To:
James P. O'Reilly s f, Directorate of Regulatory Operations l ZI g, if Region I 631 Park Avenue
l
,,', l King of Prussia, Pennsylvania 19406
-, f . '.x
.i,4 n; g 7,,
From:
Jersey Central Power 6 Light Company Oyster Creek Nuclear Generating Station Docket #50-219 Forked River, New Jersey 08731 Subject Abnormal Occurrence Report No. 50-219/75/5 incfo1Jowing$sapreliminaryreportbeingsubmitted in compliance with the Technical Specifications, paragraph 6.6.2.
Preliminary Approval:
/
Q/w Mn.+h.s// 7.f J'. T. Carroll, Jr. /
Date
/
cc: Mr. A. Giambusso 2[3d 8303020427 750306 PDR ADOCK 05000219 8
?
O Da(Q'/
Init ial Telephone tc of Report luto:
3/6/75 Occurrence:
3/6/75 Initial Written Time of Report Date:
3/6/75 Occurrence:
0950 OYSTER CREEK NUCLEAR GENERATING STATION FORKED RIVER, FEW JERSEY 08731 Abnormal Occurrence Report No. 50-219/75/5 IDENTIFICATION Failure of containment spray pump 51A to start when called 0F OCCURRENCE:
upon to do so.
This event is considered to be an abnormal occurrence as defined in the Technical Specifications, paragraph 1.15D.
CONDITIONS PRIOR X Steady State Power Routine Shutdown TO OCCURRENCE:
Hot Standby Operation Cold Shutdown Load Changes During Refueling Shutdown Routine Power Operation Routine Startun Other (Specify)
Operation Poucr:
n: etar,1 ^; :".?L Electric, 665 Mh'c 4
Flou:
Recirculation, 615.8 X 10 8PM Feed, 7.67 X 10 lb/hr Stack Gas:
29,600,uci/sec DESCRIPTION OF It was observed on Thursday, March 6,1975, at 0950, during OCCURRENCE:
the monthly surveillance test of the containment spray system that containment spray pump 51A failed to start in the automatic mode when subjected to simulated low-low reactor water Icyc1 and high drywell pressure signals.
It was observed that the " pump failure" alarm initiated approximately 64 seconds after the start signal was applied. An operability check was performed on the redundant System 1 Containment Spray Pump 518.
Containment Spray Pump 51A was then removed from scr. ice for-investigative analysis as to the cause of the failure.
l l
t
i O
O Abnomal Occurrence Pace 2 Report N,o. 50-219/75/5 APPAIENT CAUSE Design Procedure 4
0F OCCURRENCE:
!fanufacture Unusual Service Condition Installation /
Inc. Environmental Construction.
Component Failure Operator other (Specify)
~
The cause of the occurrence is presently under investigation.
l ANALYSIS OF The only significance associated with the failure of 51A to OCCURRENCE:
start is in a 2oss of system redundancy. Ilad conditions 4
arisen requiring containment spray, pump 51C would have started i
nutomatically and performed the containment heat removal function.
1 4
In addition, the manually initiated backup pump.51B.for System I was checked to be operabic and could have been initiated.
The containment heat removal function can be adequately supplied hv a sinolo conteinnont spray pump.
i CORRECTIVE The failure monitor installed as the result of a similar ACTION:
occurrence on October 21, 1974 functioned during this event nnd the information obtained is under analysis in an effort to i g determine the cause.
FAILURE liATA:
Previous abnormal occurrences involving the containment spray system:
4 1.
Abnormal Occurrence Report No. 50-219/75/3 2.
Abnormal Occurrence Report No. 50-219/74/55 3.
Abnormal Occurrence Report No. 50-219/73/12 4.
Abnormal Occurrence Report No. 50-219/72/12 i