e, OPERATLNG DATA REPORT DOCKET NO. 50-302 DATE 1/1/84 COMPLETED BY M.W. Culver TELEPHONE (904) 795-3802 OPERATING STATUS N ***
- 1. Unit Name:
Crv" a l River finit 3
- 2. Reporting Period: 2/1/84 - 2/29/84
- 3. Lice ised Thermal Power (MWt):
2544 890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Elec'rical Rating (Net MWe):
860
- 6. Maximum Dependable Capacity (Gross MWe):
821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None (Net MWe):
N/A
- 9. Power Level To Which Restricted,if Any /A N
- 10. Reasons For Restrictions. If Any:
This Month Yr. ro.Date Cumulative 696 1440 61080
- 11. Hours In Reporting Period 667.2 1385.9 38955.I
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3 653.8 1365.6 37984.6
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 0
0 0
1574903 3274207 85238542
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 549201_ _.
1142975 20069711
- 18. Net Electrical Energy Generated (MWH) 523896 1090241 27607324
- 19. Unit Service Factor 93.9%
94.8%
62.2%
- 20. Unit Availability Factor 93.9%
94.8%
62.2%
91.7%
92.2%
57.2%
- 21. Unit Capacity Factor iUsing MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 91.2%
91.8%
54.8%
6.1%
5.2%
23.0%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 F.onths (Type. Date,and Duration of EachI:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8403160036 e m ggf773 PDR ADOCK 05000302 R
PDR I
AVERAGE D AILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 3/5/84 DATE COMPLETED BY D.
Graham TELEPHONE (904) 795-3802 MONTH 2/84 DAY AVERAGE D AILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL
( MWe-Net )
1MWe-Net) 1 864 17 840 2
823 g
827 859 832 3
39 4
840 20 751 5
848
- l 0
041 6
2$
366 608 7
R50 23 8
842 24 728 9
835 25 842 851 827 10 3
11 831 27 640 840 sg 297 839 808 33
,9 14 R40 30 15 845 3
818 I6 INSTRUCTIONS On this format.hst the.nerage dail) unit pieuer lesel m N1We. Net for each day in the repiirtmg m inth.Coimpute tii the nearest whole megawatt.
s o'77 i
e DOCKET NO.
50-302 UNil SHUlDOWNS ANI) POWER REDUCTIONS UNI T N AME FLCRP03 DATE 3/s/R4 COMPLETED BY D.
Fields REPOR T MONIll 2/84 TELEPHONE (904) 795-1Rn?
"t ig "h
h Ek f~$
I acemee h
cause A corrective No.
D-it e ca-M2 4
.2 s E 1%cnt u?
o-Action to S
j@
E ygc Report u (E 0 Picsent Recurrence
{
v Q
84-06 840201 F
59 A
N/A N/A CC llTEXCll Power reduction forced by necessity to isolate leaking MSR high pressure steam bundle.
84-07 840208 S
6.7 F
N/A N/A CC INSTRU Reduced power to repair the
'B' OTSG level transmitter.
84-08 840220 F
32 B
1 N/A CB MOTORX Shutdown to investigate oil level alarm on the 'C' RCP pump.
84-09 840222 S
51.3 B
N/A N/A IIC HTEXCH Reduced power to clean condenser tubes.
84-10 840227 S
31.8 B
N/A N/A HC HTEXCH Reduced power to apply epoxy coating to
'A' condenser tube sheet to prevent leakage.
84-11 840228 F
- 10.7 3
3 Not Yet As-EA CKTBRK Lightning strike caused momentary loss signed of off-site power and subsequent reactor scram.
I 2
3 4
lixinbit G Instruttions l': Forced Reason:
Method.
o S' Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
1.nir> Sheet > foi 1.icensee C Refueling 3 Automatic Scram.
lient Repius 11.1 Rll'ile t NilRI G-D-Regulatory Restriction 4-Ot her II:splam) 0161I l -Operator Training & lacenw I xanunation I Adnunistrative s
G. Operational 1.o rin ll: xplain)
I stubit 1 - Same Souvie 19/77)
Il-Other flTplain)
MONTHLY OPERATIONAL
SUMMARY
STATEMEhT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 3 /5 /84 COMPLETED BY D. Fields TELEPHONE (904) 795-3802 MONTH February 1984
SUMMARY
STATEMENT: The plant experienced one_ scram and one shutdown during the month.
Power was reduced on four separate occasions. Plant output was slightly limited at various times during the month by high OTSG levels caused by fouling.
Output was periodically limited by the EPA limit of 17.5* temperature rise across the condenser.
6 4,
5
I k',,
9 o
8d'OWO C*o EGO ( PbOs Y"F;,,e Florida
~
Po.. w..e_r March 12,1984 3F0384-08 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3 February 1984 Monthly Operating Report.
This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, G.R. Westafer Manager, Nuclear Operations Licensing and Fuel Management DVH:feb Attachments l
cc:
Mr. 3.P. O'Reilly l
Regional Administrator, Region II l
Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303 l
l 1
L GEN ERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042. St. Petersburg, Florida 33733 e 813-866-5151 l.