- _ _ _ _ _ _ _

e

![os ucylo UNITE D STATES g

NUCLEAR REGULATORY COMMISSION 3.cn c.

.f WASHING TON, D. C. 20$b5

\\...../

SAFETY EVALVATION BY THE OfflCE OF NUCL.[.A.R REACTOR REGUL ATION R((A]{0 TO AMENDENT NO. 64 10 FACILITY OPERATING LICENSE NO. NPf-49 UORTHEAST NUCLEAR ENERGY COMPANY. ET AL.

MILLSTONE NUCLEAR POWER STATION. UNIT NO. 3 DOCKET N0. 50-423

1.0 INTRODUCTION

By letter dated March 28, 1990, as supplemented July 24, 1990, and November 22, 1991, the Northeast Nuclear Energy Company (NNECO, the licensee), proposed several revisions to Technical Specifications (TS) for Millstone, Unit 3, on emergency diesel generator (EDG) surveillance testing, The licensee introduced these proposed changes for the following reasons:

Conformance to Generic Letter (GL) 84-15 in order to improve overall diesel generator reliability and performance.

Reduce the diesel generator loading criteria to compensate for instrumentation inaccuracies and meter reading errors in order to ensure that operations at the upper limit of the load band do not lead to overload conditions.

The requested changes would modify TS 3/4.8,1 "A.C. Sources" to include provisions to eliminate the fast, cold, repetitive starting of the diesel generators. Additional changes proposed in TS 3/4.8.1 and its Bases concern' instrumentation and test standards.

In addition, proposed changes clartfy the remedial measure for inoper-ability of the required full capacity Lattery chargers.

By letter dated November 22, 1991, the licensee withdrew certain changes prope:;ed in the March 25, 1990, letter, specifically, error bands in loading the diesel generator (TS 4.8.1.1.2.a.6), and a target value in surveillance test loading of the diesel generator (TS 4.8.1.1.2 9 7).

l l

l l

i 9203170164 920309 l

PDR ADOCK 05000423 l.

P PDR i

~2-2.0 EVALUATION, gecification3.8.1.1 The licensee proposes to add a footnote denoted by *" to indicate that the designated test is required to be completed regardless of when the inoperable diesel generator is restored to operability. This change is consistent with the Standardized Technical Specifications (STS) and is acceptable.

The licensee also proposes for Action Statements 3.8.1.1.c. 3.8.1.1.e. and 3.8.1.1.f to add a statement directing the use of either Action Statement a or b as appropriate when only one power source remains inoperable.

In addition, a statement is added specifying that a successful test of the diesel generator operability per Surveillance Requirement 4.8.1.1.2.a.5 when a diesel generator has been restored to operable status, satisfies the diesel generator test requirement of Action Statement a or b as appropriate. These changes are administrative _in nature and do not alter the original intent of the subjtet Specif Nations. Therefore, these changes are acceptable.

Action Statement 3.8.1.1.a This action statement currently addresses either one inoperable offsite circuit or one inoperable diesel generator. The licensee proposes to revise this section to exclusisely address one inoperable offsite circuit.

In addition, the time required for performing Surveillance Requirement 4.8.1.1.2.a.5, to verify operability of the diesel generators, is being extended from the current time period to initiate action within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter to within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if tl+ diesel generator had not been successfully tested in the past 24 hnurs. The staff finds the above T5 changes to be in conformance with GL 84-157nd acceptable.

Action Stctement

.8.1.1.b The new action statement is added as a result of the proposed change to Action Statement 3.8.1.1.a to address the loss of a diesel generator separate from the loss of an offsite circuit. The licensee also proposes to extend the time required for performing Surveillance Requiremant 4.8.1.1.2.a.5, to verify operability of the remaining diesel generator, f rom the current time period to initiate 6ction within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter to within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if the diesel generator became inoperable f or any cause other than preplanned maintenance and testing. The above 15 change is in conformance with STS. The statf finds this change acceptable.

Action Statement 3.8.1.1.c This action statement addresses one inoperable offsite circuit and one inoperable diesel generator. The licensee proposes to revise this section to extend the time required for performing Surveillance Requirement 4.8.1.1.2.a.5, to verify operability of the remaining diesel generator, from the current i

time period to initiate action within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter l

l

. _ = _ _ _ - -.

to within F heurs if the diesel etnerator became inoperable for any cause other ih'aii p'r'e'p%I)iId'i'a%TeitaiiTe**a'n*d'I'e'sY41Io*%E abbEe'TT' changes are Tn con 1on.ance

~

Lith 5T5. TW'sYaTT TWds'tWe'sE*ch'ah*ges acceptable.

Action Statement 3.8.1.1.e This action statement addresses two inoperable offsite circuits.

The licensee proposes to revise this section to extend the time required for performing Surveillance Requirement 4.8.1.1.2.a.5, to verify operability of the two diesel generators, from the current time period to initiate action within 1 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter to within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

The stafi finds the hour and once every'b'e'li"c'o'nTo~rilial'cE wit h GL E4-15"a'n'd' acceptable.

above 15 ch'e'n'g'e's7o e Section 4_.r.),.J,.2 The licensee proposes to add a new footnote to the subject Specification.

The footnote denoted by "" states that the manufacturer's reconenendations will be followed for surveillance tests unless otherwise specified by individual surveillance requirentnts. The subject change does not affect the intent of the original TS, and is therefore acceptable.

Surveillance R,c;quirement 4.8.1.1.2.a he liccosee proposes the following changes to the monthly diesel gererator srveillance specification:

Change Specification 4.8.1.1.2.a.5 to gradually accelerate the dksel generator to rated speed and remove the 11-second start time criterion.

The proposed change is consistent with GL 84-15 and is acceptable.

Action Statement 3.8.2.1.b The prepcsed change is the same as existing ACTION statement "a" and prevides consistency, and also makes clear the need for charger operability if the battery bank is to be considered operable. This change is in the conservative direction and adds consistency. The staff therefore finds this change acceptable.

3.0 STATE CONSULTATION

In accordance with the Conunission's regulations, the Connecticut State official was notified of the proposed issuance of the an.endment. The State I

official had no cornents.

4.0 Egjf,0F!1,Ep,Tg,,00p,S_10E R AT 10N Fursuant to 10 CFR 51.21, 51.32, and 51.35, an environmental assessment and finding of no significant impact have been prepared and published in the federal Rtgisti,r on March 9, 1992 (57 FR 8369)

Accordingly, based upon the ~

~ _ _ _ _ _ -. _.. _ _., _

_ -.-- _ __~._ _. _., - - _

.~

~ '

T- '

P environmental assessment, we have determined that the issuance of the amendment will not have a significant effect on the quality of the human environment.

5.0 CONCLUSION

We have reviewed the licensee's submittals and have concluded that the changes for diesel generator surveillance testing meet GL 84-15 guidance and constitute acceptable practices to improve overall dietel generator reliability and performance, and are acceptable.

The Coenission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operatict, ir. the proposed manner, (2) such activities will be conducted in compliance with the Conmission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor:

R. V. Jenkins Date:

March 9, 1992 l