t Wisconsin v"Uf Electnc POWER COMPAW wwun nro w w> w neoM w
2-
~
VPNPD 15 0 NRC-91 042 May 6, 1991 Document.ontrol Desk U.S.
NUCLEAR REGULATORY COMMISSION Mail Station F1-137 Washington, D.C.
20555 Attention: Mr. Robert Samworth, Project Manager Project Directorate III-3 Gentlemen:
DOCKETS 50-266 AND 50-301 10 CFR 50 DEDICATED SHUTDOWN CAPABILITY fTAC NOS. 79388 AND 79389)_
POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 on December 21, 1990, Wisconsin Electric Power Company, licensee for Point Beach Nuclear Plant Units 1 and 2, submitted a request for a schedular exemption to Regulation 10 CFR 50.48(d) (4) in accordance with the provisions of 10 CFR 50.12.
In a letter dated March 14, 1991, this request for a schedular exemption was denied.
The purpose of this letter is to advise you of the progress of the installation of the switchgear room bypass modification at the Point Beach Nuclear Plant.
All major equip-ment, including transformer /switchgear, motor control centers, control panel, r.nd local transfer switches, have been installed.
Installation of cable tray, conduit, and cable was essentially completed on April 17, 1991.
The rearrangement of the normal power supplies to the four residual heat removal pumps was completed by May 1, 1991.
This arrangement routes the normal power supply for each pump through a normal-alternate source switch.
will be completed in May. Connection of the alternate supply to these switches The transformer which supplies the alternate shutdown system was initially energized on May 4.
Rearrangement of normal power supplies is continuing this week.
9100140375 910506 gDR ADOCK05000gg6 ffCO[
buu d n emnecnenum O
n
U.S.
Document Control Desk May 6,
1991 Page 2 Completion cf the remaining work, including the operator train-ing, is still on schedule for our June 1, 1991, project comple-l tion date.
At that time we will notify you of the completion of the project.
Please contact us if you have any questions regard-l ing our progress in this matter.
Very truly yours, i
/
{
}
/.
-}..
Vic}e President C.
- i. Yay Nuclear Power Copy to Regional Administrator Region III NRC Resident Inspector i