Monthly Operating Repts for July 1995 for McGuire Nuclear Station
ML20087K442
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 07/31/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20087K244 List:
References
NUDOCS 9508230291
Download: ML20087K442 (10)


Text

m

(

OPERATING DATA REPORT DOCKET NO 50-369  :;

DATE Aunust 15. 1995 QPEMIIM STJIllS COMPLETED BY R.A. Willinas~

TELEPHONE 704-382-5346

.l. Unit Name: McGuire !' -

2. Reporting Period: July 1, 1995-July 31, 1995 g
3. Licensed Thereal Power i st): 3411 4.'Waseplate Rating (6ross Me): 130$e Notes #Naseplate Rating

'5 Design Electrical Rating (Net MWe):  !!B0 -(6ress Wel calculated as '

6. Maxieue Dependable Capacity (6ross Mel:  !!71 1450.000 MVA : .90 power
7. Maxisus Dependable Capacity (Net MWe): 1129 factor.per Page 111, 9.' If Changes Occur in Capacity Ratings (! tees Nueber 3 Through 7) Since Last NURE6-0020.

. Report. Give Reasons: ,

9. Poner Level To Which Restricted, if Any (Net MWe):

10.ReasonForRestrictions,Ifany:

This Month "r.-to4 ate - -Cueulative

!!. Hours in Reporting Period 744.0 5087.0  !!9783.0- ,

12. Nueber of Hours Reactor Was Critical 698.7 ' 4957.8 '85317.2 '
13. Reactor Reserve Shutdown Hours - . ' -

' 0-

.14.HoursGeneratorOn-Line' 635.7 4885.3 84390.0

'15. Unit Reserve Shutdown Hours - - 16. Bross Thereal Energy Benerated (MWH) 2124395 .16544195 264366621' i

17. Eress Electrical Energy Generated (MWH) 705407 5664416 ;90816139
18. Net Electrical Energy Generated (MWH) 673909 5445331 - 86752699 l
19. Unit Service Factor 85.5 :96.0 70.5-20.UnitAvailabilityFactor 85.5 96.0 70.5
21. Unit Capacity Factor (Using MDC Net) 80.2 94.8 63.1
22. Unit Capacity Factor (Using DER Net) 76.B 90.7. 61.4.
23. Unit Forced Outage Rate 14.6 4.0 13.9
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration cf Each):

Refueling - December 08, 1995 - 43' days t

25. If Shut Down At End Of Report Period. Estieated Date of Startup:
26. Units ~In Test Status (Prior to Coseercial Operation): Forecast Achieved i  !

INiilALCRITICALITY ,

INiilALELECTRICITY COMMERCIAL OPERATION I 9508230291 950815 i1 PDR ADOCK 05000369 i l R PDR l-

D,i - . , , , . .x n-m- - - - -


p--

' - =

9 8 ::.

t y

q i, -

OPERAilllE MTA REPORT'-

pk DOCKET 110 50-M9 =

IAlli licentre 1 -

MTE Ananst 15. 1995 CalFLETER BY - R.A. Ililliams-TELEPHOIE 7M-302-5346

.[Il0 NTH ' July 1995 s

til - AVERAGE MILY Poller LEVEL M1 AVERAGE MILY poler LEVEL

' (Illie-Ilet)

(Illiedlet)

'1 0 17 '1000 2 0 18 13 3' 0 19 - 1984

'4 0 20 1005 5- 43 21 1987 ~4

l

),

,6' 947- 22 1886 7- 1092 23 1088 8 10M - 24. # 1086 9 1008 - 25 1082 10 1091 26 - 1001

!! 1094 27 1086

!? ' 1094 28 1989 a 13 1995 29 1091' t 14 J 1095 30 1090

.. +-

P 15- 1095- 31 1086

[

16. 1093

- -__--_-----_-_-__------------.____--_-s--- - . - - - - - , - - - - -- .-.__------------._a----- - - - - _ . - - - - - , - - - -

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME m _y u u se, 1 .

DATE ve/id/ud REPORT MONTH July 1995 COMPLETED BY x. a. williams TELEPHONE (/us)-Jus-d346 (1) (2) (3) (4) (5)

R MET-E HOD .

T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 2 95 1 F 108.27 A --

EE ENGINE DIESEL GENERATORS DECLARED INOPERABLE DUE TO TURBOCHARGERS 2-P 95 5 F --

A --

CG DEMINX PLACED DEMINERALIZER IN SERVICE 3-P 95 5 S --

A --

HG f.XX.CZ SECONDARY CHEMISTRY SAMPLING (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulaton Restriction 4-Other (Explain) File ( M EG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

DOCKET: 50-369

~ UNIT:, McGuire 1 Date: 08/15/95 -

NARRATIVE

SUMMARY

MONTH: July 1995 i t

McGuire Unit i began the month of July in an outage because the diesel generators were declared inoperable due to the turbochargers. The unit was placed on-line 07/05/95 at 1216. During power .

escalation, the unit held at 18% power on 07/05/95 from 1313 to 1726 due to placing demineralizer in service. The unit held at 20% power from 1739 to 1930 due to secondary chemistry sampling. The unit resumed power escalation, and returned to 100% power on 07/06/95 at 1229. The unit operated at or near 100% full power the remainder of the month.

E i

Prepared by: R. A. Williams Telephone:(704)- 382-5346

R.

s MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire. Unit 1
2. Scheduled next refueling shutdown: December 1995
3. Scheduled restart following refueling: January 1926 i

THE PROJECTMANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICNflON OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or  ;

performance analysis methods, significant changes in design or new operating procedures).

7. Number of Fuel assemblies (a) in the core: JM (b) in the spent fuel pool: bil
8. Present licensed fuel pool capacity: 14_63 -

Size of requested or planned increase: ---

9. Projected date oflast refueling which can be accommodated by present license capacity: March
g. . .

DUKE POWER COMPANY DATE: August 15.1995 Name of

Contact:

B. A. Williams Phone: f704 - 382-5346 1

'l l

1

m'n ' .

< , . +

..__ k

. , .. i i

OPERATING DATA REPORT ,

i DOCKET NO 50-370 DATE Annust 15. 1995 GPERATING STATUS COMPLETER SY R.A. Villians

. TELEPHONE 704-3B2-534-1.' Unit Naee Mc6 site 2 4 2a Reporting Period: July 1, 1995-July 31, 1995 30 Licensed Thereal Power (Mth 3411 ,

4.NaseplateRating(6tossMWe)
130$i Notes eMaseplate Rating ~

L 5. Design Electrical Rating (Net Me h 1100 (Gross Me) calculated as

6. Marieue Dependable Capacity (6 toss Me): 1171 1450.000 MVA : .90 power
7. Manteus Dependable Capacity (Net We):. 1129 .

factor per Page ill, ,

8. If Changes Occur.in Capacity Ratings litees Number 3 Through 7) Since Last MREE-0020.

I - Report. Give Reasons i

9. Power Level To Which Restricted, If Any (Net Me):
10. Reason For Restrictions, if any

[

ThisMonth- Yr.-to-Date teamlative

!!. Hours in Reporting Period 744.0 5087.0 100079.0 ,

12. Number Of Hours Reactor Was Critical 744.0 4711.9 78264.7 ,
13. Reactor Reserve Shutdown Hours .--0-- --0-- - .t
14. Hours Generator On-Line 744.0 6 61.2 - _ 77245.8
15. Unit Reserve Shutdown Hours -

--0-- --0-- .:

16.GrossTherealEnergyGenerated(MHl. 2534676; 15670529' 253515943-  !

17. Gross Electrical Energy Generated (MH) 961375 5430042 88477640. ,

IB. Net Electrical Energy Generated (MWH) 829005 5220003 B4843149- f 19.UnitServiceFactor 100.0- 91.6 77.2

20. Unit Availability Factor 100.0 91.6 77.2  ;
21. Unit Capacity Factor (Ustag MDC Net) 98.7 90.9 74.3.  ;

22.' Unit Capacity FL: tor (Using DER Net) 94.4 87.0 71.9 .,

23. Unit Forced Dut y e Rate 0.0 3.3 6.4
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachlt. -

None ,

23. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units In Test Status (Prior to Ecosercial Operation): Forecast Achieved i b

INITIALCRITICALITY INITIAL ELECTRICITY r COMMERCIAL OPERAT!DN 4

f

g:  ; <-

I,i r ,

L &

_ y

~

L E

, ; .l , . -

.OPERATIMB MTA REPORT:

l DOCKET NO - 50-370' l4 INilt menuire 2

. MTE " - 11 15. 1995-COlFLETES BY- R.A. Williams TELEPHONE- 704-302-5346 MONTH- hiv.1995 a

-E . AVERAGE MILY PONER LEVEL. E AVERAGE MILY POWER LEVEL-(MWe ilell . (MWe-liet) .

!' 1122 17 till 2 1119 18 till -

1.

'3 1118 19 - -1109 14 1123 . 20 <

1111-5- 1125 21 1112

,6 1123 . 22 1110

.7 1123 23 - 1111 8- 1119 24 ' '1109 9 1116 25 1100-

10. 1118 ~ 26" 1100

, ~11 1118 . 27 . 1109

12' 1117 28 ~ 1110' 13 1118 - 29 1107

' 14' i117 . 30 1105 13 1118 31, 1102' l 16 1115 l

t Y

~ .

. a.3 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. '50-370' 1 UNIT NAME-muuyAK4 e .

'DATE' ve/.Ld/yd REPORT MONTH July 1995 COMPLETED BY- x. a. williams TELEPHONE (eve;-auz-dsed-(1) (2) (3) (4) (5)

R MET-E HOD

  • T A' OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE-O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE

'NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent q Sheets For Licensee-C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161))

E-@erator Training & License Examination F-Administrative (5)

Exhibit I - Same Source G-Operator H-Other Error (Explain) (Explain)

., . . ., - .~ -, ,. -. ..

"yp . .~7,

, 3.1 ' ,.. ' ,G.  :,

<, A , ,

. s. ,;

~ ' ? ' if -j

%' 5;u , ' ?j;.5..;

%k .j l

d. .

.n

.)

J O'-

I DOCKET: 50-370 P *

  • s

. UNIT: McGuire 2

r 1. , 31 Date: 08/15/95 . .i

.j 1

l i

.' NARRATIVE

SUMMARY

1 i l

L l l MONTil: July 1995 l

l. ,

I McGuire Unit 2 began the month ofJuly operating at 100% full power. The unit operated at or near 100%

- full power for the entire month, i

l' l *

,)

i I'

.:);

1 i

li Prepared by: R. A. Williams

,e

-Telephone: (704)- 382-5346 i

P

-[

t.

h

~

. s :.

l e

e-* ,r.. , , . , , , . , , , . _ . - ~ , .

pfL yg

%, an

.. MONTHLY REFUELING INFORMATION REOUEST -

y ,

1. Facility name: McGuire. UrJt2 -
2. Sct.eduled next refueling shutdown: Matchl226 :
3. Scheduled restart following refueling: May 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 -

THROUGH 6 WILL NO LONGER BE MAINTAINED IN 'IMIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or -

other license amendment?

If yes, what will these be?

If no, has reload deign and core configuration been reviewed by Safety Review Committee

regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 123 (b) m the spent fuel pool: 323
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: :: :
9. Projected date of last refueling which can be accommodated by present' license capacity:
December 2003 DUKE POWER COMPANY DATE
Aucust 15.1995 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

_