'N fe.c S e tJe VI From:

Sada V.

Pullani (SVP) fg ggg g 6,f, To:

PJP Date:

Monday, June 27, 1994 3:52 pm

{A

Subject:

STP DET Staff Action 6.b.

Ye~ keJ>Ir; l'h 9 6 CC:

PROPOSED E-MAIL TO NRR FOR YOUR RE.IEW

References:

1.

Memorandum from James M.

Taylor to Thomas E.

Murley, Staff Actions Resulting from the Diagnostic Evaluation of South Texas Project, August 3, 1993.

2.

Memorandum from William T. Rusel to James M. Taylor, NRR Staff Actions Resulting from the Diagnostic Evaluation of Soth Texas Project (WITS-93133), June 14, 1994.

Staf f Action 6.b. in Reference 1. assigned NRR the resposibility to evaluate the need to provide addtional generic regulatory correspondence for multiple fuel injector hold down stud failures

[of Emergency Diesel Generators (EDGs)] and to issue guidance as appropriate."

However, Reference 2. closed this item based on the adequacy of a new solid stud design for the EDGs at STP, replacing old hollow stud design, but without evaluating the need to issue It should be generic correspondence or guidance to the licensees.

noted that several other licensees had experienced similar failures of their EDGs made by the same manuf acturer (Cooper-Bessemer) and the problem is not an isolated case at STP.

Based on the above, AEOD's independent verification of the resolution of this item cocludes that this item is not resolved.

The NRR staff is requested to discuss this matter with the AEOD staff ASAP and to continue to keep AEOD/DEIIB on distribution for items of interest on this issue.

cc:

S. Rubin P.

Prescott DEIIB Files D1012 SVP File 1.52 E-File G:\\DEIIB\\DEPFILES\\D1012\\STPSA6B.0SP CC:

SDR1 9509150350 950807 PDR FOIA COPELAN95-219 PDR

- -