1 Ih j
13 A 8 : 'l 7 rLonio^ eowEn a tiowT courany March 9,1984 L-84-64 Mr. Janes P. O'Reilly Regional Administrator, Region II U.S. Nuclear Regul atory Commission 101 Marietta Street NW, Suite 2900 Atl anta, GA 30303 Daar Mr. O'Reilly:
Re: Turkey Point Unit 3 Docket No. 50-250 IE Bulletin 82-02 Florida Power & Light Company has completed the balance of the actions requested by the NRC in IE Bulletin 82-02 for Turkey Point Unit 3.
The response to action item 3 of the bulletin was previously provided in letter L-82-326 dated August 2,1982.
The written report requested in action item 4 is attached to this letter.
Very truly yours,
/,,
(.. -
/
J.W. Will ans, Jr.
Vice President Nuclear Energy Department JWW/PLP/js Attachment cc:
NRC Document Control Desk Harold F. Reis, Et, quire PNS-LI-84-75 i
l t
l 8403290123 840309 l
l PDR ADOCK 05000250 G
PDR 4
l 8 I o
('
PEOPLE... SERVING PEOPLE
J ATTACHMENT Re: Turkey Point Unit 3 Docket No. 50-250 IE Bulletin 82-02 RESPONSE TO ACTION ITEM 4 a.
Action item 1 has been completed. A summary of this review is provided below:
In response to Action Item 1 of IEB 82-02, maintenance procedures for threaded fastener practices were reviewed. Specific maintenance procedures are in use for all bolted closures of the Reactor Coolant Pressure Boundary with a nominal di aneter of 6 inches or greater (as identified in our first response of August 2, 1982). They are as follows:
MP 3207.4, RHR Motor Operated Stop Valves MOV-750 and MOV-751 Mai ntenance MP 1107.3, Reactor Coolant Pump MP 4107.3, Safety Injection System Check Valve Maintenance MP 1407.7, Reactor Vessel Stud Tensioner Operation, Closure Nut / Stud Removal and Guide Stud Installation MP 1207.8, Pressurizer Manway Cover Removal and Replacanent MP 1507.2, Steam Generator-Primary Manway Cover Removal and Replacenent These existing procedures address the practices described in parts 2, 3, and 4 of Action Iten 1.
Maintenance crew training on threaded f asteners consists of generic instruction on threaded f asteners and gasket practices through FPL's apprentice mechanic training progran. Specific and detailed maintenance instructions for the individual bolted closures in the reactor coolant pressure boundary are given in the maintenance procedures listed above.
Periodically, these procedures are reviewed and discussed by maintenance crews to ensure that the personnel involved are f amiliar with these practices. Training for specialized threaded fasteners is provided as needed and these instructions are compiled based on the manuf acturer's recommend ations.
Threaded fastener lubricants to be used in the reactor coolant pressure boundary are purchased only from vendors on the QA approved suppliers list. These manuf acturers have been audited by FPL's Quality Assurance Department and they follow an approved QA program. The maximum allowable limits for chloride and sulfur content are specified in one of the Quality Assurance Documents, Quality Requirements for Procured Items and Services, and are also referenced in Quality Procedure 40.1, Procurement. All approved suppliers comply with these st and ards. The application of these lubricants on threaded f asteners in the reactor coolant pressure boundary is performed under a Quality Controlled plant work order and in accordance with the procedures listed above.
1 l
I a-
.e-
g b.
The following table identifies the specific connections exmined as required in Action Item 2.
The results of the exmination are also summarized.
Bolted Closures Exmined
- Results Stem Generator Manways No indications Fasteners for stem generator manways were removed and surf ace inspected.
^