ML20087M291

From kanterella
Jump to navigation Jump to search
Rev 2 to McGuire Unit 2 Pump & Valve Inservice Testing Program
ML20087M291
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/16/1984
From:
DUKE POWER CO.
To:
Shared Package
ML20087M267 List:
References
PROC-840316-01, NUDOCS 8403290164
Download: ML20087M291 (13)


Text

_ _ _ _ _ _ _ _ - ._ _ _ _ _ _ _

6 l

DUKE P0kT.R COMPANY McGUIRE NUCIIAR STATION PLMP AND VALVE INSERVICE TESTING UNIT 2 REVISION # 2 8403290164 840316 l PDR ADOCK 05000369 P PDR l

l

A) PUMP: D/G FUEL OIL TRANSFER PUMPS (2A, 2B)

~

SAFETY CLASS: 3 FUNCTION: Diesel generator auxiliary support TEST REQUIREMENT: Test pumps in accordance with Subsection IWP

- BASIS FOR RELIEF: Pumps contain insufficient instrumentation (See Attachment #1) to perform any. meaningful testing 3

in accordance with the intent of Subsection IWP.

ALTERNATE TESTING: Monthly Diesel Generator starting and loading as required by McGuire Technical Specifications is sufficient in assessing the hydraulic condition of the subject auxiliary pumps and demonstrating the capability of the individual components to perform their design function.

The mechanical condition of the subject pumpa will be determined from vibration data to be 1l gathered quarterly. Flow will be monitored by l observing level rir.e in the day tank.

B) PUMP: D/G ROOM SUMP PUMPS (2A2, 2A3, 2B2, 2B3) s SAFETY CLASS: 3 FUNCTION: Water removal from Diesel Generator rooms TEST REQUIREMENT: Test pumps in accordance with Subsection IWP BASIS FOR RELIEF: Pumps contain insufficient instrumentation (See Attachment #1) to perform any meaningful testing in accordance with Subsection IWP.

ALTERNATE TESTING: Due to the anticipated infrequent normal operation of these pumps, quarterly, each pump will be verified to be capable of performing their design function of removing water from the sump at a rate greater than or equal to 419 gpm.

The time which it takes to pump a known volume from the sump is recorded and converted to a flow rate.

McGUIRE - UNIT 2 I.1-3 Revision 1 e

-,-m2.--,c3. - - . - - , - , , , -,,.--,,,,,c. - , , ,,, a, , , . - , y + ,-.- y , + , - ,

V. The Standby Makeup Pump is not safety related and does not receive emergency power. It is required to be tested by McGuire Technical f Specifications. Therefore, the request for relief and alternate testing method is described below.

6T PUMP; STANDBY MAKEUP PUMP (1) l SAFETY CLASS: N/A 6 FUNCTION: To supply makeup to the reactor coolant system if the nErmal system is unavailable.

TEST REQUIREMENT: Test pump in accordance with IWP (Technical Specification requirement)

BASIS FOR RELIEF: Pump contains insufficient instrumentation (see Attachment #1) to perform any meaningful testing in accordance with Subsection IWP.

ALTERNATE TESTING: Pu=p will be verified to be capable of performing its design function on a quarterly basis by verifying that with pump in operation in a test loop that design flowrate can be achieved.

The mechanical condition of the pump will be determined from vibration data to be gathered quarterly.

l McGUIRE-UNIT 2 I.1-3a Revision 2 l l

l

~

$ ;j System: Safety Injection E O e  : "{m a a  ?

%  ? a N A a ~  ? -

$ }l Valve Category u $ Ij Valve Number 0

u Drawing Number u 8 _.

A B C D F'

Y N

F* Remarks 2NI-150B B tlc-2562-3.0 E-7 X CT 10 sec. max. cycle time 2NI-120B B tlC-2562-3.0 J-7 X CT Isolation time $10 sec.

LT 2NI-121A B MC-2562-3.0 J-6 X CT X CS Isolation time $10 sec.

2l l 2NI-122B B MC-2562-3.0 K-4 X CT Isolation time $10 sec.

2NI-128 A MC-2562-3.0 1-4 X X LT X RF FIT 2NI-134 A MC-2562-3.0 11 - 4 X X LT X CS MT 2NI-129 A  ?!C-2562-3.0 I-3 X X LT X CS tlT 2NI-124 A t!C-2562-3.0 I-3 X X LT X RF flT McGUIRE - UNIT 2 11.35-7 Revision 2

0 U System: Safety Injection E O E 3 e a d  ?

? a N 0 5 m $ .

E E Valve Category u 3 U M 0 H

$ Y E

H Valve Number Drawing Number A B C D Remarks 2NI-126 A MC-2562-3,0 J-2 X X LT X CS tlT -

2l 2NI-183B B  !!C-2562-3. 0 G-3 X CT X CS 20 sec. max. cycle time l 2l 2NI-152B B HC-2562-3.0 D-6 X CT X CS 10 sec. max. cycle time l 2NI-159 A HC-2562-3.0 B-4 X X HT X RF LT 2NI-160 A HC-2562-3.0 B-3 X X HT X RF LT 2NI-156 A HC-2562-3.0 D-3 X X LT X RF MT 2N1-157 A MC-2562-3.0 D-2 X X LT X RF HT 2NI-125 A HC-2562-3.0 I-3 X X LT X CS MT McGUIRE - UNIT 2 35-8 '

Q W Revish2 .

_ - _ m - _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ .

e System:

{ Safety Injection 3 0 0 m n 8 3 3 1 "

l 1 a E w a Y Valve Category u

$ d g g 3e g a g e e Valve Number Drawing Number A B C D H " " Remarks 2NI-162A B HC-2562-3.1 K-11 X CT X CS 10 sec. max. cycle time 2NI-171 A HC-2562-3.1 J-7 X X HT X RF LT 2NI-169 A HC-2562-3.1 J-6 X X HT X RF LT 2NI-167 A HC-2562-3.1 J-5 X X HT X RF LT 2NI-165 A HC-2562-3.1 J-3 X X HT X RF LT 2l 2N1-173A B HC-2562-3.1 1-12 X CT X CS 10 sec. max. cycle time l 2NI-175 A HC-2562-3.1 I-8 X X HT X CS l LT i McCUIRE - UNIT 2 II.35-9 Revision 2

m r4 g , y System: Safety Injection E U 0 m 8 8 8 8 s  ?

4 a s m a t 4 -

g g Valve Category g y g Valve Numlier U O $ $ $

Drawing Numl>cr A B C D Remarks 2NI-176 A HC-1562-3.1 11 - 8 X X HT X CS 1.T 2l 2NI-178B B HC-2562-3.1 F-12 X CT X CS 10 sec. max. cycle time l 2NI-180 A HC-2562-3.1 F-6 X X HT X CS LT 2NI-181 A HC-2562-3.1 F-5 X X HT X CS LT 2NI-184B B HC-2562-3.I D-12 X CT X RF 60 sec. max. cycle time 2NI-185A B HC-2562-3.1 B-12 X CT X RF 60 sec. max. cycle time ,

2NI-358A B HC-2562-4.0 C-12 X CT 10 sec. max. cycle time 2NI-244B B HC-2562-4.0 F-18 X CT 3 sec. max. cycle time McGUIRE - UNIT 2 IJ.33-10

O MC-1562-3.0 VALVE: 1NI-121A CATEGORY:. B CLASS: B FUNCTION:

Isolates Train,A of Safety Injection to the Hot Legs TEST REQUIREMENT: Cycle and time valve quarterly BASIS FOR RELIEF: The valve is normally aligned for safety injection with power removed, as required by McGuire Technical Specification 4.5.2. Cycling the valve with the plant in operation requires '

that the power be restored to the valve and moved.from the event-initiation position. The valve is required for ilign-ment for hot-leg recirculation following an accident.. It is not required to automatically actuate on initiation of a safety good.

event. The past test history of the valve is very I ALTERNATE TESTING: Valve will be cycled and timed at cold shutdown.

9 McGUIRE-UNIT 2 O* II;35-26a-Revision ~2-

- New Page

/

...F 9

.-__i_.-__._

O MC-1562-3.0 VALVE: 1NI-152B CATEGORY: B

_ CLASS: B **

FUNCTION:

Isolates Train B of Safety Injection to the Hot Legs TEST REQUIREMENT: Cycle and time valve quarterly.

BASIS FOR RELIEF: The valve is normally aligned for safety injection with power removed, as required by McGuire Technical Specification 4.5.2. Cycling the valve with the plant in operation requires that the power be restored to the valve and moved from the event-initiation position. The valve is required for align-ment for hot-leg recirculation following an accident. It is not required to automatically actuate on initiation of a safety event. The past test history of the valve is very good.

ALTERNATE TESTING: Cycle and time the valve at cold shutdown.

McGUIRE-UNIT 2 II.35-26b Revision 2 New Page

i l

4 MC-1562-3.1 VALVE: 1NI-173A i

CATEGORY: B ' ' '

l CLASS: B i

FUNCTION:

Isolate Train A Residual Heat Removal to the cold legs.

TEST REQUIREMENT: Cycle and time valve quarterly.

BASIS FOR RELIEF: The valve is normally aligned for safety injection with power removed, as required by McGuire Technical Specification 4.5.2. Cycling the valve with the plant in operation requires that the power be restored to the valve and moved from the event-initiation position. The valve is required for alignment for hot-leg recirculation following an accident. It is not 4

required to automatically actuate on initiatien of a safety event. The past test history of the valve is very good.

ALTERNATE TESTING: Cycle and time the valve at cold shutdown.

l 1

l I

McGUIRE-UNIT 2 II.35-30a '

Revision 2' i

I

-New Page 2

,_ . . . - . . - - . , , _ . , ,. ,~. ,, , . . - - , -

~

O MC-1562-3.1 VALVE: 1NI-178B CATEGORY: B CLASS: B IUNCTION:

Isolates Train B of Residual Beat Removal to the cold legs.

TEST REQUIREMENT: Cycle and time valve quarterly.

BASIS FOR RELIEF: The valve is normally aligned for safety injection with power removed, as required by McGuire Technical Specification 4.5.2. Cycling the valve with the plant in operation requires that the power be restored to the valve and moved from the event-initiation position. The valve is required for align-ment for hot-leg recirculation following an accident. It is not required to automatically actuate on initiation of a s event.

The past test history of the valve is very good.

ALTERNATE TESTING: Cycle and time the valve at cold shutdown.

\

McGUIRE-UNIT 2 II.35-30b l Revision 2 New page O

a -m, --

, i.

= .

O MC-1562-3.1 VALVE: 1NI-183B CATEGORY: B ..

CLASS: B FUNCTION: '

Isolates ND flow to the hot legs.

TEST REQUIREMENT: Cycle and time valve quarterly.

BASIS FOR RELIEF: The valve is normally aligned for safety injection ~with power removed, as required by McGuire Technical Specification 4.5.2. Cycling the valve with the plant in operation requires that the power be restored to the valve and moved from the event-initiation position. The valve is required for align-ment for hot-leg recirculation following an accident. It is not required to automatically actuate on initiation of a safety event.

( The past test history of the valve is very gcod.

ALTERNATE TESTING: Cycle and time the valve at cold shutdown.

l J

i 4

McGUIRE-UNIT 2

- II.35-30c.

( Revision 2 New Page.

e L_

l l

MC-2562-4.0 I

r. .

VALVE: 2NI-248, 2NI-249, 2NI-250, 2NI-251, 2NI-252, 2NI-253 CATEGORY: A, C CLASS: A FUNCTION: Open when Reactor Coolant System pressure decreases below 1500 psig during accident conditions.

TEST REQUIREMENT: Verify valves open on flow from upper head injection accumulator.

BASIS FOR RELIEF: The pressure in the UHI accumulator (1500 psig) is not sufficient to open the valves into the Reactor ,

Coolant System (2235 psig). At cold shutdown, the high velocity water could cause damage to reactor internals. This, also, could cause low temperature overpressurizstion.

ALTERNATE TESTING: Valves will be full stroked at refueling by disassembly, c

c e l

l l

t i

i

(  ;.

G McGUIRE - UNIT 2 II.35-31

.