Suppls 840229 Response to Violations Noted in IE Insp Rept 50-261/83-26.Corrective Actions:Old Steam Generator Tube Bundles Replaced W/New Bundles & New & Upgraded Secondary Water Sys Utilized
ML20091A915
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/20/1984
From: Morgan R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20091A894 List:
References
RSEP-84-288, NUDOCS 8405300128
Download: ML20091A915 (2)


Text

_ _ _ _ _ _ _ _. _ _. _ _ _ _ - _ _ _

g

,c CD&L Carolina Power & L6ght Company

~

H. B. ROBINSON STEAM ELECTRIC PLANT Post Of fice Box 790 liartsville, South Carolina 29550

  1. R 20 584 Robinson File No 13510E Se rial RSEP/84-288 Mr. James P. O'Reilly Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street. Suite 3100 Atlanta, Coorgia 30303 l!. B. ROBINSON STEAM ELECTRIC PLANT DOCKET No. 50-261 LICENSE NO. DPR-23 NRC _IE INSPECTION REPORT TER-83-26

Dear Mr. O'Reilly:

This supplemental response provides clarification of Carolina Power and Light Company's (CP&L's) long term corrective actions as described in our response of Feb rua ry 29, 1984.

In that original responge, we indicated the untriue features of the old H. B. Robinson steam generators and identified several corrective actions which were based on continued use of the old steam generators. Howeve r, as was also indicated in the original response, the old steam generator tube bundles are currently being replaced with new bundles which will eliminate the mejor cause of the violation.

With respect to long term corrective actions in utiltains the new steam generator tube bundles, CP&L is committed to carrying forward the lessons learned with the old steam generators. These lessona havn already been reflectet in numerous corrective actions including new and upgraded secondary water systems (condensate polishers, makeup water treatment, and condensate storage tank bladder) AVT chemistry control, removal of copper from the secondary system, increased steam generator blow-down capability, and a better understanding of the Eddy Current inspection process.

In the area of Eddy Lurrent inspections, CP&L is committed to utilising the experience gained in the last several years for future steam generator inspection.e.

These inspections will be carriel out in accordance with the H. B. Robinson Technical Specifications, Corporate Quality Assurance requirements, and will Oh

ee Letter to Mr. J:mes P. O'R3111y 4

Serialt RSEP/84-288 Page 2 I

l utilise standard industry practices.

In addition, as a result of lessons learned.

l specific management attention will continue to be directed towards shif t manning schedules for the data evaluati, personnel and the scope of any data reverifica-l tion which would be based on the specific Eddy Current results. CP&L believes d'

j that the dove actions are adequate to prevent a recurrence of the violation.

i If you have any questions concerning this response, please contact me or 4

my statt.

Very truly yours, 4

I I

R. E. No an i

General Manager i

j H. B. Robinson SEG Plant I