Wisconsin Electnc PONER COMFANY 2y w Moon t.o tre xe wm#.o u 3 ai MW a ' m' VPNPD-92-146 HRC-92-010 April 7, 1992 U.
S.
NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Whshington, D.
C.
20555 Gentlemen:
DOCKETS59-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH 11RCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of March 1992.
Sincerely, W
.i
~y q
kbe%T Ef)
Ja s J.
Zach Vice President Nuclear Power Attachments Copies to L.
L.
Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector 100L'1 9204100395 920331 PDR ADOCK 05000266
[gQL/
R PDR
(//
A sohvilaan v/ Hlu wwn /heqr (>>r;8 vath>n
z OPERATING DATA REPORT DOCKET NO. 50-266 DATE: April 2, 1992 CohPLFTED BY:
D. C. Petersen TELEPHONE 414/755-2321 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES
- 2. REPORTING PERIOD:
MARCH 1992
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.
G. MAXIMUM DEPENDABLE CAPACITY (CROSS MWE):
509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SIN?! LAST REPORT, GIITE 'tEASONS-NOT APPLICABLE
- 9. POWER LEVEL 7V M~ICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR 7D DATE TLATI*.*E 744 2,234 187,608
- 11. HOURS IN REPORTING PERIOD 744.0 2,184.0 155,574.5
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 652.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 744.0 2,184.0 152,612.7
- 14. HOURS GENERATOR ON LINE 0.0 0.0 846.9
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,093,321 3,274,606 713,924,609
- 17. GROSS ELECTRICAL ENERGY GENERATED (hWH) 385,310 1,126,050 72,229,780
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 369,352 1,079,463 68,829,236 100.0 100.0 81.3
- 19. UNIT SERVICE FACTOR 100.0 100.0 81.8
- 20. UNIT AVAILABILITY FACTOR 102.4 101.9 75.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.9 99.4 73.8
- 22. UNIT CAPACITY FACTOR (USING DER NET)
O.0 0.0 1.7
- 23. UNIT FORCED OUTAGE RATE
- 24. 'NUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND CURATION OF EACH):
- 25. IF SHUTDOW AT END OF 'IEPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER CATED SEPTEMBER 22, 1977
e l-POINT BEACH M ' CLEAR PIANT DOCKET NO.
50-2r4 AVERAGE D AILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit l' MONTI MARCH - IW2 DATE Ard 2. L*C COMPLETED BY D. C. Peterxm TELEP110NE 414/75 5 2221 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
4'M 11 SM 21 NB 2
e)5 12 tw 22
- 6 3
- 15 13
- M 23 78 4
NM 14
%27 24 XM 5
- M 15
- 4 25
- M l
6 NM 16 9 12 2f>
495 7
- M 17
- M 27
%M 8
.897 IS
- 17 28 SM 9
SM 19
- 18 30 SJJ 31 x25 PDIWC2Sa (OWt) t
i POINT BEACli NUCLEAR PLANT Docket No.
MOM Unit Name Pdnt Beach. Unit 1 UNIT SIIUTDOWNS 4 *io P(MTR REDUCTIONS Date Ar ri! 3.19'E Completed By D. C. Pete:sen REPORT Nf 0NTII hfARCli - tw2 Telephone No.
414/755-2321. Ext. M1.
Methcd of Shuttirg No.
Date Type' Duratsm Reastm De=n
_xemee bent Sptem C g eert Cause ami Cor.ertm Artxe 2
l
'h1ethn&
' Exhibit G - 1::structions
'F: Forced Reason:
S: Scheduled A - Equipment Failure (explain) 1 - Af anual for preparatim of B - 51aintenance or Testing 2 - hianual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG4161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced laud F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain)
II - Other (explain) rmwnsd (03 *K))
1
5 4
DOCKET NO.
50-266 UNIT NAME Point Beach Nuclear Plant, Unit 1 DATE April 2, 1992 COMPLETE: BY D.
C.
Peterson TELEPHO)i 414-755-2321, Extension 361 S$
a;.
(!
Unit 1 operated at 492 Mwe not throughout this report period with r-iq'. ' ficant load reductions, d
1'*ed maintenance included:
Replaced and m'dified the u
!j q-s tion circuit on bat.tery chargers, repaired and i
i.he emergency diesel cooler differential pressure 3 to e' itch, and rebuilt spare emergency diesel air start orw J
N di 5
0 5
l l
1 I
m L
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: April 2, 1992 COMPLETED BY:
D. C. Peterson TELEPHONE 414/755-2321 OPERATING STATUS
- 1. UNIT NAME:
POINT FriCH NUCLEAR PLANT UNIT 2 NOTES
- 2. REPORTING PERIOD:
MARCH 1992
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS.WE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIGNS, (IP ANY):
NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 2,184 172,393
- 12. NUMBER OF HOURS REsiCTOR WAS CRITICAL 744.0 2,184.0 150,913.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 11.6 11.6 228.3
- 14. MOURS GENERATOR ON LINE 732.4 2,172.4 148,661.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
+
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,050,400 3,235,108 212,702,265
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 372,510 1,123,550 72,282,930
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 356,434 1,076,409 68,896,187
- 19. UNIT SERVICE FACTG.'.
98.4 99.5 86.2
- 20. UNIT AVAILABILITY FACTOR 98.4 99,5 86.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.8 101.6 81.7 l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.4 99.2 80.4
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 1.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTMS (TYPE, DATE, AND DURAT1DA OF EACH):
1
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 l
POINT BEACII NUCLEAR PIANT-DOCKET NO.-
M 301 AVERAGE DAILY UNIT POWER Lf'?,L UNIT NAME
' Point Beach. Urli 2 MONTH MARCH '992 DATE April 2.1992 j
COMPLETED BY D. C. Peterson TELEPIIONE 414n55-2321 l
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL._
DAY MWe NET
-DAY MWe NET DAY MWe NET 1
500 11
%0 21 477 2
500 12 503 22 47 3
500 13 500 23 340 4
500-14 499 24 498 5
501 15 499 25 498 6
5M 16 44) 26 499
~
496 17 499 27 MV) 8 500 18 500 28 4?)
9 500 19 500 29 49) 10 500 20 501 30 498 31 499 PIlF-#ES1 (03-90)
l
- POINT BEACll NUCLEAR PIANT
' Docket No.
_3!bT1 Unit Name Point Beach _ Uni
- 2 UNIT SIIUTOOWNS AND POWER REDUCTIONS Date.
April 2.1W2 Completed By D. C. Peterson REPORT MONTil MARCH - 1992 Tclephone No.
414/755-232L Ext. 361.
i Method of Shutting.
l 2
No.
Date Type Duration Reason Down
. Licensee Event System Component Cause and Corrective Action 8
(f fot,rs)
Reactor Report No.
Code' Code' To Prevent Recumece 1
920322 S
0 11 6
N/A N/A N/A Scheduled shutdomi for Main Steam Isolation Valve testing, generator and turtsne taken off line, reactor remained critical.
l P Forced
" Reason-
~
- Method:
' Exhibit G - Instructions 3: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load F - Adminatrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain) 4 PilF-002Sb (03-90)
l a
DOCKET NO.
50-301 UNIT NAME Point Beach' Nuclear Plant, Unit 2 DATE April 2, 1992 COMPLETED BY D.
C.
Peterson TELEPHONE 414-755-2321,- Extension 361 Unit 2 operated at approximately 479 Mwe not throughout this report period'with one significant load reduction.
Unit 2 experienced one reportable event in accordance with 10 CFR 50.73:
LER 92-001, " Improper Calibration of One Channel of Over-Temperature Delta T."
There was one scheduled outage to-test the main steam isolation valves.
Safety-related-maintenance included:
Replaced cooling fan on top _
of inverter, installed blank and gasket to replace eroded service water piping, and reconnected conduit at main steam isolation valve.
S' 4