Second Interim Deficiency Rept Re Length of in-core Monitoring Sys Piping & Gauge.Initially Reported on 831230. All Deficient in-core Tubes Remeasured.Final Rept Expected by 841120
ML20090A636
Person / Time
Site: Bellefonte 
Issue date: 06/28/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8407120055
Download: ML20090A636 (2)


Text

r TENNESSEE VALLEY AUTHORITY CHATTANOOoA TE49ESSEE 37401 400 Chest % 'Sblet Tower II gt\\ h June 28,1984 BLRD-50-438/84-05 U.S. Nuclear Regulatory Commission Region II Attnt Mr. James P. O'Reilly, Regional Administrator 101 Mariotta Street, NW, Suite 2900 Atlanta, Georgia 30323 Dear Mr. O'Reillyt BELLEFONTE NUCLEAR PLANT UNIT 1 - LENGTH OF INCORE MONITORING SYSTEM PIPING AND CAUGE - BLRD-50-438/84 SECOND INTERIM REPORT The subjoot deficionoy was initially rmported to NRC-0IE Inspootor C. A. Julian on Dooomber 30, 1983 in accordanao with 10 CFR 50.55(o) as NCR 2684. This was followed by our interim report dated January 26, 1984.

Enclosed is our second interim report. Wo expoot to submit our next report by November 20, 1984.

If you have any questions, plasso got in touch with R.11. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTil0RITY db L. M. Mills, Manager Nuclear Licensing Enclosure 00: Mr. Richard C. DoYoung, Dirootor (Enclosure)

Offico of Inspootton and Enforooment U.S. Nuoloar Regulatory Comaission Washington, D.C.

20555 Records Contor (Enclosure)

Instituto of Nuoloar Power Operations 1100 Cirolo 75 Parkway, Sutto 1500 Atlanta, Georgia 30339 f)0 h

t Itpg,i<1t p 0

0 01oy ft 2'/ :'

?

ID03-TVA 50tH ANNIVERSARY

'(

An t. qual Opportunity Employer

r ENCLOSURE o

DELLEFONTE NUCLEAR PLANT Ul!AT 1

~

  • o LENGTil 0F INCORE MONITORING SYSTEM PIPING AND GAUGE BLRD-50-43 3/84-05

?lCR 2684 10 CFR 50.55(o)

SECOND INTERIM REPORT Description _of Dorietency All incoro monitoring system piping for unit 1 was out approximately 1-1/2 inches too long as a rarJ1t of an error in establishing the length of the gauge used to measure each pipe. The cause of this deficiency was misinterpretation of lengths of the cortified chain. The first foot is graduated in tenths of a foot and site engineering and QC personnel interpreted this as irchen which resulted in this deficiency.

Interim _ Progress All deficient unit 1 incore tubos have boon remonsured and these dimensions will be evaluated by P1bcock and Wilcox (B&W). TVA will provide a final report upon recolpt of corrootive nation / recommendations from D&'f.