ML20090G488
ML20090G488 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 07/16/1984 |
From: | STONE & WEBSTER ENGINEERING CORP. |
To: | |
Shared Package | |
ML20090G465 | List: |
References | |
NUDOCS 8407240499 | |
Download: ML20090G488 (221) | |
Similar Documents at Crystal River | |
---|---|
Category:NON-RECURRING TECHNICAL REPORT (ENVIRONMENTAL)
MONTHYEARML20154C5791998-10-0101 October 1998
[Table view]Biological Assessment of Impact to Sea Turtles at FPC Crystal River Energy Complex ML20211Q0071986-12-31031 December 1986 Rept on Reactor Vessel Matl Surveillance Capsules, for 1986 ML20079N1941985-01-31031 January 1985 Demonstration Final Rept Jan 1985 ML20079N2761985-01-15015 January 1985 Final Rept Crystal River 316 Studies,850115 ML20090G4881984-07-16016 July 1984 Fourth Quarterly Progress Rept,Crystal River Studies 840702 ML19207B4651979-04-19019 April 1979 Draft Offsite Dose Calculation Manual ML19319D2001978-03-22022 March 1978 Environ & Cost/Benefit Assessment for Facility High Density Spent Fuel Storage Racks. ML19308D6541976-05-31031 May 1976 App 1 Analysis for Facility. ML19319D1321975-06-20020 June 1975 Predicted Thermal Plume Resulting from Operation of Units 1,2 & 3. ML19319D1551975-02-28028 February 1975 Summary Analysis & Supplemental Data, Rept to Interagency Research Advisory Committee ML19319D1381974-10-31031 October 1974 Environ Considerations, Vol 1, Final Rept to Interagency Research Advisory Committee ML19319D1431974-10-31031 October 1974 Environ Considerations, Vol 2,final Rept to Interagency Research Advisory Committee ML19319D1451974-10-31031 October 1974 Environ Considerations, Vol 3,final Rept to Interagency Research Advisory Committee ML19319D1491974-10-31031 October 1974 Environ Considerations, Vol 4,final Rept to Interagency Research Advisory Committee ML19308D9941973-07-31031 July 1973 Proposed Plankton & Water Quality Programs at Facility. ML19308D6421973-07-13013 July 1973 Verification Study of Dames & Moore Hurricane Storm Surge Model. ML19308D6671973-07-11011 July 1973 Facility Hurricane Study. ML19308D8281973-06-11011 June 1973 Facility Environ Research Program to Meet Current Federal Requirements. ML19308D7551973-03-0505 March 1973 Environ Research Programs at Facility:Technical Discussion. 1998-10-01 Category:TEXT-ENVIRONMENTAL REPORTS MONTHYEARML20217E3991999-10-12012 October 1999
[Table view]Rev to App B Environ Protection Plan TS Pages,Incorporating Biological Opinion Issued by Natl Marine Fisheries Svc. Requirements from Biological Opinion Issued by Natl Marine Fisheries Svc 3F0999-26, NPDES Noncompliance Notification:On 990826,permitted Release of SDT-1 (I-FG) to Nuclear Svcs Seawater Sys (D-OF), Occurred.Required Sample Not Obtained Due to Failure of Technician to Collect Sample.Release of SDT-1 Was Diluted1999-09-28028 September 1999 NPDES Noncompliance Notification:On 990826,permitted Release of SDT-1 (I-FG) to Nuclear Svcs Seawater Sys (D-OF), Occurred.Required Sample Not Obtained Due to Failure of Technician to Collect Sample.Release of SDT-1 Was Diluted 3F0899-22, NPDES Noncompliance Notification:On 990714,cooling Towers Tripped Off Line.Caused by Failure of Transformer Providing Power to Cooling Towers Pumps.Reduced Load Causing Temp Measured at Point of Discharge to Begin Trending Downward1999-08-30030 August 1999 NPDES Noncompliance Notification:On 990714,cooling Towers Tripped Off Line.Caused by Failure of Transformer Providing Power to Cooling Towers Pumps.Reduced Load Causing Temp Measured at Point of Discharge to Begin Trending Downward ML20209H9641999-07-15015 July 1999 Environ Assessment & Finding of No Significant Impact Re Issuance of Exemption That Would Reduce Amount of Onsite Property Insurance Based on Permanently Shutdown Status of TMI-2 & That Plant Suitable for Long Term Management ML20202A7051999-01-0808 January 1999 Revised NPDES Permit FL0000159,issued to FPC ML20206R6281998-12-31031 December 1998 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3 ML20206F5541998-12-31031 December 1998 Radioactive Effluent Release Rept - 1998 ML20206A9191998-12-31031 December 1998 FPC Annual ITS Dose Rept for Period Jan-Dec 1998 ML20154C5791998-10-0101 October 1998 Biological Assessment of Impact to Sea Turtles at FPC Crystal River Energy Complex ML20154C5851998-09-28028 September 1998 Environ Assessment & Finding of No Significant Impact Re DPR-72.Proposed Action Would Exempt Licensee from 10CFR50 App K,Section I.D.1, Single Failure Criteria 3F0798-19, NPDES Noncompliance Notification:During June 1998,limit of Copper from Fl State Water Quality Standard Fl Admin Code 62-302.530 Was Exceeded.Potential Resolutions to Issue Are Being Investigated by FPC1998-07-28028 July 1998 NPDES Noncompliance Notification:During June 1998,limit of Copper from Fl State Water Quality Standard Fl Admin Code 62-302.530 Was Exceeded.Potential Resolutions to Issue Are Being Investigated by FPC 3F0698-13, NPDES Noncompliance Notification:On 980502,observed Small Kemps Ridley Turtle Lodged Against Plant Intake Structure Bar.Efforts to Rescue Turtle Failed & Dead Turtle Was Found on 980512.Established 24 H Observation & Rescue Program1998-06-0808 June 1998 NPDES Noncompliance Notification:On 980502,observed Small Kemps Ridley Turtle Lodged Against Plant Intake Structure Bar.Efforts to Rescue Turtle Failed & Dead Turtle Was Found on 980512.Established 24 H Observation & Rescue Program 3F0598-03, NPDES Noncompliance Notification:On 980401,util Reported Mortality of Endangered Species Sea Turtle.Cause Unknown. Contributing Factor Could Be Change in Prey Abundance. Established 24 H Observation1998-05-0101 May 1998 NPDES Noncompliance Notification:On 980401,util Reported Mortality of Endangered Species Sea Turtle.Cause Unknown. Contributing Factor Could Be Change in Prey Abundance. Established 24 H Observation 3F0398-27, NPDES Noncompliance Notification:On 980223,sample Was Discarded Before Apparent Exceedence Was Recognized Preventing Reanalysis.Caused by Analytical Procedure. Procedure Will Be Changed to Include Noted Value Types1998-03-26026 March 1998 NPDES Noncompliance Notification:On 980223,sample Was Discarded Before Apparent Exceedence Was Recognized Preventing Reanalysis.Caused by Analytical Procedure. Procedure Will Be Changed to Include Noted Value Types 3F0498-08, FPC Annual ITS Dose Rept for Period 970101-12311997-12-31031 December 1997 FPC Annual ITS Dose Rept for Period 970101-1231 ML20206F5591997-12-31031 December 1997 Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997 3F0598-05, Annual Radiological Environ Operating Rept for 1997, for Crystal River 31997-12-31031 December 1997 Annual Radiological Environ Operating Rept for 1997, for Crystal River 3 ML20247A3461997-12-31031 December 1997 Radioactive Effluent Release Rept - 1997 ML20036D9251997-10-29029 October 1997 Environ Assessment & Finding of No Significant Impact Re Exemption from Certain Requirements of App R, FP Program for Nuclear Power Facilities Operating Prior to 790101 ML20212F2061997-10-22022 October 1997 Environ Assessment & Finding of No Significant Impact Re Issuance of Exemption from Certain Requirements of Section Iii,Paragraph G, FP of Safe Shutdown Capability, of App R, FP Program for Npfs Operating Prior to 790101, to 10CFR50 ML20211F8391997-09-29029 September 1997 Add 1 to NPDES FL0000159/IT09-154804F for Plant Re Wastewater Generated at Outfall Serial Number 015 (Osn 015) from Mariculture Ctr (Fish Hatchery) ML20210S4721997-07-31031 July 1997 Addendum 1 to NPDES Permit FL0000159/IT09-15480F for Plant to Wastewater from Fish Hatchery ML20151K1581997-07-31031 July 1997 NPDES Noncompliance Notification:On 970623,sample Obtained Indicated Exceedence of POD Oil & Grease.Caused by Ommission of Analytical Procedure.Steps Will Be Taken to Determine Technician'S Error ML20151K1451997-07-31031 July 1997 NPDES Noncompliance Notification:Effluent Discharge Data for June 1997 Indicated Biological Oxygen Demand for Five Days Value of 12.0 mg/1.Caused by Mixing W/Water in Ditch Sys ML20151K1531997-07-31031 July 1997 NPDES Noncompliance Notification:Effluent Discharge Data for June 1997 Indicated Instantaneous Max Temp of 97.2 F.Caused by Inoperative Tide Level Indicator,Incoming Tide & Westerly Wind.Tide Level Indicator Returned to Service 3F0597-01, FPC Crystal River,Unit 3 Annual Radiological Environ Operating Rept,19961996-12-31031 December 1996 FPC Crystal River,Unit 3 Annual Radiological Environ Operating Rept,1996 ML20138G7281996-12-31031 December 1996 Radioactive Effluent Release Rept 1996 3F0497-06, FPC Annual STS Dose Rept for Period 960101-12311996-12-31031 December 1996 FPC Annual STS Dose Rept for Period 960101-1231 3F0596-09, 1995 Annual Radiological Environ Operating Rept1995-12-31031 December 1995 1995 Annual Radiological Environ Operating Rept ML20108C5851995-12-31031 December 1995 Radioactive Effluent Release Rept 1995 FPC Crystal River - Unit 3 3F0496-29, Whole Body Exposure for CY951995-12-31031 December 1995 Whole Body Exposure for CY95 ML20095C9501995-12-0505 December 1995 Environ Assessment & Finding of No Significant Impact Re Fuel Enrichment Increase.Eis Unwarranted ML20091P0171995-08-28028 August 1995 Environ Assessment & Finding of No Significant Impact Re Exemption from Requirements of 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors 3F0595-15, Annual Radiological Environ Operating Rept 19941994-12-31031 December 1994 Annual Radiological Environ Operating Rept 1994 3F0495-20, Radioactive Effluent Release Rept 1994 Crystal River Unit 31994-12-31031 December 1994 Radioactive Effluent Release Rept 1994 Crystal River Unit 3 ML20072U8631994-09-0606 September 1994 Environ Assessment & Finding of No Significant Impact, Re Issuance of Exemption from Certain Requirements Concerning Regulations to License DPR-72 3F0294-20, Semiannual Radioactive Effluent Release Rept Jul-Dec 1993 for Crystal River Unit 31993-12-31031 December 1993 Semiannual Radioactive Effluent Release Rept Jul-Dec 1993 for Crystal River Unit 3 ML20058K0181993-12-0303 December 1993 Environ Assessment & Finding of No Significant Impact Re Issuance of Amend to License DPR-72.Amend Will Replace Existing TSs in Entirety W/Improved TSs 3F0893-15, Semiannual Radioactive Effluent Release Rept,Crystal River, Unit 3 for Jan-June 19931993-06-30030 June 1993 Semiannual Radioactive Effluent Release Rept,Crystal River, Unit 3 for Jan-June 1993 ML20128D7431993-01-31031 January 1993 Us EPA Permit FL0000159 Semi-Annual Rept, for Jan 1993 ML20034F7531992-12-31031 December 1992 Annual Rept of Personnel Exposure Per 10CFR20.407 & TS 6.9.1.5.(a) for CY92 3F0493-18, Annual Radiological Environ Operating Rept1992-12-31031 December 1992 Annual Radiological Environ Operating Rept 3F0293-12, Semiannual Radioactive Effluent Release Rept,Crystal River Unit 3 for Jul-Dec 19921992-12-31031 December 1992 Semiannual Radioactive Effluent Release Rept,Crystal River Unit 3 for Jul-Dec 1992 3F0892-10, Semiannual Radioactive Effluent Release Rept for Jan-June 19921992-06-30030 June 1992 Semiannual Radioactive Effluent Release Rept for Jan-June 1992 ML20090K7361992-03-12012 March 1992 Environ Assessment & Finding of No Significant Impact Re Change to OL to Reflect Transfer of Sebring Utils Commission 0.4473% Ownership Share to Util 3F0492-14, Annual Radiological Environ Operating Rept for 19911991-12-31031 December 1991 Annual Radiological Environ Operating Rept for 1991 3F0292-14, Semiannual Radioactive Effluent Release Rept Jul-Dec 19911991-12-31031 December 1991 Semiannual Radioactive Effluent Release Rept Jul-Dec 1991 ML20092F5521991-12-31031 December 1991 Whole Body Exposure for Calendar Yr 1991 ML20083E7921991-09-19019 September 1991 Environ Assessment & Finding of No Significant Impact Re Util Request for Exemption from Requirements of Section III.D.2(a) & III.D.3 of App J to 10CFR50 for Facility ML20082K7901991-06-30030 June 1991 Semiannual Radioactive Effluent Release Rept 910101-0630 1999-09-28 Category:TEXT-SAFETY REPORT MONTHYEARML20217G0191999-10-15015 October 1999
[Table view]Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair 3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated1999-10-13013 October 1999 Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated ML20217B0931999-10-0606 October 1999 Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue ML20212L0881999-10-0404 October 1999 SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 ML20212J8941999-10-0101 October 1999 Safety Evaluation Supporting Amend 188 to License DPR-72 ML20212J8631999-10-0101 October 1999 Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) ML20212E9031999-09-30030 September 1999 FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With ML20212E6911999-09-21021 September 1999 Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20212B6821999-09-13013 September 1999 Safety Evaluation Supporting Amend 187 to License DPR-72 ML20211P0661999-09-0808 September 1999 SER Accepting Proposed Transfer of License to Extent Held by City of Tallahassee to Fpc,Plant,Unit 3 ML20211L3881999-09-0303 September 1999 Safety Evaluation Supporting Amend 186 to License DPR-72 ML20212C1501999-08-31031 August 1999 Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20211L1321999-08-31031 August 1999 EAL Basis Document ML20211C2911999-08-23023 August 1999 Safety Evaluation Supporting Amend 185 to License DPR-72 ML20210U8461999-08-16016 August 1999 Safety Evaluation Supporting Amend 184 to License DPR-72 ML20211B7291999-08-16016 August 1999 Rev 2 to Cycle 11 Colr ML20210S6791999-08-12012 August 1999 Safety Evaluation Supporting Amend 183 to License DPR-72 ML20210S9831999-08-11011 August 1999 Safety Evaluation Supporting Amend 182 to License DPR-72 ML20210P1111999-08-0505 August 1999 SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 ML20209F5601999-07-31031 July 1999 EAL Basis Document, for Jul 1999 ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 ML20210G1611999-07-27027 July 1999 Safety Evaluation Supporting Amend 181 to License DPR-72 05000302/LER-1999-003, :on 950902,operation Prohibited by ITS Was Noted.Caused by Inadequate Development of Instrumentation Specification.Issued Short Term Instruction & Clarification of ITS Bases.With1999-07-0101 July 1999
3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With ML20203A4381999-02-0303 February 1999 Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50 ML20206E9261998-12-31031 December 1998 Gainesville Regional Utilities 1998 Annual Rept ML20206E9891998-12-31031 December 1998 Kissimmee Utility Authority 1998 Annual Rept 1999-09-08 |