Proposed Changes to Tech Specs 3.3.1 & 3.3.2 Allowing Alternative Actions for Tripping Inoperable Channel in Reactor Protection Sys or Isolation Sys
ML20091N937
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/06/1984
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20091N908 List:
References
NUDOCS 8406120514
Download: ML20091N937 (9)


Text

<

ENCLOSURE 1 i

SERIAL: NLS-84-092 BRUNSWICK STEAM ELECTRIC PLANT PROPOSED TECHNICAL SPECIFICATION PAGES - UNIT 1 (CP&L SERIAL 84TSB04) i' S

t i

t i

[

P

(

[

l i

t 8406120514 840606

>t PDR ADOCK 05000324 he PDR

. P..--

.I

., -,.., -. -.. - =.

r._

L Summary List of Revisions Brunswick Unit I h

Comment 3/4 3-1 Item 3.3.1.a - Revised and footnote (*) added Item 3.3.1.b - Revised and footnote (**) added 3/43-9 Item 3.3.2.b - Revised and footnote (*) added Item 3.3.2.c - Revised and footnote (**) added 3/4 3-10 Item 4.3.2.3 - Onetime surveillance requirement exemption removed.

l l'

I L

e (9575 MAT /pgp) e_-

(BSEP-1-20)

-3/4.3 ' INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRm4ENTATION

' LIMITING CONDITION FOR OPERATION 3.3.1 As a minimum, the reactor protection system instrumentation channels shown in Table 3.3.1-1 shall be OPERABLE with REACTOR PROTECTION SYSTEM RESPONSE TIME as shown in Table 3.3.1-2.

Set points and interlocks are given in Table 2.2.1-1.

APPLICABILITY: As shown in Table 3.3.1-1.

' ACTION:

l a.

With the requirements for the minimum number of OPERABLE channels not satisfied for one trip system, place the inoperable channel (s) and/or trip system in the tripped condition

  • within one hour.

b.

With the requirements for the minimum number of OPERABLE channels not satisfied for both trip systems, place at least one trip system ** in l

the tripped condition within one hour and take the ACTION required by Table 3.3.1-1.

The provisions of' Specification 3.0.3 are not applicable in OPERATIONAL c.

CONDITION 5.

SURVEILLANCE REQUIREMENTS 4.3.1.1 Each reactor protection system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations during the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.1-1.

4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of, all channels shall be performed at least once per 18 months and shall include calibration of time delay relays and timers necessary for proper functioning of the trip system.

4.3.1.3 The REACTOR PROTECTION SYSTEM RESPONSE TIME of each reactor trip function of Table 3.3.1-2 shall be demonstrated to be within its limit at least once per 18 months. -Each test shall include at least one logic train such that both logic trains are tested at least once per 36 months and one channel per function such that all channels are tested at least_once every N times 18 months where N is the total number of redundant channels in a i

specific reactor trip function.

l e

  • An inoperable channel need not be placed in the tripped condition where i

this would cause the Trip Function to occur..In these cases, the inoperable channel shall be restored co OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or l

the ACTION required by Table 3.3.1-1.for that Trip Function shall be taken.

    • If more channels are inoperable in one trip system'than in the other, place the trip system with more inoperable channels in the tripped l

condition, except when this would cause the Trip Function to occur.

s BRUNSWICK - UNIT-1

-3/4 3-1_

Amendment No.

~...

.. ~

[

(BSEP-1-20)

INSTRUMENTATION l

3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION l.

LIMITING CONDITION FOR OPERATION 3.3.2 The isolation actuation instrumentation channels shown in Table 3'.3.2-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.2-2 and with ISOLATION SYSTEM RESPONSE TIME as shown in Table 3.3.2-3.

APPLICABILITY: As shown in Table 3.3.2-1.

ACTION:

With an isolation actuation instrumentation channel trip setpoint a.

less conservative than the value shown in the Allowable Values column of Table 3.3.2-2, declare the channel inoperable and place the inoperable channel in the tripped condition until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.

b.

With.the requirements for the minimum number of OPERABLE channels not satisfied for one trip system, place the inoperable channel (s) and/or that trip system in the tripped condition

  • within one hour.

With the requirements for the minimum number of OPERABLE channels not c.

satisfied for both trip systems,. place at least one trip system ** in l

the tripped condition within one hour'and'take the ACTION required by

~~

Table 3.3.2-1.

d.

The provisions of Specification 3.0.3 are not applicable in OPERATIONAL CONDITION 5.

SURVEILLANCE REQUIREMENTS 4.3.2.1 Each isolation actuation instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations during the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.2-1.

4.3.2.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months and shall include calibration of time delay relays and timers necessary for proper functioning of the trip system.

t

  • An inoperable channel need not be placed in the tripped condition where this would cause the Trip Function to occur.

In these cases, the inoperable channel shall be restored to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or the ACTION required by Table 3.3.2-1 for that Trip Function shall be taken.

    • If more channels are inoperable in one trip system than in the other, place the trip system with more inoperable channels in the tripped condition, except when this would cause the' Trip Function to occur.

BRUNSWICK -- UNIT.1 3/4 3-9 Amendment No. 33

(BSEP-1-20)

INSTRUHENTATION SURVEILLANCE REQUIREMENTS (Continued) 4.3.2.3 The ISOLATION SYSTEM RESPONSE TIME of each isolation function shown in Table 3.3.2-3 shall be demonstrated to be within its limit at least once per 18 months. Each test shall include at least one logic train such that l

both logic chains are tested at least once per 36 months and one channel per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific isolation function.

)

i l

l l

BRUNSWICK - UNIT I 3/4 3-10 Amendment N'. 33 o

L

.-..- --~

4 1

f i

i e-ENCLOSURE 2 1

SERIAL: NLS-84-092 BRUNSWICK STEAM ELECTRIC PLANT PROPOSED TECHNICAL SPECIFICATION PAGES - UNIT 2 (CP&L SERIAL 84TSB04) l t

i 4

4 i

1 4

1 k'

1 9

I t

4 o

e Y

0 b

e

+

w k

"7-

~

o-sb' 14+

--s,,

s.

a.

y.e,

,4

,,_.g.,

n,,, ', _,,, _

_m, y._

..,,,p

e Summary List of Revisions Brunswick Unit 2 h

Comment 3/43-1 Item 3.3.1.a - Revised and footnote (*) added Item 3.3.1.b - Revised and footnote (**) added 3/43-9 Item 3.3.2.b - Revised and footnote (*) added Item 3.3.2.c - Revised and footnote (**) added l?

l e

(9575 MAT /pgp)

[

(BSEP-2-20) i 3/4.3 INSTRUMENTATION' 3/4.3.1 " REACTOR PROTECTION SYSTEM INSTRUMENTATION LIMITING' CONDITION FOR OPERATION

. 3.3.1. As a minimum, the reactor protection system instrumentation channels shown in Table 3.3.1-1 shall be OPERABLE with REACTOR PROTECTION SYSTEM

-RESPONSE' TIME as shown in Table 3.3.1-2.

Set points and interlocks are given in Table 2.2.1-1.

APPLICABILITY: As shown in Table 3.3.1-1.

ACTION:

a.

With the requirements for the minimum number of OPERABLE channels not satisfied for one trip system, place the inoperable channel (s) and/or trip system in the tripped condition

  • within one hour.

b.

With the requirements for the minimum number of OPERABLE channels not satisfied for both trip systems, place at least one trip system ** in l

the tripped condition within one hour and take the ACTION required by

-Table 3.3.1-1.

c.

The provisions of Specification 3.0.3 are not applicable in OPERATIONAL CONDITION 5.

SURVEILLANCE REOUIREMENTS 4.3.1.1 Each reactor protection system instrumentation channel shall be demonstrated OPERABLE oy the performance of the CHANNEL CHECK, CHANNEL

. CALIBRATION and CHANNEL FUNCTIONAL TEST operations during the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.1-1.

4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of, all' channels shall be performed at least once per 18 months and shall include calibration of time delay relays and timers necessary for proper functioning of-the trip system.

4.3.1.3 The REACTOR PROTECTION SYSTEM RESPONSE TIME of each reactor trip function of Table 3.3.1-2 shall be demonstrated to be within its limit at least once per 18 months. Each test shall include at least one logic train such that both logic trains are tested at least once per 36 months and one channel per. function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor. trip function.

  • An inoperable channel need not be placed in the tripped condition where this would.cause the Trip Function to occur.

In these cases, the inoperable channel shall be restored to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.or

-the ACTION required by Table.3.3.1-1-for that Trip Function shall be

.taken.

    • If.more channels are inoperable in one trip system than in the other,

-place the trip system with more inoperable channels in the tripped condition, except when this would cause the Trip Function to occur.

' BRUNSWICK - UNIT 2-3/4 3 Amendment No.-

""~

(BSEP-2-20)

\\

~

INSTRUMENTATION 3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2 The isolation actuation instrumentation channels shown in Table 3.3.2-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.2-2 and with ISOLATION SYSTEM RESPONSE TIME as shown in Table 3.3.2-3.

APPLICABILITY: As shown in Table 3.3.2-1.

ACTION:

With an isolation actuation instrumentation channel trip setpoint a.

less conservative than the value shown in the Allowable Values column of Table 3.3.2-2, declare the channel inoperable and place the inoperable channel in the tripped condition until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value, b.

With the requirements for the minimum number of OPERABLE channels not satisfied for one trip system, place the inoperable channel (s) and/or that trip system in the tripped condition

  • within one hour.

With the requirements for the minimum number of OPERABLE channels c.

not satisfied for both trip systems, place at least one trip system **

l I

in the tripped condition within one hour and take the ACTION required by Table 3.3.2-1.

d.

The provisions of Specification 3.0.3 are not applicable in OPERATIONAL CONDITION 5.

SURVEILLANCE REQUIREMENTS 4.3.2.1 Each isolation actuation instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations during the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.2-1.

4.3.2.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months and shall include calibration of time delay relays and timers necessary for proper functioning of the trip system.

t

  • An inoperable channel need not be placed in the tripped condition where this would cause the Trip Function to occur._

In these cases, the inoperable channel shall be restored to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or the ACTION required by Table 3.3.2-1 for that Trip Function shall be taken.

    • If more channels are inoperable in one trip system than in the other.

place the trip system with more inoperable channels in the tripped condition, except when this would cause the Trip Function to occur.

BRUNSWICK - UNIT 2 3/4 3-9 Amendment No. 33

/