Text
,
.T
~ ~
~
N3 MIRA NIAGARA MOHAWK POWER CORPORATl0N/300 ERIE BoVLEVARo WEST. SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 March 5, 1984 (8129) l J
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I-Division of _ Project and Resident Programs 631 Park Avenue King _of Prussia PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning feedwater piping spools (55(e) 05). This problem was reported via telecon to S. Collins of your staff on February 1,1984.
Very truly yours, C. V. Mangan Vice President Nuclear Engineering & Licensing CVM/MWS:Ja Enclosure-xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission ashington,.DC:20555 W
i -
8404030285 840305 PDR ADOCK 05000410 4
S-PDR 9 [*.6l
..y-NIAGARA M0 HAWK POWER CORPORATION
.)f/
- NINE MILE POINT UNIT 2
^
'I DOCKET N0. 50-410
' Interim Report for a Problem Concerning(55(e) 05)Feedwater Piping Spools Description of the Problem
- During.a: Stone & Webster audit of ITT Grinnell, it was observed that the material used in'the fabrication of some feedwater piping spools did not meet
.all1the. impact testing' requirements of ASME Section III. Certified Material
~
LTest Reports,'for the. material in question, did not document'the test coupon heat treatment. duration and temperature as. required by ASME Section III, NB-2211.
Further inquiry revealed that the heat treatment of the test. coupon was in fact not performed. Eight feedwater pipe spools are'affected.
The material test coupons with the same heat lot numbers as those of the eight feedwater pipe spools have since been heat-treated and impact tested.
Impact
-test results are still being evaluated. Since the matter-is still being investigated,.a final reportLwill be submitted by April 27, 1984.
s
.?
i S
r