ML20090M582
| ML20090M582 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/18/1992 |
| From: | Berkow H Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20090M585 | List: |
| References | |
| NUDOCS 9203240379 | |
| Download: ML20090M582 (3) | |
Text
. - _
3 4' p * * <. %'q, UNIT ED STATES
! 4*
NUCLE AR REGULATORY COMMISSION wAsamatov.o c. 20su N.7 '.. '
anPJSA POWER CORPORAT10fl CllY Of ALACHUA Cllt of BUSuyRL L11LOLEAINLSVILLE CITY Of KIStlMti[1-LilLQLELSAEi (LTY Of NEW SMYRNA BEACH ANDJ!111Lll15 00MMISS10fl. CITY Of NEW SMYRNA Bf L11LQL0fdB ort ANDO VTILi11LLLQ!iU15.lDL6!ELC11LOLORlANDO SEMINOLE ELECTRIC 000PLMlly1Jru (ITY Of 1ALBM51E DO(KET NO. 50-302
[RYSTAt R1Xf.R..V!ilT 3 NUCLEAR GENERATING PL ANI hMEDEl!!! 10 FAClllTY OPIBATING LICENS[
Amendment No.140 License No. DPR-72 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by florida Power Corporation, et al.*
(the licensees) dated August 16, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can-be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and
- As of the effective date of this amendment, Sebring Utilities Commission is no longer a licensee.
9203240379 920310 PDR ADDCK 05000302-P PDR
. E.
The issuance of this ame,idment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Sebring Utilities fommission is deleted from f acility Operating License flo. DPR-72, and paragraph 1.A of facility Operating License No. DPP.-72 is hereby amended to read as follows:**
A.
The application filed by Florida Power Corporation, City of Alachua. City of Bushnell, City of Cainesville, City of Kissimmte, City of Leesburg, City 4 ow Smyrna Beach and Utilities Commission, City of New Sm, a Beach, City of Ocala, Orlando Utilities Commission and City of Orlando, Sebring Utilities Commissien*, Seminole Electric Cooperative, Inc., and City of lallahassee (the licensees) as supplemented by letter dated December 9,1976, complies with the standards and requirements of the Atemic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I;
- As of the effective date of Amendment No. 140, Sebring Utilities Commission is no longer a licensee under this license.
3.
This license amendment is effective as of the date the transfer of Sebring's ownership share to florida Power Corporation is completeJ.
F0lPT)
NUCLEAR REGULATORY COMMISSION Herbert N. Berkow, Director Project Directorate !!-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Page 1 of License Date of Issuance: l' arch 18, 1992
- Page 1 is attached, for convenience, for the composite licease to reflect this change.
t
n...
~.
y{f **auq'cg UNITED STATES NUCLEAR REGULATORY COMMISSION y
3
(
g W AS6HNoTON, D. C. 20555
'%,,,,, /
fl0R10A POWER CORPORATION C1TY OLALAJ111M
[lTY OF WISJft{L11 f.1]1 0F GAINESVILLE
[JJJ OF KISSIMLi[
[IlLDF LEESBQE[i GJTY OF_lllW_JMYRNA BEACH At4D UTitJJJJi_(qM..M_11510N. CITY OfjdW SMYRNA Bf Aj;M
[JJJ OF 0(A13 Q81.Al@Q_QI]1Ul($ COMMISSLQfi AND C_lTY OF ORUMQ l
SEMINOLE ELE.LJR!C 000PJRATivE, INC2 CITY OF,,JALL AHASSfd D0{L[J.,J10 50-302
[RYSTAL,_RlVER UNIT 3 NUCLEAR GENERATING _J,1Atll AMENDMINT TO FACIllTY OPERATING tl(if15[
Amendment No. 2 License No. OPR-72 1.
The Nuclear Reau1 % ry Commission (the Commission) having found that.
A.
The application filed by Florida 'ower Corporation, City of r
Alachua, City of Bushnell, City of Gainesville, City of Kissimmee, City of Leesburg, City of New Smyrna Beach and Utilities Commission, City of New Smyrna Beach, City of Ocala, Orlando Utilities Connission and City of Orlando, Sebring Utilities l
Comission*, Seminole Electric Cooperative, Inc., and City of Tallaharsee (the licensees) as supplemented by letter dated December 9, 1976, complies with the standards and requirements of the' Atomic Energy Act of-19d4, as amended (the Act) and the Commission's rules and regulations set forth in 10 CfR Chapter 1; B.
Construction of the Crystal River Unit 3 Nuclear Generating Plant (facility) has been substantially completed in conformity with Provisional Construction Permit Na. CPPR-51 and the application, as amended, the prnvisions of the Act anti the rules and regulations of the Commission; The f acility will operate in conformity with the application, as C.
amends 4 the provisions of the Act, and the rules and regulations of the Commission;
- As of the effective date of Amendment No. 140
, Sebring Utilities l
1' Commission is no longer a licensee under this license.
Amendment No.140