ML20090H359
| ML20090H359 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 09/30/1983 |
| From: | Martin T Public Service Enterprise Group |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| REF-PT21-83-078-000 PT21-83-078-000, PT21-83-78, NUDOCS 8310280093 | |
| Download: ML20090H359 (2) | |
Text
.
N e
Public Service Electric and Gas Company Thomas J. Martin 80 Park Plaza, Newark, NJ 07101 201430-8316 Mailing Address: P.O. Box 570, Newark, NJ 07101 vica President Eng;neering and Construction September 30, 1983 Dr. Thomas E. Murley, Administrator U.S.
Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Dr. Murley:
POTENTIAL CONSTRUCTION DEFICIENCY OUESTIONABLE D/G RESISTORS HOPE CREEK GENERATING STATION On September 1, 1983, a verbal report was made to Region I, Office of Inspection and Enforcement representative Mr.
E. C. McCabe, advising of a potentially significant construction deficiency concerning resistors installed in our Emergency Diesel Generators.
The following interim report is provided in accordance with the requirements of 10CPR50.55(e).
On August 19, 1983, Basler Electric Company of Highland, Illinois, reported to the Nuclear Regulatory Commission, via 10CFR21, a problem with four-Watt 4,000 ohm resistors used in safety-related systems.
On the Hope Creek Project this resistor is used in the exciter section of our Emergency Diesel Generators.
The supplier reports high-temperature failure of these resistors.
Basler Electric is a sub-supplier of Colt Industries, the manufacturer of our Emergency Diesel Generators.
Bechtel Power Corporation, our Architect / Engineer and Constructor, has requested Colt Industries to provide all necessary information for the requisita safety analysis and to define the remedial actions to be taken, as applicable.
0310200093 830930 PDR ADOCK 05000354 S
PDR N
i y%
f s\\e
m o
Dr. T.
E.
Murley 9/30/83 A final report conveying the results of our safety analysis and our corrective actions will be submitted to your office by November 30, 1983.
Very truly yours, T
g CC:
Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.
C.
NRC Resident Inspector - Hope Creek P. O.
Box 241 Hancocks Bridge, N.J.
08038 f
A08 1/2 l