that procedural requirements were effectively implemented during.

~

~ initial load transfer.for piers'CT 1/12.  ;

~

i' he Assessment Team observedfinstallation of suppctt steel for the drift to 5 pier E17. Drift steel members were aligned in accordance with procedures.  !

. Bolts required for drift steel connections were torqued to the appropriate - i c tenaien.' - he Assessment Team concludes that the resulting installation  !

n

~ conformed:with procedural and design requirements.'

7 The ongoing work at the SWPS includes installation of struts and both surface '

mounted and embedded strut plates required for support of the soldier pile '

s Wall. - Welding of struts to the surface mounted strut. plates was observed by

'the Assamamant Team. -Surface preparation.of the plates and preheating complied ,

=with procedural requirements. Removal of slag and cleaning of the finished  ;

weld and adjacent base metal was satisfactory._ }

b -

r 1 a, , - . . , - . ~ , . . - , ,___,#- , _ _ _ _ _ ., - _ _ ,__ __. - - ,..,, .. u - _ _ _ _ _ . - ...

o . 3

'J.O. No. 14358

.- Midland Plant Units 1 & 2 Independent Assessment of Underpinning Installation of the mechanical anchor bolts to support a large embedded strut plate on the SWPS north wall was performed this week. Anchor bolts were torqued to the required design tension. The annular space around the anchor bolts was grouted within 5 days of tensioning as required by the procedures. Installation of grout tubes, location of the venting tubes and method of grout placement conformed with applicable procedures. During grouting for two of the anchor bolt holes some grout loss occurred while retracting the grout hose. The underpinning subcontractor thoroughly cleaned the anchor holes with air and water prior to regrouting these holes. The subsequent regrouting was accomplished successfully, completing a satisfactory installation for all the anchor bolts required for support of the embedded plate.

Assessment Team Observations - QA/QC The Assessment Team overviewed the results of an MPQAD revicw of their controlled document files. Based on the population size and the type of deficiencies found, the Assessment Team considers the deficiency rate noted in the review to be acceptable. The Assessment Team concludes that MPQAD is satisfactorily maintaining their controlled documents, particularly with respect to proper posting of attachmente.

Repair of the CT 12 base plate grout was required due to surface voids that resulted during initial grout placement. .A quick set grout was used to repair these surface voids. The Assessment Team witnessed mixing and preparation of the grout test specimens by the US Testing technician. The mixing and preparation of the specimens confonned with the requirements of the US Testing quality control procedures.

Work Activity Packages The following Work Activity Package (WAP) overviews are in the open response stage or have been completed during the past week.

WAP No. Title Status (Opened) (Closed) 83 Excavate, Install 4/10/84 and Backfill

-Electric Ductbank and Equipment Pad For HVAC Fans Nonconformance Identification Reports The following Nonconfonnance Reports (NIRs) remain open or have been closed during the week.

NIR No. Description Status (Opened) (Closed) 22 Resident 2/21/84 -

Engineering Document Control Stations

4 1 .

J.O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning NIR No. Description Status

} (0pened) (Closed) 24 Design Drawing 3/30/84 Review at UAT Workprint Station 25 Compressive Strength 3/30/84 Testing of Concrete Cylinders Open Items Items discussed during meetings are categorized as follows:

OPEN ITEM - An item for which an action is required, 'Ihe item will remain open until the required action has been taken. Tra. king is required.

CLOSED ITEM - An item, usually brought forward by the Assessment Team that is discussed andadeqJately responded to. No tracking is required.

INFORMATION ITEM - An item brought forward to provide general background information regarding work, such as work status or an upcoming design charge. No tracking is required.

OPINION ITEM - An opinion or suggestion given by the Assessment Team expressir~, an alternate construction or quality assurance technique. The opinion Jr rauaiestion is given as a possible alternate that may facilitate an operation.

CLOSES ITEM vX-XX - 'Ihis notation identifies an action that closes a previously ider..'ified open item. Tracking of the open item stops.

The following listing of all Open items from the Daily Meeting Notes with Bechtel and th: text of the Weekly Reports. Carry-over items from past weeks which have been Closed this week.are also listed.

Item No. Discription Closure 64-7 QAP Review Program Open 64-10 Trend Analysis Open 71-17 Computerized Civil Open Drawing Register 74-21 US Testing Corrective Open Ac cion 74-25 Exparaton Anchors 82-6 77-12 FCR Processing Task 82-12 .

Force

i e '

!' ., 5 i

,~ J.O. No. 14358-Midland Plant.

Units .1 & 2

' Independent Assessment of Underpinning Item No. Description Closure 79-26 Upper Leveling Plate Open 79-28 SWPS Backpacking Material Open L 79-34 SWPS Backpacking Placement Open 81-6 ~MPQAD Controlled Document 82-14 Review 81-8 MPQAD Welding Audit Open 81-21 BOP Construction Verification Open of Soils Work 81-25 Trend Analysis Update 82-9 81-34 Update on Welding NCRs 82-13 7

l 82-3 Surface Voids in Grout Open L 82-9 Trend Analysis Update Open

. kh v ., . e 05hkto '

e' k3h'bS Project Engineer Pf6 ject ttnager e

I f

I

L

. 'J:

. 1 Notes of Daily Mesting'

-; Independent Assessment of Underpinning Midland Plant,-Units 1 &-2 Consumers Power Company Held at Midland' Site Midland, Michigan" April 9, 1984-Present For :

1 Consumers Power Bechtel MPQAD Stone & Webster LG. .Murray J. Fisher J. McMaster W. Kilker R. hb eler J. Kelleher B. Lytle D. Benvie E. Cviki D. Zito L. Rouen '

Parsons Brinckerhoff B. Metros ,

~

. PURPOSE This meeting is held each day to discuss items regarding the Independent 1 Soils Assessment at the Midland Plant, Units 1 & 2.

~

DISCUSSION Status Items l Item 82 Auxiliary Building Underpinning Activities. ,

The(upperlevelingandstabilizer_platechavebeengroutedintoplacefor.

.yyrqCT1/12.

. Excavation of the drift to pier. E16 has begun. Presently the drift face is completely--in concrete.

. Installation of' drift steel is in progress f6r pier W17.

Jacking for reserve capacity loading has been completed for the E/W8 grillages. '

- The amount of loading at the east and _ west grillages is at 160 % and 159% of the specified load, respectively.

.-(INFORMATION ITEM)

New Items Item 82 Pier W17' Drift.

D. Benvie' asked why drifting to pier W17 has been discentinued. J. Fisher responded that there is only one work crew assigned _to the E/W17 piers. This crew will alternate between the E/W17 piers as detemined by FSO. (CLOSED'

s. ITEM)_

-Item 82-3 Surface'Voidsein Groun.

- D. Zito discussed the NCRs written after surface voids were observed in ,the grout for both the horizontal rockbolts at the control tower corners and the upper

-leveling plates for piers E/W16. The voids were surficial and did not .tffect the integrity of the~ reckbolts or the leveling plates. The Assessment Team asked if lorocedural and/or installation changes will be made to address this situation on future installP&.ons. J. Fisher will respond. (OPEN ITEM) h- _ . - _ _ _ _ _

g 1' t .

Not:s of. Daily Meeting

  • ', sInd: pendent Assessment of Underpinning -

. Midland Plant, Units 1 & 2

.Consumerr Power Company

,Heldat[MidlandSite Midland,. Michigan

= April 9, 1984

' Item 82 UAT Iateral Wellpoints.

'B. . Metros asked when operation of the UAT lateral wellpoints had resumed.

=The Contractor responded that the west UAT lateral wellpoints have been operating for the past week. The wellpoints are activated only on the day shift and, the quantity of flow has been approximately 400 gallons per -

day.- The east UAT: wellpoint have not been pumped. (CLOSED ITEM)

Item 82 Level C Wales.

.W. Kilker asked if NCRs that were written before the October 1983 Stop

~

Work Order will impact installation of the Level C wales in the vicinity

^~

- tor the turbine building. J. Kelleher responded that implementation of corrective action will be accomplished in conjunction.with the wale

-installation. No impact is anticipated. (CIDSED ITai)

Response Items

. Item 82 Expansion Anchors.

In response to an earlier Assessment Team concern regarding loose washers

.on Hilti bolts, J. Kelleher provided the Assessment Team with a copy of

. an FCR allowing the use of a quick set grout beneath Hilti bearing plates.

. The purpose of the grout type is to provide uniform bearing beneath the

' plate to alleviate the occurrence of point loading. Imsening of Hilti

washers.in the past has been attributed to the effects of point leading

-on the relatively: rough concrete surface on the bottom of existing foundations. The Assessment Team concurs that use of the rapid' set grout i

'will aid in reducing the possibility of washer loosening. (CLOSES ITEM 74-25) 4 b3 ~

n-

  • , . t

+.- 2-i  ! Notes.oflDailyMeeting i ..

Independent Assecament of Underpinning Midland Plant,-Units 1 &.2 s

Consumers Power Company. ,

Held at Midland Site -

' Midland, Michigan

. April-10,,1984-

~Present For:

Consumers Power Bechtel MPQAD Stone & Webster

G. Wrray . J.' . Fisher J. & Master W. Kilker J. Schaub-: J. Kelleher J. Meisenheimer D. Benvie

. E. Cvikl J. Moran D. Zito

, D. Morris- L. Rouen Parsons Brinckerhoff B. Metros

~

-PURPOSE

'Ihis meeting is held.each day to discuss items regarding the Independent

Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION t.

~~

Status Items

' Item 82 Auxiliary Building Activities.

Installation of the jackstand hardware for pier CT.1 has been~ completed.

Drift excavation and' drift support steel. installation continued for piers

E/W 17.

(INFORMATION ITEM) c' Item 82-8 -f NIR:24 Design' Drawing Review at UAT Workprint Station.

J. : Fisher' stated that the OAR response to NIR 24 addressing document

deficiencies at the-UAT workprint station will. be issued by FSO today.

~ ~

(NIR~24 remains OPEN)' (INFORMATION ITEM)

New Items No new items were discussed.

Response Items-Item 82 Trend Analysis Update.

J. Meisenheimer provided an update on the status of the MPQAD NCR trending

-program described in Item 64-10 and discussed in Item 81-25. As predicted'

in' Item 64-10, the new trend analysis system was initiated by the Balance of the' Plant MPQAD during the first quarter of 1984. However, the.MPQAD Soils group has identified problems in' incorporating certain of the particular

, -attributes evaluated for the undarpinning work into the new trending .

~

program. Mr. Meisenheimer stated a decision will be made within the next

~ week as to whether or not the revised trending system will be used for MPQAD Soils trending. If not, the existing trending evaluation will be continued.

In general, Mr. Meisenheimer feels quite satisfied with the present manual.

system in that the number of NCPa to be tracked is on the average of 3 per day.

S

a,; .. .

Nots;; of' Daily Mesting

.7 .

Ind:-pend:nt Assessment of Underpinning
Midland Plant, Units l'& 2

. Consumers Power Company Held at Midland Plant

. Midland, Michigan

- April.10,1984 qW.. Kilker stated the Assesqment Team will withhold comment until.the decision'is made next week on whether to use the new trending system.

L(Item 64-10 remains OPEN) . (CLOSES ITEM 81-25 ) (OPEN ITEM) a

. -x e

s=

4 n .

I[--

/.. .

[ Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2' Consumers Power Company Held at Midland Site Midland, Michigan April 11,.1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster J.' Schaub J. Fisher J. McMaster W. Kilker B, Wheeler J. Kelleher R. Sevo D. Benvie E. Cviki D. Zito D. Morris A. Lucks M. Blendy P. Majeski D. Lavelle Parsons Brinckerhoff J. Oliveira PURPOSE.

J- This meeting is held each day to discuss items regarding the Independent

-Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status-Items Item 82-10-- Auxiliary Building Underpinning Activities.

Imd transfer for piers CT1/12 is scheduled for tomorrow.

The soil cortion of the drift excavation for pier W17 has progressed to the

-reactor containment wall.

-(INFORMATION ITEM)

Item 82 US Testing Corrective Action.

J. Fisher stated that FSO has assumed responsibility for maintaining the US Testing controlled documents as of today. Submittal of all seven Quality Control procedures ~(QCPs) containing 46 work instructions should be completed by this weekend. Final issuance of the QCPs is scheduled shortly thereafter.

(Item 74-21 remains OPEN) (INFORMATION ITEM)

New Items No new items were discussed.

Response Items Item 82 FCR Processing Task Force. .,

M. Blendy discussed the, FCR Task Force report containing recomendations to improve the FCR response time. Assignment of a process criteria code to prioritize FCRs will be implemented by 4/15/84. A planning group has

. Notra'of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site Midland, Michigan April 11, 1984 been established to identify the .eed for and initiate FCRs at least one week prior to the scheduled work activity. Where lead time for a change .eeded for a particular work activity exceed 30 days, the Task Force has recommended that DCNs be used rather than FCRs. The Task Force has also recommended establishment of a committee to develop need criteria for development of an FCR, thereby eliminating many unnecessary FCRs. The Assessment Team believes that the recommendations set forth by the Task Force will aid in reducing the process time for FCRs. (CWSES ITEM 77-12)

Item 82 Update on Welding NCRs.

-M. -- Blendy presented a comparison on the number of welding NCRs issued

-in the past 2 to 3 months as opposed to the same period last year. The nurtber of NCRs issued since 1/84 has decreased by approximately 50% as compared with the number of NCRs issued between January and March 1983.

'This decrease is attributed to procedural changes which now clarify and/or incorporate requirements for items such as preheat and fitup.

(CLOSES ITEM 81-34)

Item 82 MPQAD Controlled Document Review.

.J. McMaster provided the Assessment. Team with a copy of the review plan and the results of the MPGAD monthly "self audit" of their controlled document station performed for the month of March. Attributes evaluated during the review included drawing revision number, proper posting of attachments and the presence of the proper identification stamp on the drawing. 'The sample size reviewed was 1031 documents. The number of attributes checked was 4754 and a total of 26 deficiencies were noted.

(CLOSES ITEM 81-6)

' ~ Notes of Daily Meeting Independent Assessment of Underpintiing Midland Plant,-Units 1 & 2 Consumers Power Company-

. Held at Midland Site Midland, Michigan-April 12,.'1984

No meeting was held on this date.

E 4

-e

'~

Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2-Consumers Power Company Held at Midland Site Midland, Michigan April 13,.1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster None J. Fisher J. McMaster D. Benvie J. Kelleher D. Zito

-E. Cviki P. Majeski D. Lavelle Parsons Brinckerhoff L J. Oliveira PURPOSE This meeting _is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION

- Status Items Item 82 Auxiliary Building Underpinning Activities.

Load transfer is.in progress for piers CT 1/12.

Installation of the struts for the pier CT 1 steel collar frame has begun.

Drift steel and lagging installation for the pier W17 drift is in progress.

(INFORMATION ITEM)

Item 82 SWPS Underpinning Activities.

Installation of the soldier pile wall struts has been completed along

- the east side of the SWPS. Excavation below the first level of wales along_the east side is expected to begin in the near future. (INFORMATION ITEM)

Item 82 NIR 24 - Design Drawing Review at UAT Workprint Station.

J. McMaster stated that the QAR response to NIR 24 addressing document deficiencies at the UAT workprint station is being reviewed by MPQAD.

The review is being co-ordinated with the Assessment Team to ensure the QAR response properly addresses the deficiencies noted in NIR 24. (NIR 24 remains OPEN) (INWRMATION ITEM)

New Items ,

Item 82 Weekly Report # 81.

The text of Weekly Report # 81 was reviewed . It was determined that

- all open items had been previously identified. (IN NRMATION ITEM)

V W- .

g-L ,_ _

~

, .Not:s of Daily. Meeting

,- Ind: pend:mt Ass:ssment of Underpinning

! -Midland Plant, Units 1 & 2 Consumers Power; Company Held at Midland Site-Midland, Michigan April 13, 1984-Item 82119 -- Pier E17 Construction.

D. , Benvie asked if the original design for pier E17 will be implemented if soil conditions ~are satisfactory. J. Fisher responded that the shaft portion of pier E17 will be excavated in accordance with the original design.- If it is found that bell excavation can be accomplished in the material encountered the remainder of the pier will be constructed in accordance with the original design. If belling cannot be accomplished, then the alternate design for the pier will be implemented. The _

alternate design consists of enlarging the initial pier shaft area p' and constructing it as a straight pier to founding grade. The pier 'will

-then be enlarged by constructing two additional piers directly adjacent to two sides of the initial shaft thus creating one large pier. (CLOSED-ITEM)

Response Items No response items were addressed.

O

. ~ PRitCIPAL STAFF 4

/RAi Mj W b ~

0/RA 2 l STONE & WEBSTER MICHIGAN, INC.

~

.\/RA OkiSF __

ac m^

P.O. Box 2325. BOSTON. M ASSACHUSETTS O2107 2Ao SCS s IF t le Mf United States Nuclear Regulatory Commission April 24, 1984 Midland Site Resident Office Route 7, J.O. No. 14358 Midland, Michigan Ref. MPF 83 e Attention: Mr. Cook DOCKET NO. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDENT ASSESSMENT OF UNDERPINNING REPORT NO. 83 A copy of the Independent Assessment of Underpinning Weekly Report No. 83 for the period of April 15, 1984 through April 21, 1984 is enclosed with this letter. Included as attachments are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction, and Quality Assurance personnel.

If you have any questions with respect to this report please contact me at (617) 589-2067.

YLfbw A. Stanley Lucks

{3 ?)wAL Project Manager Enclosures ASL/pd

_ 3"pWOOOM - g 9,3 $B4

Notea cf Daily Meeting Independent Assessment of Underpinning

... Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site '

Midland, Michigan April 19, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster G. Nrray J. Fisher J. && ster D. Benvie R. Wheeler J. Kelleher J. Meisenheimer D. Zito E. Cviki Parsons Brinckerhoff B. Metros PURPOSE

'Ihis meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items Item 83 Auxiliary Building Undepinning Activities.

Installation of the reshore members is in progress for the drift to pier W5.

Routine rejacking has been completed for pier Cr 1.

Excavation of the W17 pier shaft is complete.

Pier Kc9 was rejacked for load verification.

(INFORMATION ITEM)

New Items Item 83 Receipt Inspection of the CT 3/10 Transfer Frames and E/W5 Grillages.

J. Mc& ster reported that MPQAD will begin receipt inspection of the CT 3/10 transfer frames today. D. Benvie asked if receipt inspection of the E/W 5 grillages has been completed. J. Fisher will respond. (OPEN '

ITEN) l Item 83 Weekly Report # 82.

'Ihe text of Weekly Report # 82 was reviewed. It was determined that all open items h&d been previously identified. (INFORMATION ITEM)

Response Items Item 83 NIR 24 Design Drawing Review at UAT Workprint Station.

D. Benvie stated that the Assessment Team has reviewed the QAR response to NIR 24 addressing document deficiencies at the UAT workprint station.

Document deficiencies noted in the NIR have been corrected. Additionally, a sample audit of the UAT workprint stqtion by MPQAD did not reveal any deficiencies. Based on the sample audit resultr, and an independent review by the Assessment Team that the noted document deficiencies were corrected, NIR 24 is closed. (INFORMATION ITEN)

i x '

. J.O. No. 14358 Midland Plant

^

Units 1 & 2

. Independent Assessment of Underpinning.

Weekly Report No. 83 April'15, 1984 through April ll, 1984 Personnel on Site Stone & Webster Michigan, Inc.

P. Majeski 4/15 - 4/17 D. Benvie 4/16 - 4/21 D. Zito 4/16 - 4/20 L. Bouen 4/16 - 4/20 J. Springer 4/17 - 4/19

(

Parsons Brinckerhoff Michigan, Inc.

J. Oliveira 4/15 - 4/18 B. Metros 4/18 - 4/21

' Meetings Attended

., Date Represented Purpose 4/16 - 4/20 Stone & Webster Daily Assessrtent Bechtel Team Meeting Constners Power Parsons Underpinning and Remedial Soils - Coratruction Pier E17: Excavation of the drift was completed.

Pier E5: Excavation of the pier shaft began. Drifting to the reactor containment for installation of the E5 grillage continued.

Kc4-Kc5 and Kc9-Kc8 Drifts: Excavation , lagging installation and backpacking continued ..

Piers CT 3/10: Soils stabilization grouting and excavation of the drop pits for piers CT 2/11 continued in preparation for drifting to piers CT 3/10.

Piers CT 1/12: Routing rejacking has been cortpleted for these piers.

Pier W5: Drifting to the reactor containment for installation of the W5 grillage was completed..

Pier W17:. Excavation of the pier is in progress.

Access Shaft Level "C" Wales: Alignment and fitup of the level C wales continued for the east and west access shafts.

SWPS: Installation of the upper level wales continued. Grouting of the strut plates for support of the soldier pile wall has been cortpleted along the east wall.

BWST: Construction of the ring foundation addition for both, tanks has resurted.

Cathodic Protection: Installation of cathodic protection in the yard area has resumed.

2 .

J.O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning t Assessment Team Observations - Construction Completion of load transfer for the CT 1 and 12 piers has allowed underpinning activities to progress into other areas of the Auxiliary Building. Excavation, backpacking , lagging placement and support steel erection for the drifts to piers Kc5/9 and E/WS was observed by the Assessment Team. Lagging was installed one board at a time and backpacked prior to installation of the next board. The

, sand backpacking was tamped fintly and evenly into place. Drift support steel was aligned in accordance with design requirements. Drilling, installation and ,

torquing of expansion anchors for the drift support sets conformed with project  !

procedures. The level of workmanship exhibited in perfonting the activities associated with drift construction continues to result in a quality installation.

Other underpinning activities in the Auxiliary Building overviewed by the Assessment Team include soil stabilization grouting for the CT 3/10 drifts and excavation of the E5 and W17 pier shafts. The metnod of grout placement  !

and grouting pressures used were in accordance with the procedures. Stability of the excavated CT 3/10 drift walls subsequent to grouting indicated that the grouting was effective. Excavation of the E5 and W17 pier shafts was perfonted with the aid of a template. Use of the template was effective in minimizing over excavation and maintaining the pier shaft alignments. The Assessment Team concludes that the implertentation of the grouting program and use of the template '

was prudent and effective in stabilizing the soil and minimizing over-excavation. i Assessrtent Team Observations - QA/QC The Assessrtent Team overviewed the MPQAD receipt inspection of the CT 3/10 transfer frames. The MPQAD inspector used proper inspection techniques to thoroughly ,

verify all dimensional requirements with the applicable design and shop drawings.

All material mark nurtbers were checked for traceability. The MPQAD findings included a fabrication error associated with a cross rtember of one of the  ;

tmnsfer frartes and a determination that sorte of the traterial mark numbers )

were rtissing. The Assessment Team concludes that the MPQAD receipt inspection

- of the CT 3/10 transfer frame was cortplete and thorough.

Crack reapping in the Control Tower by the cracictapping subcontracr,or (WJE) was witnessed by the Assessrtent Team. The activity was being perfonted by two technicians under the direction of a WJE Quality Assurance Engineer. The Assessitent Team believes this approach is an effective rcethod to ensure that both the procedural and technical intent of the project requirements for crack reapping are Itet.

Work Activity Packages '

The following Work Activity Package (WAP) overviews are in the open respond stage or have been cote.pleted during the past week.

WAP No. Title Status (Opened) (Closed) 83 Excavate, Install 4/10/84 4/16/84 and Backfill Electric Ductbank and Equipment l Pad For HVAC Fans

[

p

.n , , - . . . . ,- , , , . - . . . , . ~ . - , , , --.-..,.,-,,--.------..m.,,- , -- _ . . , - . . - - . , , ,

3 J.O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning Nonconformance Identification Reports The following Nonconformance Reports (NIRs) rdnain open or have been closed during the week.

NIR No. Description Status (0pened)(Closed)

.22 Resident Engineering 2/21/84 Document Control Stations 24 Design Drawing 3/30/84 4/19/84 Review at UAT Workprint Station 25 Compressive Strength 3/30/84 Testing of Concrete Cylinders Open Items Iterts discussed during rteetings are categorized as follows:

OPEN ITEM - An item for which anactionis required. Le item will remain open until the required action has been taken. Tracking is required.

CLOSED ITEM - An item, usually brought forward by the Assessment Team that is discussed and adequately responded to. No tracking is required.

INFORMATION ITEM - An item brought forward to provide general background infortnation regarding work, such as work status or an upcoming design change.

No tracking is required.

OPINION I'IEM - An opinion or suggestion given by the Assessment Team expressing an alternate construction or quality assurance technique . h e opinion or suggestion is given as a possible alternate that roay facilitate an operation.

! CLOSES ITEM - XX-XX - his notation identifies an action that closes a previously identified open item. Tracking of the open item stops.

he following listing of all Open items from the Daily Meeting Notes with Bechtel and the text of the Weekly Reports. Carry-Over items from past weeks which have been Closed this week are also listed.

Item No. ,

Description Closure i

64-7 QAP Review Program 83-24 64-10 Trend Analysis Open 71-17 Cortnuterized Civil Open Drawing Register l

l l

l L

4 '

~

J.O. No. 14358 Midland Plant Units 1 & 2 Independent Assessment of Underpinning Item No.. _ Description Closure 74-21 US Testing Correcti've Open Action 79-26 Upper Leveling Plates Open 79-28 SWPS Backpacking Open Material- -

79-34 SWPS Backpacking Open Placement 81-8 MPQAD Welding Audit 83-25 81-21 BOP Construction Verification of Soils Open Work 81-25 Trend Analysis Work 82-9 82-3 Surface Voids in Grout open 82-9 Trend Analysis Update Open 83-17 Craclatapping Open e

Subcontractor Audit f { 0v ( F f fS $nk Project Engineer Project Manager 6

Notea cf Daily Meeting Independent Assessment of Underpinning

. Midland Plant, Units 1 & 2 Consumecs Power Company Held at Midland Site '

Midland, Michigan April 16, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster G. Murray J. Fisher J. McMaster P. Majeski

' J. Kelleher R. Sevo D. Benvie E. Cvikl D. Zito B. Brandes L. Rouen Parsons Brinckerhoff J. Oliveira PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the 141dland Plant, Units 1 & 2.

DISCUSSION Status Items Item 83 Auxiliary Building Underpinning Activities.

Routing rejacking is in progress for pters CT 1/12.

Excavation of the drop pits to piers LT 2/11 has begun in preparation for drift excavation to piers CT 3/10.

Installation of lagging and backpacking has been ccrupleted for the pier W17 drift.

Excavation of the Kc4 to Kc5 and Kc9 to Kc8 drifts and installation of drift sets and associated lagging and backpacking is in progress.

Drifting to piers E/WS has begun.

(INFORMATION ITEM)

Item 83 3WPS Underpinning Activities.

J. Fisher reported that rain during the weekend had washed in a small portion of backpacking material along the north side of the SWPS. The affected area is presently being repacked. (INFO WATION ITEM)

Item 83 US Testing Corrective Action.

J. Kelleher reported that all of the US Testing quality control procedures with attached work instructions have been submitted to project engineering for review. Final issuance of the quality control pmcedures is expected in the near future. (Item 74-21 remains OPEN)

Item 83 Upper Leveling Plate.

J. Kelleher reported that smaller welds will be used to alleviate warping of the upper leveling p' ate that has resulted during welding of the leveling and bearing plate assembly. Project engineering will issue DCNs designating the

a 1 Notes cf Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Constaners Power Company Held at Midland Site Midland, Michigan '

April 16, 1984 new welding requirements for each type of leveling and bearing plate {

assembly. (Item 79-26 remains OPEN) (INFORMATION ITEM)

Item 83-5.- NIR 22 - Resident Engineering Document Control.

J. McMaster stated that the MPQAD audit of the Resident Engineers controlled docu:nents required as part of the closure for NIR-22 has been completed. The audit verified that deficiencies with the Resident Engineers controlled

  • documents noted $n NIR22 have been corrected. Additionally, results of the audit indicate that the Resident Engineers controlled documents are being maintained properly. (NIR 22 remains OPEN) (INFORMATION ITEM) r Item 83 NIR 25 - Compressive Strength Testing of Concrete Cylinders.

E. Cviki stated that the QAR response written to address NIR 25 has been .

transmitted to MPQAD for review. NIR 25 was written as a result of deficiencies associated with the use of the maximum load indicator needle on the US Testing concrete compression machine. (NIR 25 remains OPEN)

(INFORMATION ITEM) i New Items Item 83 Superplasticized Concrete.

P. &jeski asked if superplasticized concrete will be used for any fbture underpinning work. J. Fisher will respond. (OPEN ITEM)

Item 83 NCR Processing.

P. N jeski asked if a review of the NCR process responLe time will be perfomed. MPQAD will respond. (OPEN ITEM)

Item 83 Direct Hire Work.

J. Fisher reported that the following direct hire work activities will get underway in the near fbture:

l A. Boron Water Storage Tanks (BWSTs) ring foundations.

B. Cathodic protection.

C. Unit 2*HVAC foundation pad.

D. Diesel Generator fbel oil lines.

(INFORMATION ITEM)

Response Items l No response items were addressed.

l l

i i

Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site Midland, Michigan April 17, 1984 Present For: .

Consumers Power Bechtel MPQAD Stone & Webster G. Marray J. Fisher R. Sevo D- Benvie J. Kelleher D. Zito E. Cviki L. Rouen J. Springer Parsons Brinckerhoff J. Oliveira PURPOSE 1his meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units'1 & 2.

DISCUSSION Status Items Item 83 Auxiliary Building Underpinning Activities.

Soils stabilization grouting has begun for the drift to pier CT 10.

Excavation has begun for the W17 pier shaft.

Pier W9 was rejacked for load verification.

(INFORMATION ITEM)

Item 83 OAP Review Program.

R. Sevo scated that the QAP task force recommendations for improving selected PQCIs, construction procedures and specifications will be submitted to CP Co today. (Item 64-10 remains OPEN) (INFORMATION ITEM)

New Items Item 83 Pier E17 Drift.

D. Benvie discussed the drift to pier E17. It was noted that the drift, which is in ftill face concrete has progressed far enough to allow excavation of the E17 pier shaft. He questioned the need for completing the drift to the reactor wall, as the remainder of the drift is in fill concrete.

J. Fisher will respond. (OPEN ITEM)

Response Item Item 83 Superplasticized Concrete.

In response to the Assessment Team question regarding future use of superplasticized concrete, J. Kelleher stated that it is not planned to l

i

Notes of Daily Meeting

. Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site '

Midland, Michigan April 17, 1984 use this type of concrete for future work. The original intent for the use of superplasticizer was to facilitate pier concrete placement and develop high early concrete strength in order to allow loading of piers within 2 to 3 days of concrete placement. . For piers cortpleted to date, no placement problems have been experienced with concrete that does not - '

contain superplasticizer. Additionally, load transfer has nomally not been performed until at least 7 days after completion of concrete placement, alleviating the need for high early strength of the concrete.  ;

' CLOSES ITEM 83-7)

O i

l-f 1

i I q t

l l

Notes cf Daily Meeting Independent Assessment of Underpinning

. Midland Plant, Units 1 & 2 Consumers Power Ccapany Held at Midland Site Midland, Michigan '

April 18, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster G. Marray J. Fisher J. McMaster D. Benvie R. Wheeler J. Kelleher D. Zito J. Schaub E. Cvikl L. Rouen W. Brandes J. Springer Parsons Brinckerhoff f None -

PURPOSE This meeting is held each day to discuss items regarding the Independent i Soils Assessment at the Midland Plant, Units _1 & 2. l DISCUSSION Status Iterra Item 83 Auxiliary Building Underpinning Activities.

Soils stabilization gmuting is in progress for the drift to pier CT 3.

Installation of lagging and backpacking is in progress for the drifts to piers E/W5.

Drift excavation to the containment for the E/WS grillage is ongoing. ,

(INFORMATION ITEM)

Item 83 NIR 24 Design Drawing Review at UAT Workprint Station.

J. McMaster provided the Assessment Team with a copy of the QAR response to NIR 24 addressing document deficiencies at the UAT workprint station for review. (NIR 24 remains OPEN) (INFORMATION ITEM) s i Item 83 .16 _ Upper leveling Plates, i >

[ J. Kelleher stated that a welding demonstration using smaller welds for the upper leveling and bearing plate assemblies will be given today. The purpose

! of the demonstration is to determine whether the smaller weld will decrease leveling plate warping. (Item 79-16 remains CPEN) (INFORMATION ITEM) ,

New Items l

l i

, - , , - - . -.- , .-,.- --. - - . . - ~ - . . - - - - - , . - , . - ,-

,-,,---.----..n-,-r_~n,,.----n - . - - - - - - - - - - - - - -

-t Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Constaners Power Con:pany Held at Midland Site '

Midland, Michigan

- April 18, 1%4 Item 83 Crackn:apping Subcontractor Audit.  !

E. Cviki stated that the MPQAD audit of the crackmapping subcontractor  !

. (WJE) was completed yesterday. D. Benvie requested a copy of the audit rwport when it is issued. (OPEN ITEM) t Response Item Item 83 Pier E17 Drift. l J. Cisher responded to the Assessment Team question concerning completion of tne pier E17 drift. Presently the drift which is in fbil face concrete, does not have to be advanced any fbrther to allow construction of the E17 pier. However, procedural changes required to terminate the drift at this L

point would delay work on the E17 pier. 'Ihe drift will,therefore, be '

completed to design limits. (CLOSES ITEM 83-12) -

f O

P P

W n

e i

Noteg of Daily Meeting Independent Assessment of Underpinning  ;

. Midland Plant, Units 1 & 2 ,

Consumers Power Company Held'at Midland Site Midland, Michigan u '

April,19, 1984 -

Item 83 NCR Processing. '

J. Meisenheimer responded to the Assessment Teams question concerning NCR process msponse time. It was stated that with minor exceptions, the process time associated with recent NCRs has not adversely impacted construction progress. MPQAD believes that timely processing of future NCRs can be maintained as the construction activity and complexity increases. h e Assessment Team concurs with this response. However,  :

D. Benvie stated that as part of the Assessment Team's nomal overview  !

of the work, the NCR resolution process will continue to be evaluated. l (CwSES ITEM 83-8)  :

1 Item 83 QAP Review Program.

The Assessrtent Team reviewed the QAP task force recomendations for r

-irtproving selected PQCIs, construction procedures and specifications that were sutrcitted to CP Co. The recerntendations include revisions to these docurrents to facilitate construction and inspection of structure steel fabrication and erection, expansion anchor installation and welding.

The recoristendations also include guidelines for use in developing PQCIs, construction procedures and specifications associated with new construction areas or revisions to existing construction areas. The Assessitent Team believes that the efforts of the QAP Task Force were thorough. The recorrrtendations developed by the Teck Force will be useful in streamlining and facilitating inspection and construction for the processes reviewed. 4 The Assessrtent Team also believes that the guidelines recorrxtended for developing PQCIs and procedure for new construction areas will enhance the respective inspection and construction processes. This item is closed.

(CwSES ITEM 64-7) ,

7 Item 83 MPQAD Welding Audit.

J. McMaster provided the Assessitent Team with a copy of the MPQAD Welding audit report. (CLOSES ITEM 81-8) 4 1

i f

t

, ~ . _ _ _ _ , , _ . _ . . . - . _ _ , . _ , _ . _ _ . . . _ _ _ _ _ ... ,___ _ . . . . . _ _ . _ _ . - _ , , . _ . . _ _ . _ _ _ _ _ _ _ . - _ - . _ , _ . - . . . _ _ . _ - _ , __. _,

Notes of Daily Meeting Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Constaners Power Company Held at Midland Site ,

Midland, Michigan April 20, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster R. Wieland J. Fisher J. Moran D. Benvie J. Kelleher D. Zito E. Cviki Parsons Brinckerhoff B. Metros PURPOSE

'Ihis meeting is held each day to discuss items regarding the Independent.

Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items Item 83 Auxiliary Building Underpinning Activities.

Excavation of the E5 pier shaft has begun.

All major structural sections have been set into place for the Level C Wales in the east access shaft.

Piers E9/10 were rejacked for load verification.

(INFORMATION ITEM)

Item 83 SWPS Underpinning Activities.

J. Fisher stated that welding of wale gusset plates and shims for the soldier pile wall along the east side of the SWPS was in pmgress. Rill l penetration welds are required f:r the gussetplates and shims. 'Ihis requirement has delayed fbrther a xcavation below the first level wales on the east side of the SWPS until later next week. (INFORMATION ITEM)

Item 83 Direct Hire Work.

J. Fisher reported that direct hire work on the BWST ring foundations and cathodic protection has begun. Work in the Unit 2 HVAC foundation pad will consence once the work package has been approved by CP Co.

(INFORMATION ITD4)

New Items No new items were discussed.

l Response Item h

i

Notes of Daily Meeting '

Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company HeldatMidlandSitif '

Midland, Michigan April 20, 1984 Item 83 Receipt Inspection of E/WS Grillages.

  • In response to the Assessment Teams question regarding receipt inspection of the E/W5 grillages, J. Fisher stated that receipt inspection has not  !

been perfo.M. However , the established schedule for inspection of the grillages does provide for timely inspection of the grillages prior to the scheduled installation. (CLOSES ITEN 83-20) ,

i l

I t

e k

l t

i i

f

. , , . -. - __ ~_- -~ . = ,

. STOP.E 4 MBS?EG V'CMGAN :NO - I if /

2 r '/FR Y m JNCfpAL u o STAFF L

3/RF f i

)E A/w rn;,

Copy to: (C Xs ,

Dlavelle (eno) Bechtel Corp.

ECviki (enc) Bechtel Corp.

iAP_

dA.

5D3' 4L n

/dttQ/3 J ENF Fila g ,

United States Nuclear Regulatory Connission Ma[2,1984 Midland Site Resident Office Route 7, J.O. No. 14358 Midland, Michigan Ref. MPF 84  ;

e Attention: Mr. Cook i

-DOCKET NO. 50-339/330 MIDLAND PLANT UNITS 1 & 2 INDEPENDENT ASSESSMENT OF UNDERPINNING  ;

REPORT NO. 84 l A copy of the Independent Assessment of Underpinning Weekly Report No. 84 for the period of April 22, 1984 through April 28, 1984 is j enclosed with this letter. Included as attachments are the minutes  !

of the daily meetings held during the week between members of the f Assessment Team and Site Engineering, Construction and Quality i Assurance personnel. j If you have any questions with respect to this report please contact me at (617) 589-2067.

&d $5 (_y da ~

A. Stanley Lucks Project Manager j Enclosures ,

ASL/pd  ;

cc:

JJHarrison (enc), US NRC Glen Ellyn, IL ,

Grace Dow Memorial Library (enc) i DQuanne (enc) CP Co Midland (site)

JMooney (eno) CP Co Jackson i JMeisenheimer (enc) MPQAD Midland (site) t h

l l

i e4

.n i W 4W  ;

i s -

I J.0, No. 14358

- Midland Plant  !

Units 1 & 2 Independent Assessment of Underpinning I l

Weekly Report No. 84 )

April 22, 1984 through April 28, 1984 Personnel on Site Stone & Webster Michigan, Inc.

P. Majeski 4/26 - 4/28 D. Benvie 4/23 - 4/28 D. Zito 4/23 - 4/28 W. Kilker 4/23 - 4/27 S. Lucks 4/26 l Parsons Brinckerhoff Michigan, Inc.

J. Oliveira 4/26 - 4/28 l B. Metros 4/22 - 4/24 '

Meetings Attended I

,Date Represented Purpose 4/23 - 4/27 Stone & Webster Daily Assessment i Bechtel Team Meeting l Consumers Power Parsons 4/24 Consumers Power Project Soils Bechtel Meeting MPQAD Stone & Webster i 4/27 Stone & Webster Interorganizational i Consumers Power Meeting Bechtel MPQAD 4/27 Stone & Webster Document Control Consumers Power Information Meeting Bechtel MPQAD Underpinning and Remedial Soils - Construction Pier E.7: Excavation of the pier has begun. The type of soil encountered during initial excavation was judged to be unsuitable for belling. As a result, the alternate design consisting of a straight pier with an enlarged shaft area will be implemented. l Pier ES: Drifting to the reactor containment for installation of the E5 grillage was completed. Pier excavation progressed to the top of the bell and the ring beam was installed. Excavation of the drop pit for installation of the E5 grillage support columns at the reactor containment is in progress.

l 4

i

2 I J.O. No. 14358

. Midland Plant Unito 1 & 2

. Independent Assessreent of Underpinning Kc4-Kc5 and Kc9-Kc8 Drifts: Excavation of these drifts was certpleted through to the UATs. Excavation of the Kc5 and Kc8 piers is scheduled to begin next week.

Piers CT 3/10: Excavation of the drop pits for piirs CT 2/11 was cortpleted allowing drifting to piers CT 3/10 to comence.

Pier W5: Pier excavation progressed to the top of the bell and installation of the ring beam was cortpleted. Excavation of the drop pit required for installation of the W5 grillage support columns at the reactor containrtent 1J in progress.

Pier W17: Excavation of the pier was cortpleted to founding grade. Bell excavation is scheduled to start this week.

Access Shaft level "C" Wales: Alignitent and fitup of the Level C wales continued for the east and west access shafts.

SWPS: Installation of the upper level wales and support struts has been completed on the east side of the SWPS. Excavation below the upper level of wales is in progress on the east side. Btbedded and surface Itcunted strut, plates and strut installation for support of the upper wales continued on the north and west side of the SWPS.

BWSTs: Construction of the ring beam addition for both tanks is in progress.

Cathodic Pr:tection: Trench excavation for installation of cathodic protection is in progress.

Assessmet '; Team Observations - Construction The level of activity associated with the Auxiliary Building underpinning has increased significantly during the past two weeks. Construction has started on eight piers. Excavation and lagging installation for piers E/W5 and E/W17 was perforited in accordat.ce with procedural requirements. The Contractor was careful to minimize over excavation both horizontally and vertically.- '

Excavation was followed closely by lagging installation, ensuring ttat the height of unsupported soil within the pier excavations did not exceed the specified amount. Backpacking behind the lagging was tattped firmly and evenly into place. In those areas of the W17 pier where over excavation behind the lagging exceeded the design requirernents, the Subcontractor placed grout in accordance with the procedures. Adequate iteasures were taken by the Sub-contractor to control and restove water seepage in the E5 and W17 pier ex-cavations, etinimizing softening of the inplace soil.

Installation of the drift set adjacent to the reactor containment wall for the E5 drift was observed by the Assessment Team. The contractor used both stanual and optical survey teethods to maintain aligninent throughout the installation process. Installation and torqueing of the drift set expansion anchors to the required tension cottpleted the satisfactory installation of this drift set.

J.O. No. 14358 3 Midland Plant Units 1 & 2 Independent Assessment of Underpinning As part of the direct hire work for 1984, the Contractor has resumed sek on the Borated Water Storage Tanks (BWSTs). h e Assessment Team observed the Contractor perform a status assessment of the work completed to date on the ring beam additions at the BWSTs. h is verification p"ecess consisLa of checking the installed concrete reinforcing steel for proper sizing, spacing and clear cover. The Assessment Team believes that this reverification process is a prudent measure on the part of the contractor considering the length of tine work on the BWSTs had been discontinued.

Assessment Team Observation - QA/QC he Assessment Team observed certification of the Nelson stud welding machine and the machine operator. As part of the certification test, the operator was required to weld a series of 10 Nelson studs. MPQAD measured the energy output of the welding machine during welding of e'ch stud to verify that the machine output was steady and constant. Finally, the Nelson studs were strength tested by bending the studs 90' from their original position.

None of the welded studs failed, concluding the successful certification of the welding machine and the operator.

MPQAD inspection of drift set expansion anchors and anchor bolts for the Level C wale support plates was overviewed by the Assessment Team. he inspector ensured that the anchor and bolt holes were drilled to the proper depths. he inspection also verified that the anchors and bolts were tensioned to the appropriate design loads with calibrated tensioning equiptent. After the installations were cortpleted, the inspectors marked the anchor nuts with an adhesive to aid in examining the anchors for signs of loosening during subsequent inspections. he Assesortent TEhm concludes that the MPQAD in-spections of the expansion anchor and anchor bolt installations were thorough, he thoroughness observed indicates that the MPQAD inspectors are sufficiently knowledgeable of design and procedural requirertents for expansion anchor and anchor bolt installation.

Work Activity Packages _

No work activity packages were overview or active during the past week.

Nonconfortrance Identification Reports The following Nonconforrrance Recorts (NIRs) rerrain ocen or have been closed during the week.

NIR No. Description Status (0pened) (Closed) 22 Resident Engineering 2/21/84 Docurrent Control 25 Compressive Strergth 3/30/84 Testing of Concrete Cylinders

J.O. No. 14358 4 Midland Plant Units 1 & 2
  • Independent Assessment of Underpinning Open Items Items discussed during n:eetings are categorized as follows:  !

OPEN ITEN -~An item for which an action is. required. The item will rertain open until the required action has been taken. Tracking is required.

CIDSED ITEM - An item, usually brought forward by the Assessrtent Team that {

is discussed and adequately responded to. No tracking is required. j INFORMATION ITEM - An item brought forward to provide general background inforn:ation regarding work, such as work status or an upcoming design change. i No tracking is required.

OPINION ITEM - An opinion or suggestion given by the Assessment Team expressing an alternate construction or quality assurance technique. .The opinion or suggestion is given as a possible alternate that may facilitate an operation. t CLOSES ITEM - XX-XX - This notation identifies an action that closes a  !

, previously-identified open item. Tracking of the open item stops.

The following listing of all Open items from the Daily Meeting Notes with Bechtel and the text of the Weekly Reports. Carry-Over items from past weeks which have been Closed this week are also listed.

Item No. Description Closure i 64-10 Trend Analysis Open 71-17 Computerized Civil Open Drawing Register 74-21 US Testing Corrective Open Action 79-26 Upper Leveling Plates Open 79-28 SWPS Backpacking Open Material 79 SWPS Backpacking Open ,

Placement >

81-21 . BOP Construction Open Verification of Soils Work l 82-3 Surface voids in Grout open Trend Analysis Update

! 82-9 Open

J.O. No. 14358 5 ,

Midland Plant Units 1 & 2

'. Independent. Assessment of Underpinning l Item No. Description Closure 83-17 Craclacapping 84-25 Subcontractor Audit 84-12 Diesel Fuel Oil Lines Open 84-13 SWPS Phase.II Cofferdam Open 84-20 Design Drawing Requirements Open for BWST Ring Beam Addition 84-21 Repair of BWST Ring Beam Cracks Open 84-22. BWST Concrete Reinforcing Steel Open 84-23 BWST Corrosion Protection and Open Waterproofing 84-24 Repair of Concrete Surface Open Imperfections of the BWSTs t

kh,ufyh)g]Q '

wV W 'IY'kl Project Engg.neer Project Managdr i

L i

l I

h Not03 of Daily Meeting . ._ ..

Independent Assessitent of . Underpinning  !

- Midland Plant, Units 1 &-2 l

- ' Consurners Power Cortpany f'

= Held at Midland Site f Midland, Michigan. '

April 23, 1984: ,

Present For.

Consumers Power Bechtel MPQAD Stone & Webster L

~

G. s Marray -J. Fisher None D. Benvie J. Kelleher D. Zito

'E. Cviki Parsons Brinckerhoff t B. Metrps

" PURPOSE,  ;

- This meeting is held;each day to discuss iterns regarding the Independent Soils'Assessrtent at-the Midland Plant, Units 1 & 2.

. I t

DISCUSSION. ~

I Status Iterts-Itert 84-1 ~ c ' Auxiliary Building Underpinning Activities. .{

Excavation'of the drop pitis for CT 2/11 is~ almost cortplete. Drifting to

, y. . ,CT 3/10 will corrxtence upon cortpletion of the CT 2/11 drop pits.

O Excavation' of the' Kc4 t'o'Kc5 drift lhas been cortpleted through to the west  :

UAT.,

Excavation of the Kc9 to Kc8~ drift continued. - The drift heading is approxirtately .

1

. 8' frem the ' east UAT. '

.. Ihe drift excavation for the W5 grillage has been cortpleted. Excavation

~

of the W5 pier is scheduled to begin today. f Drifting to the~ reactor containment for the E5 grillage continued. Excavation;

. of the E5 pier is in progress.

1 Excavation of the W17 pier shaft has been cortpleted to founding grade. Bell'  !

excavation is scheduled to start today.

Drift excavatio'n-for the E17 pier has been cortpleted.

~

t Grouting'of the levelLC wale support plates has begun in the east access shaft.

(INFORMATION ITEM)  :

Itern 84-2 -' ' SWPS Underpinning Activities.

' J. ; Fisher reported that installation of the large ertbedded strut plate on -

the SWPS is scheduled for today. Grouting of the strut plates along the .;

east side of the SWPS has been cortpleted. Further excavation on the east

. side of the SWPS below the first level ~of wales will begin shortly. (TNPORMATION  :

ITEM) -

f l

t

^

' ! 11 , s _ . . . _ , - , . . _ . . ..i.._---.__.. _ _ . . . ,-

Notes of Daily Meeting

- Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company ,

r L

Held at Midland Site '

Midland, Michigan -

April 23, 1984 Item 84-3 - Upper Leveling Plates. p J. Kelleher stated that the welding demonstration to evaluate the effect of using smaller welds for the upper leveling and bearing plate assembly was completed on Friday. In the demonstration, one side of the assembly was welded with a 1/2 in, weld while the other side used a 1/4 in weld.

As expected, warping was less on the side where the 1/4 in. weld was used.

Engineering is presently evaluating the results of the test. (Item 79-26 ren:ains OPEN) (INFORMATION ITEM) r New Items Item 84 4 - Slotted Holes for Tubular Steel lagging.

D. Zito asked if the NCR written due to fabrication of oversized holes for pieces of tubular steel lagging had been resolved. J. Fisher responded that the NCR is presently being dispositioned to use as is. (CLOSED ITEM)

Response Items No response items were addressed.

4 i

s.

t

m

[* NotG;s of Daily Meeting Independent Assessment of Underpinning

' Midland Plant, Units 1 & 2

- -Consumers Power Company Held at Midland Site Midland, Michigan

! April 24, 1984 Present- For:

. Consumers Power : Bechtel MPQAD Stone & Webster

~-G. -Murray. J. Fisher R. Sevo D. Benvie J. Kelleher D. Zito E. Cvikl W. Kilker Parsons Beinckerhoff B. Metros PURPOSE his meeting is' held.each day to discuss items regarding the Independent

. Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items Item 84 Auxiliary Building Underpinning Activities.

Excavation of. the E17 and W5 piers has been initiated.

Excavation of the drop pits to piers CT 2/11 have been completed.

he: drift excavation for the E5 grillage is complete.

Grouting of the: Level'C wale support plates has begun in the west access shaft..

(INFORMATION ITEM)-

New Items i

Item 84 Drift for the 'W5 Grillage.'

.  : W.: ,Kilker asked why the spaces.between-the wood lagging have been sealed

.for.that portion of the W5 drift closest to the reactor containment. J. Fisher

-responded that some over excavation'behind the lagging had occurred in this section of.the drift. As a result, the area behind the lagging will be grouted rather than backpacked. Be spaces between the lagging have been sealed to prevent any loss of grout during placetent. (CLOSED ITEM)

~ Item 84-7 ' Loading of E/W5 Grillages.

D. Benvie reviewed the' loading secuence for the E/W5 piers and grillages and

'noted that unlike the E/W8 piers, the E/WS piers will not be preloaded prior to_ loading of the grillages. He asked if there was a specific reason for not preloading the piers. E. Cviki and J. Fisher responded that the E/W8 b piers were preloaded because of additional leads in that area of the turbine T building. Rese additional loads are not present in the vicinity of the E/W5

.oiers. '(CLOSED ITEM) k' o

i

. Notes of: Daily Meeting

~

Independent Assessrtent of Und:rpinning

.- Midland Plant, Units 1 & 2 Consumers Power Cortpany Held at Midland Site Midland, Michigan April 24, 1984-1 Itert 84 Cathodic Protection.

D. Benvie asked what specific work is ongoing associated with cathodic protection. . J. -Fisher responded that trenching required for installation of the cathodic' protection is presently underway. It is anticipated that soil drilling of bereholes associated with the cathodic protection will begin in.4 to 6 weeks. (CLOSED ITEM)

JResponse Itecs No response iterts were addressed.

_ Notes of Daily Meeting

' Independent Assessment of Underpinning Midland Plant, Units 1 & 2 Consumers Power Company- ,

Held at Midland Site Midland, Michigan April.25,-1984

-Present For:  ;

Consumers Power Bechtel MPQAD Stone & Webster  ;

G. Murray. J. Fisher R. Sevo D. Benvie J. Kelleher J. McMaster D. Zito E. _Cvik1 W. Kilker Parsons Brinckerhoff None

/

PURPOSE This meeting is held each day to discuss items regarding the Independent

' Soils ~ Assessment at the Midland Plant, Units 1 & 2.

-DISCUSSION.

Status Items Item 84-9'- Auxiliary Building Underpinning Activities.

Placement of grout in the over' excavated area behind the W5 drift lagging

' is complete..

The concrete mudmat for the W17 pier base has been placed.

Installation of the steel collar frame for the drift to pier CT 3 will

'begin today..

lhe ' soil encountered during excavation of the E17 pier was judged to' be unsuit-

~

able for belling. As a result, the alternate design consisting of a straight-- pier with an enlarged shaft area will be irtplettented.

(INFORMATION ITEM);

Item 84 ~SWPS Underpinning Activities.

~

J. Fisher reported'that extension of the bentonite seal at the joint between

the SWPS and the Circulating Water. Intake Structure will start today. The

-  ; bentonite seal is being extended to prevent inflow of water through the

. joint from beneath the seal.

5It was reported;that preparations are being reade to allow the use of wooc lagging'in place of tubular steel lagging for. the soldier pile wall in thc.se

~

' areas where the lagging span is less than 8 feet. (INFORMATION ITEM)

New Iteres Itert 84 -- FSO. Controlled Docurrent Review.

!- J. Fisher reported that a review of FSO Controlled Docurtents will be perforrced this weekend by the FSO Quality Engineer. In the future, the FSO-Quality Engineer will perform a review of the FSO controlled documents once every two months. FSO will continue to "self-audit" their controlled docurtents once a

-month. (INFORMATION ITEN)

~

P Note 3 of Daily Meeting Independent Assrsment of Underpinning

' Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site Midland,. Michigan April 25,:1984 Item 84 Diesel Fuel Oil Lines.

D. Benvie asked for the status on initiation of work for the diesel fuel. oil-lines. J. Fisher will respond. (OPEN ITEM)

Item 84 S' WPS Phase II Cofferdam.

D. Benvie requested that the Assessment Team be provided with details of the proposed alternative under consideration for the SWPS Phase II cofferdam. The cofferdam is reauired for rebedding of the service water lines. J. Fisher will respond. (OPEN ITEM)

Response Items No' response items were addressed.

Notes of Daily Meeting

. Independent Assessment of Underpinning

-Midland Plant, Units 1 &-2 Consumers Power Company

. Held at Midland Sita Midland, Michigan.

' April 26, 1984 Present.For:

. Consumers Power Bechtel MPQAD Stone & Webster D. Puhalla J. Fisher R. Sevo D. Benvie J. Kelleher J. McMaster D. Zito E. Cvikl W. Kilker P. Majeski S. Lucks ,

Parsons Brinckerhoff-J. Oliveira PURPOSE This meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items Item 84 Auxiliary Building Underpinning Activities.

Excavation of the drop pit for installation of the WS grillage support columns at the reactor containment has begun.

Backfill grout was placed in the W17 bell due to minor soil sloughing.

' Excavation of the Kc9 to Kc8 drift has been completed to the east UAT.

(INFORMATION ITEM)

Item 84-15~- SWPS Underpinning Activities.

J. Fisher reported that the large embedded strut plate on the SWPS north wall has been set into place. Welding of the soldier pile wall struts to the strut plate ~is in progress.- (INFORMATION ITEM)

Item 84 SWPS Phase II Cofferdam and Diesel Ebel Oil Lines.

J. Fisher reported that Bechtel will present to CP Co on 4/27/84 details

-of the proposed alternatives under consideration for the SWPS Phase II cofferdam. Also, the status of the work associated with this diesel fuel oil:line will be discussed. (Item 84-13 and 84-14 remains OPEN) (INFORMA-TION ITEM)

New Items

. Item 84-17 Weekly Report # 83

'Ihe. text of Weekly Report # 83 was reviewed. It was detentined that all open items had been previously identified. (INFORMATION ITEM)

Note; of Daily Meeting Independ:nt Assersment of Und;rpinning Midland Plant, Unito 1 & 2'

. Consumers Power Company Held at Midland Site-Midland, Michigan-April 26, 1984 Item 84-18 -

Central Document Control Center Weekly Meeting.

J. McMaster stated that a weekly meeting will be held starting tortorrow at which, Central Document Control personnel will meet with MPQAD to discuss the status of the Central Document Control upgrading process. 'Ihe Assess-ment Team will also attend this meeting. 'Ihe meeting will serve as a forum for presenting and answering questions related to Central Document Control activities. (INFORMATION ITEM)

Response Items No response items were addressed.

l t

l l

l t

I l

y Notes of Daily Meeting Independent Assessment of Undepinning Midland Plant, Units 1 & 2 Consumers Power Company Held at Midland Site Midland, Michigan April 27, 1984 Present For:

Consumers Power Bechtel MPQAD Stone & Webster G. Harray J. Fisher J. McMaster D. Benvie R. Wieland J. Kelleher R. Sevo D. Zito E. Cvikl W. Kilker P. Majeski

. Parsons Brinckerhoff J. Oliveira PURPOSE

'Ihis meeting is held each day to discuss items regarding the Independent Soils Assessment at the Midland Plant, Units 1 & 2.

DISCUSSION Status Items _

Item 84 Auxiliary Building Underpinning.

Installation of the steel collar frame in the CT 11 drop pit is in progress.

Excavation of the drop pit for installation of the E5 grillage support columns at the reactor containment has begun.

(INFORMATION ITEM)

New Items

~

Item 84 Design Drawing Requirements for BWST Ring Beam Additions.

D. Zito discussed the design drawing requirements for the ring beam addition at each of the BWSTs. It was noted that the drawings indicate that concrete for each ring beam addition will be placed to the same elevation as the top of the existing ring beam and valve pit. However, the actual conditions do not match these indicated on the design drawing in that the top of the existing ring beam is approximately 1.5 inches higher than the top of the valve pit. The Assessment Team requested FSO to evaluate what impact if any, this elevation inconsistency will have at the interface of the ring beam addition and the valve pit for each BWST. (OPEN ITEM)

Item 84 Repair of BWST Ring Beam Cracks.

D. Zito asked if cracks in the existing ring beam greater than 10 mils have been mapped and ired g Kelleher responded that cracks greater than 10 mils have been mapped no repaired p accordance with engineering reauirements.

The Assessmenh -Team-askeddf the cracks on the underside of the valve pit top slab will require repair. J. Fisher will respond. (OPEN ITEM) s.
. E, or D2ily Meeting

' ependent Ass ss: Dent of Undsrpinning diand Plant, Units 1 & 2 consumers Power Company Held at Midland Site Midland, Michigan April 27, 1984 Item 84-22 -

BWST Concrete Reinforcing Steel.

D. Zito noted that reinforcing steel placed in the low area on the west side of the Unit No. 1 BWST is continuously wet and dirty. He asked what action is planned to correct this condition. J. Fisher will respond.

(OPEN ITEM)

Item 84 BWST Corrosion Protection and Waterproofing.

D.

the Zito discussed corrosion protection and waterproofing requirements for BWSTs.

It was pointed out that the channel sections being used to

' support reinforcing cage above the concrete mudn:at n:a contribute to .

cocrosion of the reinforcing cage.

The need for and condition of the existing waterstop was discussed. The waterstop the BWSTs. has been dan: aged in the vicinity of the valve pits for each of i he Assessment Team requested FSO to evaluate what effects if any, these proofing for the conditions BWSTs. will have on the corrosion protection and water- [

(OPEN ITEM)

Item 84-24 -

Repair of Concrete Surface Imperfections of the BWSTs.

I D. Zito stated that project specifications require that surface imperfections :

for formed concrete be repaired as soon as practical after removal of forms.

It was noted that minor surface imperfections on those portions of the Unit 2 BWST ring beam addition placed last year have not been repaired. The Assess-rcent Team requested FSO to review the intent of the specification in regards to timely repair of the surface imperfections. (OPEN ITEM)

Response Items Item 84 Craclatapping Subcontractor Audit.  !

E. Cvikl provided the Assessment Team with a copy of the MPQAD Report sum-marizing the results of their audit of the cracletapping subcontractor (WJE).