i GPU Nu11 ear Corporation 6,,
Nuclear
- .on:r388 Forked River, New Jorsey 087310388 609 971 4000 Wr,ter's D roct D,al Number:
C321-91-2001 January 3,1991 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Special Report No. 91-09 Enclosed is Special Report No. 91-09 which is submitted in accordance with technical specification 3.12.0, if there are any questions, please contact Mr. Michael Heller, OC Licensing Engineer at (609)971-4680.
S i nce r l y, r
/
tahn J.
on l
l ice Pre ent and Director Oyster C eek JJB\\MH:Jc Enclosure cc:
Administrator, Region 1 (All w/ enclosure)
Senior NRC Resident inspector Oyster Creek NRC Project Manager l
i l
(C:%?51\\ Heller \\321922001.ttr)
O'01130335 GC010?
l FOR ADOCK CGOOO216 GPU Nuc e r orporation is a subsdary of General Public Ut,lities Corporat:on
Soecial Report 9h09 Report Date:
January 3, 1992 Occurrence Datn November 15, 1991 Identification of Occurrence:
Non-functional fira diesel pump 12 was not restored to functional status within seven (7) days as required by technical specification 3.12.B.
Descr_ipfion of Occurrencel During a functional test, fire diesel pump 1-2 failed to meet the required acceptance criteria. The pump failed to obtain the requirement of 156 psig at a 2000 gpm-During testing at 2006 gpm the pump could only attain 78 psig.
Analysis of Occurrence:
Upon failing the functional test, a work request was submitted to restore the pump to functional status.
The Plant Maintenance Department removed and disassembled the pump discovering that a cloth rag had become lodged inside the pump.
It was determined that a gap between the basket strainer and the pump suction bell was large enough to allow this rag to enter the pump. During this time period, the 1-1 diesel fire pump and the redundant fire pump were available, if needed.
Thus the safety significance of this event was minimal.
Corrective Action:
Fire Diesel pump 12 was rebuilt and reinste11cd on 12/8/91. A corrective change was made to the basket strainer to reduce the gap at the pump suction bell.
After work was completed, an in-service test and a functional survelliance were performed on 12/11/91.
The pump was declared operable and returned to service on 12/12/91.
(Heller 321922001.ttr) i I
1