m o.Je O'
Y NIAGARA NuMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE. N.Y.13202/ TELEPHONE (315) 474-1511 May _ 23, 1984 (NMP2L0061)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region.I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning the swing check valve in the reactor core isolation cooling turbine exhaust (55(e)-84-15). This problem was reported via telecon to Mr. S. Collins of your staff on April 27, 1984.
Very truly yours, YM l
T. E. Lempges l
Vice President Nuclear Generation l
TL:ja Enclosure xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
.R. A. Gramm, Resident Inspector
. Project File kh 0
S
!z l
- - 1G 321 I
- , j. ~s "
NIAGARA M0 HAWK POWER CORPORATION NINE MILE P0 INT UNIT 2 DOCKET N0. 50-410 Interim Report for the Problem Concerning Reactor Core Isolation-Cooling Turbine Exhaust Check Valve (55(e)-84-15) i Description of the Problem
.I.E. Information Notice 82-26 identified problems with reactor core isolation cooling. turbine exnaust check valves encountered in some operating boiling c
water reactors. Correspondence with the Nine Mile Point Unit 2 supplier of 1-:
the turbine exhaust check valves (Velan) has indicated that the standard swing check valve used at Nine Mile Point Unit 2 is not suitable for this application.
The-matter is still under investigation, and a final report will be submitted by. July 30, 1984.