9" *
~
TENNESSE.E VALLEY AUTHORITY CH ATTANOO'GA, TENNESSEE 37401 400, Chestnut Street Tower II b
g3 April 4,1984 BLRD-50-438/84-24 BLRD-50-439/84-23 U.S. Nuclear Regulatoiy Commission Region II Attn:. Mr. Janes P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR' PLANT UNITS 1 AND 2 - STIFFENERS NOT INSTALLED TO REVISED DRAWING REQUIREMENTS - BLRD-50-438/84-24, BLRD-50-439/84 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector D. M. Vercelli on March,8,1984.in accordarce with 10 CFR 50.55(e) as NCR 2922. Enclosed is our first interim report, We expect to submit our next report by July 13, 1984.
If you have any questions, pleasa get in touch with R. H. Shell at FTS 858-2688'.
Very truly yours, TENNESSEE VALLEY AUTHORITY JN L. M. Mills, Manager Nuclear Licensing Enclosure
' cc:. Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection.and Enforcement, U.S.. Nuclear Regulat6ry. Commission Washington, D.C.
20555' Pecords Center (Enclosure)
{
Institute of Nuclear Power Operations, 1100 Circle 75 Parkway, Suite 1500 ' >
' Atlanta, Georgia 30339
^
- z.,
i 4
8404130031 840404
'~
y
,PDR ADOCK 05000430 S.
1 1
AJ 1
PDR i.
OFFIdlAL CDPY
-l
$x
.y.
T67D d
4 1983-TVA'5OTH ANNIVERSARY
[g.
1
')g:
S An Equal OppMtunity Employer N'
$1 Yx
! l:,
a
ENCLOSURE BELLEFONTE IlUCLEAR PLANT UNITS 1 AND 2 e,
STIFFENERS NOT INSTALLED TO REVISED DRAWING REQUIREMENTS BLRD-50-438/84-24, BLRD-50-439/84-23 NCR 2922 i
FIRST INTERIM REPORT Description of Deficiency TVA nonconformance report (NCR) 1894 (BLRD-50-438/82-66, BLRD-50-439/82-59) identified a significant condition adverse to quality (CAQ) in which groove welds, as specified on TVA drawing series 4D'40760-X2, were made as fillet welds. The subject welds are cable tray support welds in the diesel gerterator building (DGB). As corrective action given in the final report to the NRC on NCR 1894, TVA committed to mvise the drawing series 4DWO760-X2 and to mwork the affected supports per those revised drawings. NCR 1894 was closed and signed off as having had all corrective action completed and inspected on June 16, 1983 It has now been identified that none of the affected MK8C cable tray supports in the DGB have been reworked as was required by the disposition of and shown as being completed on the closed NCR 1894.
, Interim Progress TVA will review all cable tray supports which required changes as a result of NCR 1894. These supports will be checked for compliance to present require-ments per the revised drawings series 4DWO760-X2. Work releases will be prepared to correct any deficiencies that are found on the installed supports which have finalized quality control documentation.
m 2
m
- - '