ML20091M293

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1984
ML20091M293
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1984
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0684-04, 3F684-4, NUDOCS 8406110216
Download: ML20091M293 (5)


Text

W l

.' l' A

OPERATING DATA RErORT DOCKE' NO. 50-302 DATE 6/1/84 l COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPER.LTING STATUS Crystal River Unit 3 Notes

1. Unit Name:
2. Reporting Period: 5/1/84 - 5/31/84
3. Licensed Thennal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A s

This Month Yr to-Date Cumulative II. Hours in Reporting Period 744 3647 63287 l 12. Number Of Hours Reactor Was Criticai 744 3341.1 40910,3

13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 744 3302.6 39921.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1765685 7904908 _ 89869243 -
17. Gross Electrical Energy Generated (MWH) 605474 .. 77470R1 3n66aR17

, 18. ' Net Electrical Energy Generated (MWH) 576770 2614083 29131166

19. Unit Service Factor 100 % 90.6 % 63.1%
20. Unit Availability Factor 100 % 90.6 % 63.1 %
21. Unit Capacity Factor (Using MDC Net) - 94.4 % 87.3 % 58.1 %
22. Unit Capacity Factor (Using DER Net) - 94.0% 86.9 % 55.8 %
23. Unit Forced Outage Rate 0% 3.1 % 77.7 %

24.' Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

None

\

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 'N/A

. 26. . Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY I/30/77 COMMERCIAL OPERATION 3/13/77 8406110216 840531 PDR ADOCK 05000302 R PDR . (9/77) p}

. b . -

~

-' t

_' AVERAGE DALLY UNIT POWER LEVEL ' '

DOCKET NO. 50-302 UNIT Fif R P-3 DATE 6/1/84

. COMPLETED BY D. Grahnm TELEPHONE (904) 795-3802 MONTH May 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

.I 808 17 797 2 806 1g R27 3

803 gg 808 4 803 20 806 5 808 21 803 6 795 22 Ro1 7 788 23 795 g 777 24 792 9 760 25 863 10 531 26 703 g 573 27 789 12 798 2g 766 13 811 29 743 34 812 30 652 15 797 33 822 16 796 INSTRUCTIONS On this format. list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

KE '

UNIT SilUTDOWNS AND POWER REDUCTIONS , NAME FL R P-3 ,

DATE 0/l/04 COMPLETED BY R A SM wg ee REPORT MONTil 5/84 TELEPHONE (904) 795-3802 e.

%. C

  • k.

jg 3 j $5 Licensee gg

  • {.

Cause & Corrective No. D.ste i 3g 4 .2 5$ Event 3,7 EO l-- yE 5 3  ;;j c Report # mV Present Recurrence

e. g uo O

84-19 840504 F 4.8 B N/A N/A CH INSTRU Reduced power to control feedwater v.

oscillations during control rod performance .E testing. 14 84-20 840507 F 3.3 B N/A N/A CH INSTRU Reduced power to control feedwater oscillations during control rod performance

, testing.

84-21 840509 S 47.5 B N/A N/A HC HTEXCH Reduced power to clean condenser tubes.

84-22 840509 S 1.3 B N/A N/A CD INSTRU Reduced power to perform main steam throttle valve testing.

84-23 840529 S 16.8 B N/A N/A HC HTEXCH Reduced power to clean condenser

- waterboxes.

I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NURdG-D-Regulatory Restriction 40ther (Explain) 0161)

E-Operator Training & License Examination F-Administ rative 5 G-Operational Error (Explain) Inhibit I - Same Source (9/77) Il-Ot her ( E 4 plain) m+

^

l l

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 6/1/84 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH May 1984

SUMMARY

STATEMENT: The plant remained on-line the entire month. Power was reduced twice for control rod performance testing and to perform steam throttle valve testing.- The plant reduced power to clean the condenser tubes and waterboxes.

(

. ' oce

{ e f; oak?!

k$$5W 0oo00 M

P.o...w. .e. _r June 6,1984 3F0684-04 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket fJo. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 May 1984 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

,p 'W G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management DVH/feb Attachments cc: Mr. 3. P. O'Reilly Regional Administrato , Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303 fh . i r

GEN ERAL OFFICE 3201 Thirty-f aurth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 o 813-866-5151