Text
-
.i..
NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /300 ERIE DOULEVARD WEST. SYRACUSE, N Y.13202/ TELEPHONE (315) J74-1511 July 6, 1984 (NMP2L 0105)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Comnission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning feedwater valves furnished by Velan Valve Corporation (55(e) 22).
Tnis problem was reported via telecon to W. Lazerus of your staff on June 13, 1984.
Sincerely,
. Lem Vice President Nuclear Generation TEL/TRL:djm Enclosure xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 R. Gramm (NRC Resident) 8407190394 B40706 PDR ADOCK 05000410 S
PDR N
s, x.
o NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Velan Valves - Feedwater System (55(e)-84-22)
Description of the Problem During a review of documentation, it was observed that the certified material test reports (CMTRs) provided by the valve manufacturer did not document the test coupon heat treatment duration and temperature as required by ASME Section III, NB-2211. Further inquiry revealed that the heat treatment of the test coupons was in fact not performed.
The matter is still being investigated and a final report will be submitted by November 26, 1984.