a VIRGINIA POWER COMPANY NORTH ANNA POWER STATION HONTHLY OPERATING REPORT HONTH._Eghnigy_
YEAR:
1992
't 1
I Approved:
/
h k, Stat _ ion Manager _ _ _ - -
I 9203f.90155 920229 I
PDR ADOCK 05000339 l
9 PDR i
m_
I, OPEkATIN6 DA1A REPORT DOCKET No.:
50 338 DATE: March 2. 1992
' COMPLETED SY C. Mladen PHONE: (703) 894 2T74 OPERAT!MG STA1US F
-- 1 ' - Uni t Name <............................... Nor t h Ame 1 2.
R eport i re Pe r i od:......................... F ebr uary 1992 3.
L i censed T h erma l Pouver (MWt ).............
2,893 4.
Nameplete Rating (Gross MWe):.............
947 5.
Design Electrical Rating (Wet MWe);.......
907 6.
Maalaus Depomebte Cepeelty (Groos NWe)2..
959 F.
Maximun ospendeble capacity (Wet MWe):....
911 6.
If changes occur fit Capecity Ratings (ltens No. 3 tlieu 7) 81nce last report, give reasons:
.l/A_
9.
Power levet.to which restricted, if any (Nat NWe): _ N/A
' 10. Reesons for restrict ens. _ f f any:
W/A This Month T*t-D Ctautative
- 11. Nours In R eport ing Per i od,..............................
696.0 1.440.0 120,012.0
- 13. Muuber o f Hours R eact or was cri t i ca l.....................
0.0 0.0 86.686.5 13.- Reac t or R es er ve ShutdcAe'. Nours...........................
0.0 0.0 6,721.7
-14. Hours Genurator 0n Line..................................
DJ) 0.0 83,771.5 15.~ tel t Reserve Shutdown Hour s.............................
0.0 0.0 0,0
- 16. Gross Thennel Er.ergy Gernreted 0WN'...............
0.0 0.0 222,952,772.4
.17. Gross E l ec t rica l Ene4/. Scaerated (MWM)..................
0.0 0.0 73,257,847.0
- 18. Ne t E l ect r i ca l Enery/ Genera ted (EI)....................
0.0 0.0 6?,354,617.0
_19, Unit Service factor......................................
0.0%
0.0%
49.5%
- 20. Unit Avalleollity Factor.................................
-0.0%
0.0%
69.5%
- 21. Unit capacity Factor (using M C Net).....................
0.0%
0.01 64.5%
- 23. Unit Capacity Factor (using DER Net).....................
0.0%
0.0%
63.7%
- 33. F or c od Out a ge R a t e.......................................
0.0%
C. 0%
12.3%
- 26. Shutdowns $chedated Over Next 6 Months (Type, Dete, and Duration of Each) 4/A J
- 25. If shuttku et and of Report Period, estimeted time of Startups __03/13/92_
- 26. Units in Test Status (Prior to Cournercial operation):
Forecast Achieved INITIAL CRITICALITT INITIAL ELECTRICITY COMERCIAL OPERATION l
le
~~
(
AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-338 Unit NA-1 Date March 2, 1992 Completed by:
C._Mladen Phonet (703) 894-2774 i
MONTH: _1gbrgp1V_1997 is-Ir Yi DAY AVERAGE DAILY POWER DAY AVERAGE EAILY LEVEL
?
LEVEL (MWe-Net)
LEVEL (MWe-Net)
-j.
1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 O_,
11 0
27 0
32 0
28 0
13 0
29 0
14 O_
IS 0
16 0
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
i s
UNIT SHUTDOWNS AND POWER REDUCTIONS l
DOCKET NO.:
50-338 UNIT NAME:
NA-1 DATE: March 2, 1992 REPORT MONTH: February 1992 COMPLETED BY:
C. Mladen PHONE:
(703) 894-2774 i
1 2
3 4
5 No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence 92-01 920110 S
696.0 B
4 N/A SB SG S/G inspections and maintenance. planned.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Exanination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
- ~
Page 1
of __1
' ';IT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-338 _
Report Month February Unit Namo:
NA-1 Year: _L912_ Date: March 2.
1992 Completed by:
Cathie Mladen
- 92-01 January 10, 1992 Unit in Mode 5 for planned inspection and maintenance of Steam Generators.
I l
l
d fa e
NORTH ANNA POWER STATION-UNIT NO.
1 NONTH:
Februqry S.NEMABLQF_9EKMTING EUIRIENcn Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
D.LtA TiBA DJllLt.A February 01, 1992 0000 Began month with unit in Mode 5.
February 29, 1992 2400 Ended month with unit in Mode 5.
l-
N OPERATING DATA REPCOT DOCKET No.:
50 339 DATE: March 2, 1992 COMPLETED BYs C. MLaden PHONE: (7033 894 2774 OPERAf!kG STATUS 1.
Un i t N ame s................................ N o r t h Anna 2 2.
R epor t i ng Per i odt......................... F ebruery 1992
- 3. ' L i censed T herau l Power (MWt ):..............
2893
- 4.
Norwrplate Rat ing (Gross MWe).............
947 5.
Design Electrical Rating (Wet MWe).......
907 6; Maximun Dependable capacity (Gross We):..
957 7.
Maxisun Dependable capacity (Net MWe)....
909 8.
If changes occur in Capacity Ratings (Items ho 3 thru 7) since last report, give reasons:
N/A 9.
Power level to whleh restricted, if any (Net MWe): _ N/A 10.' Reasons for restrictions, if any..
N/A _
This Munth YtD Cunutative
- 11. Hours in Reportireg Period................................
6%.0 1,440.0 98,280.0
- 12. N m ber of Hours Reactor was criticat.....................
615.0 1,347.1 81,083.0
- 13. Reactor Reserve sburdown Hours.............
28.5 40.4 6,097.8
- 16. Hours Generator 0n-Line..................................
614.2 1,331.2 60,105.6
- 15. Unit Reserve shutdown Nours..............................
0.0 0.0 0.0
- 16. Gross Therw?. Energy Generat ed (MWH)..................... 1,447,877.9 3,431,941.1 215,249,074.2
- 17. Gross Electr ical Energy Generated (MWM)..................
473,570.0 1,121,145.0 70,501,271.0
- 13. Net Electrical Energy Generated (MWM)....................
446,422.0 1,061,723.0 67,561,461 0
- 19. Un i t S erv i c e F ac t or......................................
88.2%
92.4%
81.5%
- 20. Uni t A val t abi l i ty F ac t or.................................
68.2%
92.4% -
01.5%
- 21. Uni t Capac i ty F ac tor (us ing MDC Ne t ).....................
70.6%
81.1%
76.4%
- 22. Uni t capaci ty F actor (us i ng DER Net ).....................
70.7%
81.3%
75.8%
- 23. F or c ed Out age R a t e.......................,...............
0.0%
2.0%
5.9%
- 24. Shutdowns $cheduled over Next 6 Months (Type, Date, and Duration of Each):_N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:
04/24/92
- 26. Units in Test Status (Prior to Consnercial Operation):
Forecast Achieved INITIAL CRIT!CALITY INITIAL ELECTRICITY CtMMERCIAL-OPERATION
t a
AVERAG:: DAILY UNIT POWER LEVEL Docket No.:
50-339 Unitt NA-L Datat March 2.
1992 Completed byt_ C. M1gsten Phonet (703) 894-2774 MONTHS February 1992 DAY AVERAGE DAILY POWER DAY AVEIGGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWe-Het) 1
_ _ _. 772 17 705 2
787 18 702 3
785 19 699 4
785_
20 M6 S
784 21 693 6
781 22 691 7
778 23 689 8
751 24 674 9
754 25 638 10 751 26 3'11 11 750 27 0
12 747 2B 0
13 739 29 0
~
14 704 15 710 16 707 i*ns tructions:
On this format, list the average daily unit power level in MWe-
. Net for each day in the reporting month.
Compute to the nearest whole megawatt.
~
I
~
' UNIT SHUTDOWNS AND POWER REDUCTIONS
. DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: March 2, 1992 REPORT MONTH:. February 1992 COMPLETED BY:
C. Mladen J !
PHONE:
(703) 894-2774 1
2 3
4 5
No.
Date Tyne Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report /
Prevent Recurrence 92-03 920226 S
81.8 C
1 N/A N/A N/A Unit shutdown in preparation for refueling.
S/G i
maintenance / inspection planned.
l t
[
i i
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator. Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
--4
c
- =,
a
)
.Page 1
of. \\
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation-Sheet-Docket'No.:
50-339 Report Month Eg.bruary Unit Name NA-2 Years 1992~
Date March 2.
1992 Completed by:
Cathi.e Mladen
- 92-03 February-26, 1992 Main Generator taken off-line at 1413 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.376465e-4 months <br /> in preparation for refueling outage. Unit entered Mode 3 at 1501 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.711305e-4 months <br />.
February _27, 1992 Unit entered Mode 4 et 0449 hours0.0052 days <br />0.125 hours <br />7.423942e-4 weeks <br />1.708445e-4 months <br />.
Unit entered Mode 5 _
j at 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br />.
t
- l I
I i
J 9-P"d g
y*-
wW-/ e y
'T q wpg'getry gespw e f Ti.r' y' 4 r "P
W+e yrug *ygy ghret WT yt et 1
- y-t-1r 3 ppg r pg'-g e 63rg grgy M1 egM -g 7--
'.'44 NORTH ANNA POWER. STATION UNIT'NO.t.
2 MONTH:
February' JUMMARY OF OEEBATING EXPERI.EEQE i
- Listed bel'ow in chronological sequence. is a
summary - of 1 operating experiences for this month which required load reductions
-or resulted in'significant'non-load related incidents.
i DAt_t.
Tim.,
pata February 01,- 1992.
-0000 Began month with unit at 86% power, 81SMWe.
February 26, 1992 1413 Main Generator taken off-line in preparation for refueling outage, 1501 Unit entered Mode 3.
-February 27, 1992
_0449 Unit entered Mode 4.
1930 Unit entered Mode 5.
February'29, 1992 2400' Ended month with unit in Mode 5.
l t
1 T
I.'
l-l 1
j..
I g
4 m
--+eI m-f y
W r.
Le w
w t4 T
t-w Rovised Pages for December 1991 and January 1992 North Anna Unit 1 Monthly Operating Raports l
i l
l l
l' 5
.