Affidavit of DC Mccarthy in Support of Applicant Motion for Summary Disposition of Eddleman Contention 45 Re Water Hammer.Related Correspondence
ML20091D741
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/25/1984
From: Mccarthy D
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20091D695 List:
References
OL, NUDOCS 8405310466
Download: ML20091D741 (5)


Text

.

_ ~ _

REl>TED CORT 5ESPONDENCE, IEITED STATES OF AMERICA DOCKETE0 IWC2AR REGUUL10RY COMISSION t

J l

'84 MYS A10:15 BEFORE THE AltHIC SAFEIY AND LICENSING BOARD i

rp:m cr r 7 J

In the Matter df

)

~ y;p-['

i-

)

CAROLINA POWER & LIQfr OCHPANY

)

AND NDRIH CAROLINA EASTERN

)

Docket No. 50-400 OL KNICIPAL POWER AGDICY

)

(Shearon Harris Ibclear Power Plant,)

thit 1 l

j AFFIDAVIT OF DAVID C. MDCARTHY j

Comty of Wake

)

i 1

)

SS:

State of North Carolina David C. McCarthy, being duly sworn according to law, deposes and.

l says:

l 1.

I e employed by Carolina Power & Light Capany ("CP&L") as a j

Project Engineer in the Harris Plant !!bgineering Section.

I am responsible for adninistering the Nuclear Steen Supply Systen Contract l

and for licensing and raa"1=tary matters related to engineering at i

SmiPP. My business address is Shearon Harris Ibclear Pbwer Plant, Post Office Box 101, New Hill, North Carolina 27562. A statment of my l

l backgromd aid qualifications is affixed hereto as Attachment A.

I have personal knowledge of the matters stated herein and believe them to be true and correct.

2.

This affidavit is made in support of Applicants' Motion for Asunary Disposition of Eddleman Contantion 45.

'"~'

r-3.

The purpose cf thic affidavit 10 to confirm that the sloping design of the steam supply line to the auxiliary feedwater turbine referred to in Paragraph VI.2 of Mr. Dean Shah's affidavit will be verified by Applicants prior to fuel loading at SHNPP.

4.

As stated in Paragraph VI.2 of Mr. Shah's affidavit, the steam supply line to the auxiliary feedwater turbine has been designed to slope in the direction of the steam flow.

5.

Applicants will verify that this piping is in fact sloped in accordance with design specifications through the following rethods.

6.

The SHUPP site has control elevation points based upon survey points established by the United States Department of Interior.

7.

Plant structures have been constructed in accordance with design drawings which include design elevations.

8.

Subsequent to construction of plant structures, control survey points are established within the structures for the purpose of installing cceponents, piping, hangers, conduit and the like.

9.

Piping, including the steam cupply line, is installed in accordance with design drawings.

10. Elevation and slops are included in the design input and are reflected on design drawings.
11. Subsequent to installation an "as-constnicted" reconciliation of ASME Code Section III Class 1, 2, and 3 piping, which includes the steam supply line, will be performed in accordance with the requirements of the ASME Code.

(k' inter '76 Edition)

12. The liarris Plant Construction Department has issued a formal procedure to direct the reconciliation effort. This procedure is

currently being revised to specifically require verification that this slope of the steam supply line is in accordance with design requirements.

13. Should any deviation frca design be detected, the installed system will be miified to mke it emply with design requirements.

c2 v

David C. McCarthy Subscribed and swom to before e this day of !!ay,1984.

4, M,:tL, YQ

  • ???'

tbtAry Pub [ic p

!!y Ca mission Expires: / D t

n... s

(

?

l

. 1 DAVID C. McCARTHY Pro _iect Engineer j

BIRTH DATE:

August 27, 1954 I.

EDUCATION A.

B.S. Degree in Nuclear Engineering from the University of Virginia, Charlottesville, Virginia - 1976 II.

EXPERIENCE A.

Summers 1973 and'1974 1.

Buncher Rail Car Company, Inc., Lynchburg, Virginia a.

Demolition and construction worker B.

Summer 1975 1.

Sims Wholesale Distributing Company, Inc., Lynchburg, Virginia a.

Sales Assistant

' \\.

C.

June 1976 to August 1979 1.

Duke Power Company (Oconee Nuclear Station and McGuire Nuclear Station) a.

Nuclear Engineer D.

August 1979 to present 1.

Carolina Power & Light Company, Raleigh, North Carolina s

a.

Employed as Engineer in the Engineering Pool Section of the Power Plant Engineering Department b.

December 1, 1979 - Transferred as Engineer to the Harris Plant Engineering Section of the Nucicar Power Plant Engineering Department.

c.

July 11, 1981 - Promoted to Senior Engineer in the Harris Plant Engineering Section of the Nuclear Plant Engineering Department, located at New Hill, NC.

4' sw I

e

i David C. McCarthy Page 2

}~'

d.

June 25, 1983 - Promoted to Project Engineer in the Mechanical Unit, Harris Plant Engineering Section, Nuclear Plant Engineering Department, located at New Hill, NC.

l III. PROFESSION /.L SOCIETIES A.

American Nuclear Society I

j 4

I

.I i

e J

O i