ML20090H359

From kanterella
Jump to navigation Jump to search
Potential Const Deficiency Rept Re Basler Electric Co Resistors Installed in Emergency Diesel Generators.Initially Reported on 830901 & Reported by Vendor Under Part 21 on 830819.Final Rept Expected by 831130
ML20090H359
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/30/1983
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-PT21-83-078-000 PT21-83-078-000, PT21-83-78, NUDOCS 8310280093
Download: ML20090H359 (2)


Text

. .

N e

Public Service Electric and Gas Company Thomas J. Martin 80 Park Plaza, Newark, NJ 07101 201430-8316 Mailing Address: P.O. Box 570, Newark, NJ 07101 vica President Eng;neering and Construction September 30, 1983 Dr. Thomas E. Murley, Administrator U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement

. Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Dr. Murley:

POTENTIAL CONSTRUCTION DEFICIENCY OUESTIONABLE D/G RESISTORS HOPE CREEK GENERATING STATION On September 1, 1983, a verbal report was made to Region I, Office of Inspection and Enforcement representative Mr. E. C. McCabe, advising of a potentially significant construction deficiency concerning resistors installed in our Emergency Diesel Generators. The following interim report is provided in accordance with the requirements of 10CPR50.55(e).

On August 19, 1983, Basler Electric Company of Highland, Illinois, reported to the Nuclear Regulatory Commission, via 10CFR21, a problem with four-Watt 4,000 ohm resistors used in safety-related systems. On the Hope Creek Project this resistor is used in the exciter section of our Emergency Diesel Generators. The supplier reports high-temperature failure of these resistors. Basler Electric is a sub-supplier of Colt Industries, the manufacturer of our Emergency Diesel Generators.

Bechtel Power Corporation, our Architect / Engineer and Constructor, has requested Colt Industries to provide all necessary information for the requisita safety analysis and to define the remedial actions to be taken, as applicable.

0310200093 830930 PDR ADOCK 05000354 PDR S

N y% i f s\e

m o

Dr. T. E. Murley 9/30/83 A final report conveying the results of our safety analysis and our corrective actions will be submitted to your office by November 30, 1983.

Very truly yours, T g CC: Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.

NRC Resident Inspector - Hope Creek P. O. Box 241 Hancocks Bridge, N.J. 08038 f

A08 1/2 l