ML20090J246

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Items Supplied by Tube-Line Corp.Final Rept Will Be Submitted by 840615.Extension Granted in 840423 Telcon Between TR Loomis & W Lazerus
ML20090J246
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/04/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(NMP2L-0045), (NMP2L-45), NUDOCS 8405220399
Download: ML20090J246 (1)


Text

Y NI RA u

AWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE N.Y.13202/ TELEPHONE (315) 474-1511 May 4,1984 (NMP2L0045)

Mr. R. W. Starostecki, Director U. S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Starostecki:

SUBJECT:

Nine Mile Point Unit 2 Docket No. 50-410 The final report in accordance with 10CFR50.55(e) concerning items supplied by Tube-Line Corporation will be submitted to the Nuclear Regulatory Commission by June 15, 1984, rather than April 30, 1984, as previously conunitted. This extension was granted in a telephone conversation between Mr.

T. R. Loomis (Nine Mile Point Unit 2 Licensing) and Mr. W. Lazerus of your staff on April 23, 1984.

Very truly yours, C

Vice President Nuclear Engineering and Licensing CVM/TRL:lf cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. Gramm, Resident Inspector 840 go 0 000 o

8 L

FM