-O OPERATING DATA REPORT O O  ;

DOCKET NO. 50-317  !

DATE 09;t%~~ i COMPLETED BY EVELYN BEWLEY f TELEPHONE (301) 787-5365

<

  • OPERATING ' STATUS cc nNNNNNNNNNNNMH REVISION: LIhE 17
1. UNIT'HAME : CALVERT CLIFFS NO. I
2. REPORTING PERIOD N OCTOBER 1983
3. LICENSED' THERMAL POWER (MWT) N 2,700 4.' NAMEPLATE RATING (GROSS MWE)'N 918 _

l

5. DESIGN ELECTRICAL RATING (HET MWE) 845  !

~

-6. MAXIMUM DEPENDABLE CAPACITY GROSS _MWE N 860 __

7. MAXIMUM DEPENDA0LE CAPACITY (HET MWE) M 825
8. IF CHANGES OCCUR IM CAPACITY RATINGSCITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS N
9. POWER LEVEL TO WHICH RESTRICTED (HET MW) M i

_1,0. REASONS FOR RESTRICTIONS. i

??

i MONTHLY YRMTONDATE CUMULATIVE '

l WMMMMMM' MMMMMMMMMM MMMWNWMMMM-I?.. HOURS IN REPORTING PERIOD 745.0 7296.0 74365.0

12. HUMBER OF HOURS REACTOR WAS CRITICAL 0.5 6286.5 59382.4

~T37~KEACTOK~ RESERVE SHUTDDWN' HOURS 0.0 58!7 1867!2 14e HOURS GENERATOR ON LINE 0.5 6248.7 58272.6 115. UNIT RESERVE-SHUTDOWN NOUR$ .

0.0 0.0- 0.0 16; GROSS THERMAL ENERGY 1 GENERATED (MWH) 8. 16404842. 143074888.

17. GROSS'ELECTRICAE~ ENERGY GENERATED (MWH) 80. 5471249. '47072192.

18.. NET ELECTRICAL ENERGY GENERATED (MWH) 9. 5237708. 44901915, i

19. UNIT SERVICE FACTOR 0.1 85.6 78.4 20.'-UNIT AVAILABILITY FACTOR 0.1 85.6 78.4 Mi. Uni CAPACITTFACTOR CUSING MDC NET) W!E 87!9 i4 2
22. UNIT CAPACITY FACTOR (USING DER NET). 0.0 85.0 71.5

^23.1 UNIT FORCED OUTAGE RATE- 0.0 2.7 7.5

'24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION)

  • No. 1 Plant began a 14 week outage on 10/1/83 for refueling and unit general inspection.
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP i
26. UNIT IN TEST STATUS (PRIOR COMMERCIAL OPERATION) FORECAST ACHIEVED t

~-

. THITIAE~CRITICAEITY-INITIAL ELECTRICITY a '

COMMERCIAL OPERATION t

y ENN3320<MND3 844M229 t PDR ADOCK 05000317

. R .

PDR

I OPERATING DATA REPORT DOCKET NO. 50-317

' DAT E- 03-0 9-84 COMPLETED BY EVELYN BEWLEY TELEPHONE (301) 787-5365 OPERATING' STATUS uMuunMMMMMMMMMMMM REVISION: LINE 17-

1. UMIT HAME : CALVERT CLIFFS NO. 1 2.. REPORTING PERIOD M NOVEMBER 1983
3. LICENSED THERMAL POWER (MWT) M-2,700
4. NAMEPLATE _ RATING (GROSS MWE) w 918
5. DESIGN ELECTRICAL RATING (HET MWE) : 845
6. MAXIMUM DEPENDABLE' CAPACITY GROSS MWE M 860
7. MAXIMUM DEPENDABLE CAPACITY (HET MWE) M 825 8.EIF CHANGES OCCUR IN CAPACITY RATINGSCITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE' REASONS N
9. POWER LEVEL ~TO WHICH RESTRICTED (NET MW) M
10. REASONS FOR RESTRICTIONS.

MONTHLY' YRMTONDATE CUMULATIVE wwwwwww wwwwwwwwww wwwwwwwwww

11. HOURS IN REPORTING PERIOD 720.0 8016.0 75085.0
12. HUMBER OF HOURS REACTOR WAS CRITICAL 1.8 6288.3 59384.2 13-REACTOR RESERVE ~SNUTDOWN~MOURS 6.0 58 7 1867:2-
14. HOURS GENERATOR ON LINE 0.0 6248.7 58272.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 .

0.0

16. GROSS THERMAL. ENERGY GENERATED (MWH) 9. 16404842. 143074888.

~ 17. 6Rs55 El'ECTRICAt ENERGY ~ GENERATED (MWM) 8. 5471249. 47072192.

18. NET ELEC RICAL ENERGY GENERATED (MWH) 0. 5237708. 44901915.
19. UNIT SERVICE FACTOR 0.0 78.0 77.6
20. UNIT AVAILABILITY FACTOR 0.0 78.0 77.6

-ki. . UNIT CAPACITY FACTOR-(USING MDC-NET) 0:0 79.2 73:5

22. UNIT' CAPACITY FACTOR (USING DER NET) 0.0 77.3 70.8 2M." UNIT FORCED OUTAGE RATE . 0.0 2.7 7.5 24.~ SHUTDOWNS SCHEDULED DVER THE MEXT 6 MONTHS (TYPE, DATE,'AND DURATION) :

No. 1 Plant began a 14 week outage on 10/1/83 for refueling and unit general inspection.

25. IF SHUTDOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF START-UP :
26. UNIT IN TEST STATUS.(PRIOR COMMERCIAL OPERATION) FORECAST ACHIEVED
  • ' INTTIAL CRITTCALIli

. INITIAL ELECTRICITY

. .: COMMERCIAL OPERATION

, . . - - - _ _ _ - _ _ _ ~_ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ . . _ _ _ _ . _ _ _

J OPERATING DATA REPORT

- ~

DOCKET NO. 50-317 DATE- 03-09-54 COMPLETED BY EVELYN BEWLEY TELEPHONE (301) 787-5365

- OPERATING STATUS W WsnuwwwwwMuwwww REVISION: LINE 17

'1. UNIT HAME : CALVERT CLIFFS NO. 1

2. REPORTING PERIOD w DECEMBER 1983 _

l

3. LICENSED THERMAL POWER (PMT) w 2,700

.4.' NAMEPLATE RATING (GROSS MWE) M 918 ,

5. DESIGH ELECTRICAL RATING (NET MWE)
  • 845
6. MAXIWJM DEPENDABLE CAPACITY GROSS MWE M 860 7.iMAXIMUM DEPEND 46LE CAPACITY (NET MWE) M 825
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE-LAST REPORT. GIVE REASONS w
9. POWER LEVEL TO WHICH RESTRICTEP (HET MW) M
10. REASONS FOR RESTRICTIONS.

c-MONTHLY YRMTONDATE CUMULATIVE wwwwwwx' wwwwwwwwww wwwwwwwwww

11. HOURS IN REPORTING PERIOD 744.0 8760.0 75829.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 582.7 6871.0 59966.9
  • 13;-REACTOR-RESERVE SHUTDOWN-HOURS ~28 7 79 4 1887;9 14.' HOURS GENERATOR ON LINE 473.3 6722.0 58745.9
15. UNIT RESERVE SHUTDOWN HOURS. 0.0 0.0 0.0
16. GACSS THERMAL ~ ENERGY GENERATES (MWM) 1067407. 17472249. 144142295.

"I77 GROSS ~EEECTRICAI ENERGY GENERATED (!1WM) 355293. 5826542. 47427485.

18. NET ELECTRICAL ENERGY GENERATED (MWH) 333050. 5570758. 45234965.
19. UNIT SERVICE FACTOR 63.6 76.7 77.5
20. UNIT AVAILABILITY FACTOR 63.6 76.7 77.5

'217tNtIT-CAPACITY-FACTOR'(USING MDC-' NET) 5473 77 1 73:3

22. UNIT CAPACITY FACTOR (USING DER NET) 53.0 75.3 70.6 23.~ UNIT FORCED OUTAGE RATE 7.6 3. 0 - 7.5 24; SNUTDOWHS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION) :

No. 1 Plant returned to service on 12/10/83.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP : 12/10/83. ,

FORECAST ACHIEVED (26. UNIT IN TEST STATUS (PRIOR COMMERCIAL OPERATION) g INITIAL' CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

_ ___m-

I N

,m. ,\ ,a

()"

( ) (

OPERATING DATA REPORT DOCKET _HO. _50-317 . . _ ___ . _ . _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ . _ .

DATE 3-09-84 COMPLETED BY EVELYN BEWLEY TELEPHONE (301) 787-5365 OPERATING STATUS

& :: M :. .: M M M M M M M M M M M M REVISION: LINE 17

1. UNIT NAME : CALVERT CLIFFS HD. I
2. REPORTING PERIOD M JANUARY 1984
3. LICENSED THERMAL POWER (MWT) M 2,700
4. HAMEPLATE RATING (GROSS MWE) M 918
5. DESIGH ELECTRICAL RATING (HET MWE) : 845
6. MAXIMUM DEPENDABLE CAPACITY CROSS MUE M 860
7. MAXIMUM DEPENDABLE CAPACITY (HET MWE) M 825
8. IF CHANGES 00 CUR IN CAPACITY RATIHGS(ITEMS HUMBER 3 THROUGH 7) SINCE LAST REPORI. GIVE REASONS M
9. POWER LEVEL TO WHICH RESTRICTED (HET MW) M
10. REASONS FOR RESTRICTIONS.

MONTHLY YKMTONDATE CUMULATIVE MMMMMMM MMMMMMMMMM MMMMMMMMMM

11. HOURS IN REPORTING PERIOD 744.0 744.0 76573.0
12. HUMBER OF HOURS REACTOR WAS CRITICAL ~~ ~ ~ ~ ~ ~ - ~ ~ ~ ~ ~ ~726.S~ ~ ~ ~ ~ ~ ~ ' ~ ~726.5 - ~ ~60693.4 -

~137 REACTOR' RESERVE SHUTDOWN HOURS ~' ~ O '. 0 0. 0 ~ ~ 18 8 7 . 9 - ~ - -~~ ~ ~ ~- ~ ~~ ~ ~ ~ ~~ ~ ~ ~ ~ - - ~ ~~

14. HOURS GENERATOR ON LINE 720.6 720.6 59466.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

~16 mGROSS THERMAL ENERGY GENERATED (MWH) 1897999. 1897999. ~146040294.

648747!

--~ - ~ ~ ~ -

17. GROSS ELECTRICAL ENERGY' GENERATED (MWH) 648747.~ 48076232. - -- - -
18. HET ELECTRICAL ENERGY GENERATED (MWH) 622191. 622191. 45857156.
19. UNIT SERVICE FACTOR 96.9 96.9 77.7
20. UNIT AVAILABILITY FACTOR 96.9 96.9 77.7 ~ ~ - - - - - - - - ~ ~

~ 101.4~

~ ~ ~ -

21 ~ UNIT CAPACITY ~ FACTOR-(USING MDC HET)~ --~- 101 '. 4 ~ ~ ~- - -- -- ~ ~~~7 3 . 5 22, UNIT CAPACITY FACTOR (USING DER HET) 99.0 99.0 70.9

23. UNIT FORCED DUTAGE RATE 3.1 3.1 7.5
24. SHUTDOWHS SCHEDULED DVER THE HEXT 6 MONTHS (TYPE, DATE, AND DURATION) :
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP :
26. UNIT IN TEST STATUS (PRIOR COMMERCIAL OPERATIOH)~~ ~ ~ ~ ~ FORECAST- - ~ ~ ACHIEVED ~ ~ ~ - - - - - ' ~ ~ - - ~ ^ ~ ~

- ~~~~ INITIAL CRITICALITY

~ ' ~~ ~'

-~ ~ -

IHITIAL ELECTRICITY

. COMMERCIAL OPERATIDH I

i) -- -

y_) a v OPERATING DATA REPORT

_ ._. _ _ _ _ DOCKET..HO._ 50-317. _ _ _ - - - . - - . _ -- - - - - .- ---

DATE 3-09-84 COMPLETED BY EVELYN BEWLEY TELEPHONE (301) 787-5365

. - ~ . . . - - . . . _ _ . - . . . . - - . . - . - . . . - .-. _ - ~ ~ - ~ - - - - - . - .-

.-~-4 OPERATING STATUS l UM1.MMMMMMMMMMMM l l

1. UNIT NAME : CALVERT CLIFFS HO. I
2. REPORTING PERIOD MJEBRUARY 1984_ _ _ _ ___ _ ___ _ _ _ _. _ _ _ , ._ _ __ _ . _ . _

____ _ _____ _ ____ _ _ _ __j

3. LICENSED THERMA *. POWER (MNT) M 2,700 k HAMEPLATE RATING (GROSS MWE) M 918 _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ . _ _ . _ _ . . _ _ _ _ _ . _ _

l

5. DESIGtt ELECTRICAL RATING (HET MWE) : 345 6._ MAXIMUM _DEP_ENDAELE C_APACIl_Y_ GROSS _MWE M.360_ __ __ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _

i7e MAXIMUM DEPEFOASLE CAPACITY (HET MWE) M 825 8-. IF CH'.'HGES OCCUR IN CAPACITY RATINGS (ITEMS NUMSER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS M

9. POWER LEVEL TO WHICH RESTRICTED (NET MW) M 10m REASONS FOR RESTRICTIONS.

, MONTHLY YRMTOMDATE CUMULATIVE ._ __ ____

~

MMMMMMM MMMMMMhMMM MMMMMMMMMM

11. HOURS IN REPORTING PERIOD 696.0 1440.0 77269.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL - ~ ~ ~ ~66'9.0 1395.5 61362.4 0 ~. 0 --~ ~~-~ ~ 18 8 7 . 9 ~ -- ~ ~- ~

~ ~ - - - - - ~ ~

~I37 REACTOR ~ RESERVE ~SHUTDOWH ~H')URS~ ~~ ' ' ' ~~ 0. 0 ~

14. HOURS GE%: 'OR OH LIHE 669.0 1389.6 60135.5 15, UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 "16x GROSS THERMAL ENERGY GENERATEDCMWH)

~

1771548. 3669547. 147811842. '- ~ ~ ~ ~ ~ ~ ~ ~ - '

1262669.'

~

17.~ GROSS ELECTRICAL ENERGY GENERATED (MWH) 613922. 48690154.

18. NET ELECTRICAL EHERGY GENERATED (MWH) 588893. 1211084. 46446049.
19. UNIT SERVICE FACTOR 96.1 96.5 77.8
20. UNIT AVAILABILITY FACTOR 96.1 96.5 77.8 L21-~ UNIT C AP ACITY~ FACTOR-(USING MDC'HETF-~ ~~~ ~~ ~ ~ ~ 10 2 . 6 ~ - ~ ~- ~--- ~ 101. 9 ~ ~ ' - ~ ~ ~~~^ ' ~ ' 7 3 . 8 - ~ ~~-'-~~~~~- ~ ~~~~ ~
22. UNIT CAPACITY FACTOR (USING DER HET) 100.1 99.5 71.1 23c UNIT FORCED OUTAGE RATE 3.9 3.5 7.4 24 SHUTDOWHS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE. AND DURATION) :
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP :
26. UNIT IN TEST STATUS (PRIOR COMMERCIAL OPERATIOH) - - ' ~ ~ ~ ' " ^ ' - ' ~ ~ ~ ' ~ FORECAST'- ~ ~ - ~~ ~ ~ ACHIEVED ~~~~-~ -- - ~ ~-~~~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

F

  • ~ ~ INITIAL ~ CRITICALITY ~~~~

~

INITIAL ELECTRICITY COMMERCIAL OPERATION P

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ - _ . - _ . _ - ---a,.

OPERATING DATA REPORT

_. __ _ __ __ _ DOCKET.HO. 50-418- _ _ _ .-_. _. - - - _ _ _ -_. _ _ . _ _ _ _

DATE 3-09-84 COMPLETED BY EVELYH BEWLEY TELEPHONE (301) 787-5365 OPERATING STATUS

1. UNIT HAME : CALVERT CLIFFS NO. 2 2._REPORTI_HG_ PERI _0D M_ FEBRUARY 1984_ , _ __ _ _ _ . _ _ _

34 LICENSED THERMAL POWER (MWT) M 2,700 4 ., NAMEPLATE RATING (GROSS MWE) M 911

5. DESIGH ELECTRICAL RATING (HET MWE) : 845

_6. MAXIMUM DFPEH_DABLE__CAPAC_ITY_ GROSS _MWE w 860 _ ,_ _ , _ _ _ _ _ _ _ _ _ _ ,____ __ _ _ _ _ _ _ _ _

7: MAXIMUM DEPENDABLE CAPACITY (HET MWE) M 825 8~ IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS M _ _ _ _ _

9. POWER LEVEL TO WHICH RESTRICTED (NET MW) M
10. REASONS FOR RESTRICTIDHS.

-' -~ -- MONTHLY - - ~ ~ ~ ~YRwT0wDATE-~ ~~ CUMULATIVE wwwwwww wwwwwwwwww wwwwwwwwww

11. HOURS IN REPORTING PERIOD 696.0 1440.0 60624.0
12. HUMBER OF HOURS REACTOR WAS CRITICAL ~~ ~~'

696.0 -

1440.0 ~51367.8 137 REACTOR RESERVE ~ SHUTDOWN ' HOURS ~' ~ ~ ~ ' ~ ~ ~ 0.0^~~ -~~'~0~.0 - 9 5 7 . 8 -~- " - ~ ~ ~ ~~ -~~ ~ ~- ~ - ~~

14e HOURS GENERATOR ON LINE 696.0 1440.0 50555.2

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16- GROSS THERMAL ENERGY GENERATED (MWH) ~ ' ' ~1787897. 3778858. -~ ~ ~ ~ ' ~ ~

1245302. - ~ ~ ~ ~ ~125620552.~~~~~~~~~ ~~~~~ -

~

'17 TGROSS~ ELECTRICAL ~ ENERGY' GENERATED (MWH)~ 587882. ~ 41314588.

18. HET ELECTRICAL ENERGY GENERATED (MWH) 562435. 1192525. 39396287.
19. UNIT SERVICE FACTOR 100.0 100.0 83.4
20. UNIT AVAILABILITY FACTOR ~~" ~100.C 100.0 83.4

~ 10 0 . 4 ' ' ~ ~' ~ ~

'~ - ~ ~ ~ ~ ' ~ ~ ~ ' - ~ ~ ~ ~

  • 217 UNIT ~ CAPACITY FACTOR-(USING MDC NET) 9 8 .' O ' ~ 79.3 22, UNIT CAPACITY FACTOR (USING DER HET) 95.6 98.0 76.9 23, UNIT FORCED OUTAGE EATE 0.0 0.0 5.7 24, SHUTDOWHS SCHEDULED DVER THE HEXT 6 MOHTHS (TYPE, DATE, AND DURATION) :

No. 2 Plant is scheduled to begin a 10 week outage in April 1984 for refueling and a unit general inspection.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP :
26. UNIT IN TEST STATUS (PRIOR COMMERCIAL OPERATION)~ - - - - ~ ~ - ~ ' FORECAST ~ ~ ~ ~ ~ ~~~~ ~ ACHIEVED ~ ~ ~ - ~~ ~ ~~~-~

~~~~~~INITI AL~~ CRITIC ALITY ~' ~ - ~

IHITIAL ELECTRICITY COMMERCIAL DPERATION

_ .M

/

AVERAGE DAILY UNIT POWER LEVEL DOCKET.NO. 50-317 __a _

UNIT CALVERT CLIFFS NO. 1 '

DATE 3-09-84 ~ -, _

COMPLETED BY EVELYN BEWLEY

. . .___T_E L E P H 0 H E_( 3 0_l )__7_8_7 - 5 3 6 5 __

/ -

, ._ _s - 3o -

.7 FEBRUARY 1984 f MMMMMMMMMMMMMMMMMMMMMMMMM

! r.

-PAY AVERAGE ^ DAILY' POWER EEVEL '

/ ( Pf.JE - H ET )

-~

1 876. I 2' 876. , < -

-l 3 879.- I 4 "" 880.

" - 1 5

6

.. 881.

881.

~

-~

f:d 7 883.

8 9

882.

882.

[

, 3 -~

" -  ;- ," 10 881. '- O , ',

e e 11 .381.  ?-

.5 'n '12 884. "

/,sz.

a- f,.

^

13 883. ,s- '

,,;~

~-*~*

~~I 4 , 883. -

- 15 883. - _'- /

16 885. ' tj

' l 17 885..  !. . /; > ,. (- ' -

-18  ;~83 3 P, '. KP / 4 ~'

z-- 19 868.; * '

- U/l 28 .8B2.

4( .j

's g , " QnJ 21 883:. , ,__

z2 , -~ 8 8 3 . ~

^ - -

23 883.

24 882. ~ - - ,

25 883. - -

, 2 6-~ 882. '

- l['- , 27 ~

Y:-882.-

.& 2%

\)766.

>_ s

~29 -

9. .

~'

< j

. /

~

s 9 i 70 4 Y s . * ' 19-' .

~F t. .

/if

.m, . .

h g.

_ }. c.

h

8. E -

- - - - - - - _ _ _ . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ . , , _ . _ _ _ _ . _ _ _ _____ m m m m _ w m __

. _ . _ _ _ _ . . . - . . . _ . ~ _ _ . . _ . . . _ _ . _ . _ . . _ _ . _ . _ __ . _ _ _ _ . . _ . _ _ _ _ _ _ _ .

AVERAGE DAILY UNIT POWER LEV ~t DOCKET.NO. 50-318 UNIT CALVERT CLIFFS HO. 2 DATE 3-09-84 COMPLETED BY EVELYN BEMLEY TELEPHONE (301) 787-5365 6

FEBRUARY 1984 MMMMMMMMMMMMMMMMMMMMMMMMM DAY AVERAGE DAILY POWER ~ LEVEL (PlWE - NET) 1 848.

2 -'~~848.

3- 848.

4 668.

5 822. ~

6~ 850.

7 849. i 8 783.

846.  !

9

.= 10 . ~~~548.

'll -823.

12 745.

13 849. ~

14 858.

15 849. ,

16 849.  !

17 849.

18 852.

19: - ~855.

.20 853, 21- 851. -

72 848. i 23 847.

.24 847. I 25 719. ,

z6 845.

.27 844.

28 : ~440. .

29 611.

T

'. .  : .a :

h A

. t

[

l____ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ __ __ _. _

s .

-s ,

.t '

t .

COCKLt S0. 50-317 UM T SHUT 1) OWNS AND POWER REDUCTIONS

- Uh1 TAME Calvert Cliffs ise. t DATE 3/04/8'

/ -

~ COMPLETED BY E a~1 v _

  • P.EPORT MONTil February TZLEPHGNE 301- W -5363 j -

l 1 ,y ,

i -  : , c

' s j 5- 'l

  • Lgensee 5, Eq Cause & Cosacetive

{$

.f63 Date - E. - ~

E5 $ 3n .e(E)U Event ET Ai;the to . I ,.

  1. 5 gL , Peesent Ruureence *

,, s ,

+

c =- a s m s Repoet s eL v .

  • ,?. O

, 4 - O -

n

r. _- ,.

84-02 840228 f 27.0. A 1 CB lPUMPXX Due to loss of two charging pumps and repair

- , leaking pressurizer safety valve.

P

a. <

g s f,  ;+ ~,

y 4 s  %

k '.; e 1

.'g<

P 1

- , 2 i =

k s

. s i ' .' '.) 4

~

F: Forced Reason. s Method:  ; Exjubit G instructions

  • ro Frepar.iion of Data S: Scheduled A.Et;uipment Failure (Esphin) '

l Man.ual .

8.Maintenatice of Tr:t -

2-Manual Scram. Entiv Sheets for Licensec r.Re Fuel.cg .; Autonatic Schm. Esent Reposi (LE RI Fde (NUREG-

Pi t
1 i x D.Regt:lator) Resisi.ieun - 4u0ontinuation
1;-Operator Tsaining & License Tsansnation 5-1.oad Reduetion F Administraine OJ.c r 5

G4)peration ! Eteur (Esplain) Estubo ! Ssme Source i .

Ps/77) Il4'ther ( E ss lam) i l

DocutN3. 50-318 ,

UNIT NAME Calvert Cliffs a7 UNIT SHUTDOWNS AND POWER REDUCTIONS payg 3 / co / sr.

February COMPLETED BY E . 9.d . 2 REPORT MONT14 TEL& HONE 1301)787-536s L

e E

  • O -

Licensee E, e Cauw & Coeerstive

No. Defe j 3 {t3d Event [$ c$

$ Action to .

P- yE gg 3gn a

  • Repose a en b Eb O

Psevent Recurrer.ca

  • I d 84-01 840228 F 22.0. B 5 CB PUMPXX Isolation of an instrument line of 22A Reactor

. Coolant pump seal.

NOTE:

No. 2 Unit experienced load reduction at various loads due to moisture separator reheater tube leaks.

i -

l 1

l 4

I .' 3 4 F Forced Reason. Method: EnJnbet C Instructions

5: Scheduled A. Equipment Fait ee(Esplain! I-Manual for Psepseatiori sof Data Ente, Sheets for Lkensee 8 Maintenance of Test 24tanual Scram.

C RcFuel.r; 1- Ausonutsc Scrain. Esens Repues tLERI File (NUREC D Regulator) Retteigteun 4e00ntinuestion Pitil l 4

1.-Opetaler Teasning d LJessise l'samination 5-Load Reduction '

F Ademnistratise $

G4)pesaisonal Eteos (Esplain) b0th" E shitne I . 5aow Source I'7/77) ll4'ther IF sgalain) 4 J .

. . .- - .- .- ~ .= . . . - . . .--

i

+. *. l 1

s March 5,1984 I

REFUELING INFORMATION REQUEST i 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 j 2. Scheduled date for next Refueling Shutdown: March 23,1985

3. Scheduled date for restart following refueling: May 26,1985 4

l 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action'and supporting information.
February 20,1985
6. Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 796 Spent Fuel Pools are common to Units 1 and 2

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 1830 (b)0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool l assuming the present licensed capacity and maintaining space for one~ full core off load.

April,1991 l

+

l March 5,1984 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2. Scheduled data for next refueling shutdown: April 21,1984.
3. Scheduled date for restart following refueling: June 10,1984.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

March 3,1984

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted in the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

(a) 217 (b) 796 Spent Fuel Poolis common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

(a) 1830 (b)0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE FEBRUARY 1984 2/1 At the beginning of this reporting period, Unit I was operating at 877 MWe with the reactor at 100% power.

2/18 Reduced load to 719 MWe at 2230 to test Main Turbine Control Valves.

2/19 Load was increased to 882 MWe at 0430.

2/28 At 2010 the unit was shutdown as a precautionary measure due to the availability of only one charging pump.

2/29 At the end of this reporting period, Unit I was shutdown while performing planned maintenance on one Pressurizer Safety Valve.

4

- = -e ,*---- 9 %

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE FEBRUARY 1984 2/1 At the beginning of this reporting period, Unit 2 was operating at 847 MWe with the reactor at 100% power.

2/4 At 0500 commenced reducing power to 595 MWe to facilitate maintenance on 22 S/G Feed Pump.

2/5 Resumed full load operation (852 MWe) at 0500.

2/8 At 0858 commenced reducing power to 685 MWe to make repairs to 22 Heater Drain Tank Level Control Valve. Resumed full load operation (848 MWe) at 2115.

2/11 Load was reduced to 580 MWe at 2030 when 22 S/G Feed Pump controls started to oscillate.

2/12 Returned to full load operation (852 MWe) at 1205.

2/25 At 0310 commenced reducing power to 650 MWe to facilitate the replacement of 21 Heater Drain Pump Expansion Joints.

2/26 Resumed full load operation (845 MWe) at 0200.

2/28 At 0830 commenced reducing power to 10% to facilitate isolation of an instrument line of 22A Reactor Coolant Pump Seal.

2/29 Resumed full load operation (834 MWe) at 1800. At the end of this reporting period, Unit 2 was operating at 838 MWe with the reactor at 100% power.

1

. . .. . . . .- I

.. p BALTtMORE GAS AND ELECTRIC CHARLES CENTER . P.O. BOX 1475 BALTIMORE, MARYLAND 21203 FOS $1L POWER DEPARTMENT March 15, 1984 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20055 ATTENTION: Document Control Desk Gentlemen:

Enclosed herewith is the February 1984 - Operation Status Report for Calvart Cliffs No.1 Unit, (Docket 50-317) and Calvert Cliffs No. 2 Unit, (Docket 50-318).

Sincerely, i bfuYd E. K. Bowley #(7~

Economy Clerk l Production Econogy and Results Unit Fossil Power Department Enclosure cc: Messrs C. McCabe, Jr. R. Architzel R. R. Mills L. Russell P. Ross P. Sierer, Jr.

M. Beebe C. Shoemaker D. Reilly R. Ash .

T. Magette V. Stricklin J. Tieenan A. Lundvall EML/jkb wp/(NRC) hY',,

I

.