.g W TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II June 4, 1984 84 g 2., 52 BLRD-50-438/84-36 BLRD-50-439/84-33 U.S.' Nuclear Regulatory Commission -Region'II~ Attn:. Mr. James P. O'Reilly, Regional Administrator ' 101 Marietta Street, NW, Suite 2900 ' Atlanta,i Georgia. 30303 -
Dear Mr.'0'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - FAILURE TO IMPACT TEST SUPPORT MATERIALS - BLRD-50-438/84-36, BLRD-50.-439/84 FIRST INTERIM REPORT The subject deficiency was initially reported to'NRC-0IE Inspector P. E. Fredrickson on May 9,1984 in accordance with 10 CFR 50.55(e) as NCR BLN CEB 8407. Enclosed is our first interim report. We expect to submit our next report by June 17, 1985. 'q e e, s If you have 'a' y questions, please get in touch with R. H. Shell at n FTS 858-2688.
- e, 17 Very truly yours, TENNESSEE VALLEY AUTHORITY p5W v
$L.M. Mills, Manager T Nuclear Licensing Enclosure 00: Mr. Richard C. DeYoung, Director (Enclosure) i. d. Office of Inspection and Enforcement n U.S. -Nuolear Regulatory Commission Washington, D.C. 20555 ,. Records Center (Enclosure) ,.s, ru' ' Institute of Nuclear Power Operations 0-l,,';1100 -Circle 75 Parkway, Suite 1500 Atlanta, Oeorgia 30339 4/5 ./ ,;.y \\;s M' Y. I ,1 3lPOR 84061 45 840604 M 05000438 ,9', PDR [,' OFVICigh COPD 1983-TVA 50TH ANNIVERSARY ~ jg . An Equal Opportunity Employer L ~.
_y ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FAILURE TO IMPACT TEST SUPPORT MATERIALS BLRD-50-438/84-36, BLRD-50-439/84-33 NCR BLN CEB 8407 10 CFR 50.55(e) FIRST INTERItt REPORT t Description of Deficiency Bellefonte pipe support material impact test requirements are specified by the ASME B&PV Code Section III, subsection NF-5211, and Bellefonte Design Specification BLNP-DS-1915-2992-01. From these sources, ASME safety classes 1, 2, and 3 seismic pipe supports located in areas where the ambient service temperature can fall below 400F are required to be constructed from materials meeting impact test requirements. Due to misinterpretation of the Bellefonte design specification, various pipe supports in such areas are constructed from materials not qualified to impact test requirements. Interim Progress TVA is currently reviewing the deficiency to identify all nonconforming materials used. TVA will then evaluate the nonconforming materials to determine the corrective action. 9 e ,}}